sharuu said:September - 1 week done, No PPR![]()
I think it would be soon, they are assigning secondary VOs to the May transferred files (2 cases reported in this forum). So it takes about 3/4 months after the transfer, may be you have to wait one more month. Problem is the long wait, if we are like 2012 applicants I would not mind waiting 4 more months. So many things have changed and life is getting very difficult. Hope we all get it soon. Meantime these posts (something new is happening / positive changes) keep our hopes floating.