Korea2Canada
Hero Member
- Mar 4, 2013
- 11
- Category........
- Visa Office......
- Manila
- Job Offer........
- Pre-Assessed..
- App. Filed.......
- 07-05- 2013
- Doc's Request.
- 18-11- 2013
- AOR Received.
- 29-05-2013
- File Transfer...
- 30-05-2013
- Med's Request
- sent with app.
- Med's Done....
- 03-04-2013
- VISA ISSUED...
- waiting
- LANDED..........
- waiting
I picked up some numbered stickers and labels today from office depot to put on the back of my photos. Going to type captions and stick it on the back of the photos. This is what I have so far:
1) Hand writtten draft 1 of IMMI forms.
2) Started working on (typing in a msword doc) the IMMI form sections that do not have enough space - seperate sheets of paper. I put the following as headings in this doc: Form Number, Section Number, and the Title of the Section. I have one flowing document with matching headings and section numbers. My wife did same for her part as well.
3) Photocopies - made copies today of all required documents that are in English (passport, birth certificate, marriage certificate), etc.
4) Photos - doing this weekend
5) Korean Documents - going to Seoul in 2-3 weeks to get all those translated and notarized.
6) I expect to be doing a final draft of the forms in 3-4 weeks.
1) Hand writtten draft 1 of IMMI forms.
2) Started working on (typing in a msword doc) the IMMI form sections that do not have enough space - seperate sheets of paper. I put the following as headings in this doc: Form Number, Section Number, and the Title of the Section. I have one flowing document with matching headings and section numbers. My wife did same for her part as well.
3) Photocopies - made copies today of all required documents that are in English (passport, birth certificate, marriage certificate), etc.
4) Photos - doing this weekend
5) Korean Documents - going to Seoul in 2-3 weeks to get all those translated and notarized.
6) I expect to be doing a final draft of the forms in 3-4 weeks.