NOC 2171 - as requested by Optimist3
Optimistic estimate = week 1 of Mar 15, to reach its CAPS.
Pessimistic estimate = week 4 of Feb 15, to reach its CAPS.
Some calculation below: Looking to the past 5 weeks updates in SS
[Sep 09] = Jump in caps (30) | Overall (191)
[Sep 15] = Jump in caps (42) | Overall (233)
[Sep 22] = Jump in caps (42) | Overall (275)
[Sep 30] = Jump in caps (36) | Overall (311)
[Oct 09] = Jump in caps (37) | Overall (348)
The average of last 5 weeks Jump in caps comes to (37), if we consider this figure as an average jump in remaining caps it will be estimated/assumed as under:
[week 4 Oct] = Jump in caps (37) | Overall (385)
[week 5 Oct] = Jump in caps (37) | Overall (422)
[week 2 Nov] = Jump in caps (37) | Overall (459)
[week 3 Nov] = Jump in caps (37) | Overall (496)
[week 4 Nov] = Jump in caps (37) | Overall (533)
[week 5 Nov] = Jump in caps (37) | Overall (570)
[week 1 Dec] = Jump in caps (37) | Overall (607)
[week 2 Dec] = Jump in caps (37) | Overall (644)
[week 3 Dec] = Jump in caps (37) | Overall (681)
[week 4 Nov] = Jump in caps (37) | Overall (718)
[week 2 Jan] = Jump in caps (37) | Overall (755)
[week 3 Jan] = Jump in caps (37) | Overall (792)
[week 4 Jan] = Jump in caps (37) | Overall (829)
[week 5 Jan] = Jump in caps (37) | Overall (866)
[week 2 Feb] = Jump in caps (37) | Overall (903)
[week 3 Feb] = Jump in caps (37) | Overall (940)
[week 4 Feb] = Jump in caps (37) | Overall (977)
[week 5 Feb] = Jump in caps (37) | Overall (1014) - so approx. 20 weeks for 1000 (including 2 weeks from xmas)
At present CIC started running after week 1 of July, with the above scenario if we do a math with appox. 20 weeks to reach its CAPS.
we can assume that by mid week of NOV apps, NOC 2171 will might get done with its limits/caps.
Above is purely based on last 5 weeks assumptions/median from only SS
*Disclaimer/T&C applies.