Just want to share something and will seek for your advice...andito ako ulit sa forum after almost a year i think...since ang timeline ko is last July of 2011 pa...ang case ko for some who may not know is...

July 3rd week 2011 .... approval of Mississagua
August 2nd week 2011 .... submitted my Passport and additional documents with Appendix A
April 2012 .... asked for CAIPS result
June 2012 .... received letter saying that I did not meet the requirements for spouse visa
July 2012 .... submitted 18 Affidavits as a proof that I and my husband did not fall into common law
partner/conjugal (with an Atty in Winnipeg Canada)
October 2012 .... seek for help from an MP to have a detailed result since asking from our Atty cost too
much
January 2013 ... did ask help again from MP
February 8, 2012 .... received an email from CEM scheduled for an interview on March 20, 2013

.....hi sis emern, sa iyo ba nung time na ininterview ka, what are those questions they have asked you? i just want to prepare myself since i consider this as a big challenge dahil gusto ko everything will go smoothly and gusto ko ng magka visa...hirap na hirap na kami ng husband ko, and we all know ang hirap ng malayo sa asawa lalo na at wala pa kaming anak at the same time we are both getting older...

....kayo mgs sis and brothers who undergo an interview ano ung mga questions sa inyo para magka idea lang din ako...

Hi jen....this is it...ang mataggal ko ng hinihintay....

Hi nath and anton (which we have the same case)...eto nagpost na ko and as promised to both of you i will update whatever ang result ng case ko.

Please include me in your prayers...thanks
 

crisetphil

Hero Member
Jul 19, 2011
593
3
Category........
Visa Office......
Manila
Job Offer........
Pre-Assessed..
App. Filed.......
August 29,2011--CPC-M (sponsor approved::Nov.17, 2011)
Doc's Request.
dec.22,2011
AOR Received.
jan.04,2012(sent jan.23 received maybe jan.27 via quebec)
File Transfer...
dec.20,2011
Med's Request
medical result received feb.24,2012
Med's Done....
aug.09,2011//Jan21,2013//
Interview........
(n/a) /remed forwarded FEB.1,2013
Passport Req..
dec.22,2011(sent jan. 16,2012)
VISA ISSUED...
feb-20,2013/dm feb.22/receieved visa feb.23
wow congrats at least they gave u a chance to defend urself..hope postive lng...ubos na tayo 2011....gudluck
 

gina77

Star Member
Jan 6, 2012
67
0
Mandaluyong
Category........
Visa Office......
Manila
Job Offer........
Pre-Assessed..
App. Filed.......
28 October 2011
Doc's Request.
26 January 2012
AOR Received.
10 January 2012
File Transfer...
25 January 2012
Med's Request
April 2011
Med's Done....
Redo, expired 6 October 2012
Interview........
Waived
Passport Req..
13 February 2012-submitted
VISA ISSUED...
DM- 4 january 2013/visa delivered 8 january
LANDED..........
flight on 29 january 2013 PR card recieved...10feb
gimizz said:
Huwow! bilis naman:) san ka sa canada btw? wat work? ang bilis! congratz po:-D
Sa calgary PO kami, oo napakabilis nga unang interview ko natanggap na agad ako, madami naman work dito sa alberta rin kasi...at napakadami pa nga job offer na nag tatawagan but I decided na try ko muna yung nauna...
 

Tagum-N.B.

Champion Member
Jan 11, 2013
2,231
47
Category........
Visa Office......
manila
Job Offer........
Pre-Assessed..
App. Filed.......
11-01-2012
AOR Received.
manila 20-03-2012 in process july1, 2013
IELTS Request
remeds request july11 remed complete july17-aug 1
VISA ISSUED...
AUGUST 31.2013
LANDED..........
SEPTEMBER 25, 2013
judai said:
hello everyone.. im new here in this forum.
so just last dec.19 i send my passport, and on jan 28 they ask my CSQ. and i send my CSQ right away.
How long will i take to have my passport back?and do they send it with a visa stamp on it?.
and regarding for my E-CAS i cannot access to my E-CAS anymore.. Now,im very confused.
and i hope they will not hold my passport for long time because i am 2 months pregnant.. and the airlines will refuse me when
i reached 6 months pregnant.. :(
i need advice from you guys...
im very grateful i found this forum.. at least i know im not alone...
Sorry to say but u should plan on having ur baby where you live, the CEM is getting so slow you might have time to have a second baby b4 you get here. Manila is taking on all the other work of embassys closing down, japan korea etc etc, they promised they were fgoing to speed up the preocess but since sept 2011 the processing time went from 7 months to 12 months in manula
 

judai

Member
Feb 7, 2013
13
0
@ TAGUM -N.B
:( but will they send me back my passport with the visa stamp on it?

