Rossei said:The excel sheet says "Cases", so I think 28,348 is a number of pending cases (backlogs). And 4,711 is a number of persons (as the total number of yearly processed matches with what CIC says on its website, roughly ~18K).
If all these are correct, I don't know what to say. 50K backlog will remain as long as this Govt. stays/ keeps taking 10K apps (18K persons) each year/ sticks to <20K yearly processing. If the this tri-factor doesn't change, the backlog doesn't change either...
Would be nice if they had a plan to process these sooner but 2.5-3 years isnt so bad if this includes everything. I was expecting to wait longer given the past trend.