its been 9 months since we apply for SPOUSAL VISA.
and how long do i need to wait until they send the passport back?
the waiting is too much long... :mad:

thank you for the advice
 

Polgas

Champion Member
Jan 2, 2013
1,226
23
Two Six Double 0
Category........
Visa Office......
CEM
Job Offer........
Pre-Assessed..
App. Filed.......
JAN. 27, 2013
Doc's Request.
JUL. 23, 2013
Nomination.....
CSQ: APR. 10, 2013
AOR Received.
FEB. 13, 2013
File Transfer...
FEB. 21, 2013
Med's Done....
JAN. 07, 2013
Interview........
WAIVED
Passport Req..
JUL. 23, 2013
VISA ISSUED...
JAN. 08, 2014
LANDED..........
JAN. 31, 2014
mcm240906 said:
Hi To All....

Just want to share something and will seek for your advice...andito ako ulit sa forum after almost a year i think...since ang timeline ko is last July of 2011 pa...ang case ko for some who may not know is...

July 3rd week 2011 .... approval of Mississagua
August 2nd week 2011 .... submitted my Passport and additional documents with Appendix A
April 2012 .... asked for CAIPS result
June 2012 .... received letter saying that I did not meet the requirements for spouse visa
July 2012 .... submitted 18 Affidavits as a proof that I and my husband did not fall into common law
partner/conjugal (with an Atty in Winnipeg Canada)
October 2012 .... seek for help from an MP to have a detailed result since asking from our Atty cost too
much
January 2013 ... did ask help again from MP
February 8, 2012 .... received an email from CEM scheduled for an interview on March 20, 2013

.....hi sis emern, sa iyo ba nung time na ininterview ka, what are those questions they have asked you? i just want to prepare myself since i consider this as a big challenge dahil gusto ko everything will go smoothly and gusto ko ng magka visa...hirap na hirap na kami ng husband ko, and we all know ang hirap ng malayo sa asawa lalo na at wala pa kaming anak at the same time we are both getting older...

....kayo mgs sis and brothers who undergo an interview ano ung mga questions sa inyo para magka idea lang din ako...

Hi jen....this is it...ang mataggal ko ng hinihintay....

Hi nath and anton (which we have the same case)...eto nagpost na ko and as promised to both of you i will update whatever ang result ng case ko.

Please include me in your prayers...thanks
I hope everything is gonna be alright. Nandiyan po si LORD di po niya tayo pababayaan.
 

Tagum-N.B.

Champion Member
Jan 11, 2013
2,231
47
Category........
Visa Office......
manila
Job Offer........
Pre-Assessed..
App. Filed.......
11-01-2012
AOR Received.
manila 20-03-2012 in process july1, 2013
IELTS Request
remeds request july11 remed complete july17-aug 1
VISA ISSUED...
AUGUST 31.2013
LANDED..........
SEPTEMBER 25, 2013
The last update of processing was put up to 11 months from 9 months on dec4,2012, now on jan 16 just 5 weeks later they extended another month does that mean they did nothing since dec 4, im landing in manila on feb20 exactly 11 months from my processing time now i am not allowed to go to embassy because the waiting period has been extended to 12 months. Like i said b4 when i got married on sept 2,2011 they waiting period was only 7 months
 

crisetphil

Hero Member
Jul 19, 2011
593
3
Category........
Visa Office......
Manila
Job Offer........
Pre-Assessed..
App. Filed.......
August 29,2011--CPC-M (sponsor approved::Nov.17, 2011)
Doc's Request.
dec.22,2011
AOR Received.
jan.04,2012(sent jan.23 received maybe jan.27 via quebec)
File Transfer...
dec.20,2011
Med's Request
medical result received feb.24,2012
Med's Done....
aug.09,2011//Jan21,2013//
Interview........
(n/a) /remed forwarded FEB.1,2013
Passport Req..
dec.22,2011(sent jan. 16,2012)
VISA ISSUED...
feb-20,2013/dm feb.22/receieved visa feb.23
@ tagum

on our experience hubby visited me last dec.15 til jan10 2013.At dec.22 we stop by at cem...they not let us see the vo...if u insist they gave u a number to go up and that floor was just a reception...so still useless..they really insist to have only email enquiry and they have also a paper on ground floor for inquiry also which they pick it up every 2 hours.even hubby replied ur not responding our email she told the reception (they talk in french).we been there 8 am..no seat so we just stand at the lobby talking with the sg in there while w8ting for them to pick up the paper inquiry..cause my hubby put there that we r downstairs and he wants to talk with the vo holding our application...for too much bored of w8ting and hungry also we go up and eat upstairs there r restaurants while hubby emailing them same thing he said to the paper that we r waiting downstairs...but we gone downstairs we saw the inquiry box was empty already at exactly 10am...so we still waited dowstairs till we give up around 11:30am cause we need to check out in hotel and go to cebu which i live...
so hubby was discouraged about planning to go there with nothing...cause he not ask appointment also...but im not sure if they still accept appointment unless u have interview or visa pick up.And at that time i was already on 12 months but the processing was 9 months very exceed.i hope u understand my english :)peace

Gudluck
 

PAGASA

Member
Jan 19, 2013
15
0
mcm240906 said:
Hi To All....

Just want to share something and will seek for your advice...andito ako ulit sa forum after almost a year i think...since ang timeline ko is last July of 2011 pa...ang case ko for some who may not know is...

July 3rd week 2011 .... approval of Mississagua
August 2nd week 2011 .... submitted my Passport and additional documents with Appendix A
April 2012 .... asked for CAIPS result
June 2012 .... received letter saying that I did not meet the requirements for spouse visa
July 2012 .... submitted 18 Affidavits as a proof that I and my husband did not fall into common law
partner/conjugal (with an Atty in Winnipeg Canada)
October 2012 .... seek for help from an MP to have a detailed result since asking from our Atty cost too
much
January 2013 ... did ask help again from MP
February 8, 2012 .... received an email from CEM scheduled for an interview on March 20, 2013

.....hi sis emern, sa iyo ba nung time na ininterview ka, what are those questions they have asked you? i just want to prepare myself since i consider this as a big challenge dahil gusto ko everything will go smoothly and gusto ko ng magka visa...hirap na hirap na kami ng husband ko, and we all know ang hirap ng malayo sa asawa lalo na at wala pa kaming anak at the same time we are both getting older...

....kayo mgs sis and brothers who undergo an interview ano ung mga questions sa inyo para magka idea lang din ako...

Hi jen....this is it...ang mataggal ko ng hinihintay....

Hi nath and anton (which we have the same case)...eto nagpost na ko and as promised to both of you i will update whatever ang result ng case ko.

Please include me in your prayers...thanks
Hi sis! Curious lang po ako why do you think CEM doubted your relationship as spousal and categorized it
As common law?
Thank you po in advance for the reply.
 

computerangel

Hero Member
Aug 30, 2012
232
0
Philippines
Category........
Visa Office......
Manila
Job Offer........
Pre-Assessed..
App. Filed.......
OCtober 10, 2012
AOR Received.
November 14,2012
File Transfer...
Nov.26,2012
Med's Done....
sept. 14,2012
Interview........
Waived
Passport Req..
May 17,2013
VISA ISSUED...
july 02, 2013
LANDED..........
july 17, 2013
mcm240906 said:
Hi To All....

Just want to share something and will seek for your advice...andito ako ulit sa forum after almost a year i think...since ang timeline ko is last July of 2011 pa...ang case ko for some who may not know is...

July 3rd week 2011 .... approval of Mississagua
August 2nd week 2011 .... submitted my Passport and additional documents with Appendix A
April 2012 .... asked for CAIPS result
June 2012 .... received letter saying that I did not meet the requirements for spouse visa
July 2012 .... submitted 18 Affidavits as a proof that I and my husband did not fall into common law
partner/conjugal (with an Atty in Winnipeg Canada)
October 2012 .... seek for help from an MP to have a detailed result since asking from our Atty cost too
much
January 2013 ... did ask help again from MP
February 8, 2012 .... received an email from CEM scheduled for an interview on March 20, 2013

.....hi sis emern, sa iyo ba nung time na ininterview ka, what are those questions they have asked you? i just want to prepare myself since i consider this as a big challenge dahil gusto ko everything will go smoothly and gusto ko ng magka visa...hirap na hirap na kami ng husband ko, and we all know ang hirap ng malayo sa asawa lalo na at wala pa kaming anak at the same time we are both getting older...

....kayo mgs sis and brothers who undergo an interview ano ung mga questions sa inyo para magka idea lang din ako...

Hi jen....this is it...ang mataggal ko ng hinihintay....

Hi nath and anton (which we have the same case)...eto nagpost na ko and as promised to both of you i will update whatever ang result ng case ko.

Please include me in your prayers...thanks
Hi this is what i save in forums hope this help. I wish us luck just pray and let him guide u..

http://www.canadavisa.com/canada-immigration-discussion-board/spousal-interview-help-help-help-t104126.0.html
 

KMAEP

Hero Member
Mar 20, 2011
739
6
brampton
Category........
Job Offer........
Pre-Assessed..
App. Filed.......
JANUARY 4, 2011
Med's Done....
DECEMBER 9, 2010
Interview........
JUNE 28, 2011
Passport Req..
FEBRUARY 28, 2011
LANDED..........
SEPTEMBER 11, 2011
mcm240906 said:
Hi To All....

Just want to share something and will seek for your advice...andito ako ulit sa forum after almost a year i think...since ang timeline ko is last July of 2011 pa...ang case ko for some who may not know is...

July 3rd week 2011 .... approval of Mississagua
August 2nd week 2011 .... submitted my Passport and additional documents with Appendix A
April 2012 .... asked for CAIPS result
June 2012 .... received letter saying that I did not meet the requirements for spouse visa
July 2012 .... submitted 18 Affidavits as a proof that I and my husband did not fall into common law
partner/conjugal (with an Atty in Winnipeg Canada)
October 2012 .... seek for help from an MP to have a detailed result since asking from our Atty cost too
much
January 2013 ... did ask help again from MP
February 8, 2012 .... received an email from CEM scheduled for an interview on March 20, 2013

.....hi sis emern, sa iyo ba nung time na ininterview ka, what are those questions they have asked you? i just want to prepare myself since i consider this as a big challenge dahil gusto ko everything will go smoothly and gusto ko ng magka visa...hirap na hirap na kami ng husband ko, and we all know ang hirap ng malayo sa asawa lalo na at wala pa kaming anak at the same time we are both getting older...

....kayo mgs sis and brothers who undergo an interview ano ung mga questions sa inyo para magka idea lang din ako...

Hi jen....this is it...ang mataggal ko ng hinihintay....

Hi nath and anton (which we have the same case)...eto nagpost na ko and as promised to both of you i will update whatever ang result ng case ko.

Please include me in your prayers...thanks


@mcm240906

sorry about your case, but think positive...
i did undergo interview way back in may 2011.. most of the question are in the application form which is about your relationship with your husband/wife.. from the time you meet, how, where, the details , to the engagement party in details , wedding day etc.....

but in your case you did not meet the requirements for spouse visa?? did they give any details or reason?? if you are married you will not really fall under common law!! sorry im just curious whats the reason that you did not meet the requirement!!
 

KMAEP

Hero Member
Mar 20, 2011
739
6
brampton
Category........
Job Offer........
Pre-Assessed..
App. Filed.......
JANUARY 4, 2011
Med's Done....
DECEMBER 9, 2010
Interview........
JUNE 28, 2011
Passport Req..
FEBRUARY 28, 2011
LANDED..........
SEPTEMBER 11, 2011
judai said:
hello everyone.. im new here in this forum.
so just last dec.19 i send my passport, and on jan 28 they ask my CSQ. and i send my CSQ right away.
How long will i take to have my passport back?and do they send it with a visa stamp on it?.
and regarding for my E-CAS i cannot access to my E-CAS anymore.. Now,im very confused.
and i hope they will not hold my passport for long time because i am 2 months pregnant.. and the airlines will refuse me when
i reached 6 months pregnant.. :(
i need advice from you guys...
im very grateful i found this forum.. at least i know im not alone...
@ judaui
congratulations with the pregnancy..

from what i read the new processing time is 12 months, so that will be your basis.. but its not an assurance.. so you will be lucky if within 3-6 months you will have your visa, but you should be open and patience that it may take more than 12 months...

some airlines may still allow you even if your 8 or 9 months, just in case just ask your OB a letter or note that still safe for you and for the baby to fly..

think positive... :D :D
 

Polgas

Champion Member
Jan 2, 2013
1,226
23
Two Six Double 0
Category........
Visa Office......
CEM
Job Offer........
Pre-Assessed..
App. Filed.......
JAN. 27, 2013
Doc's Request.
JUL. 23, 2013
Nomination.....
CSQ: APR. 10, 2013
AOR Received.
FEB. 13, 2013
File Transfer...
FEB. 21, 2013
Med's Done....
JAN. 07, 2013
Interview........
WAIVED
Passport Req..
JUL. 23, 2013
VISA ISSUED...
JAN. 08, 2014
LANDED..........
JAN. 31, 2014
KMAEP said:
@ judaui
congratulations with the pregnancy..

from what i read the new processing time is 12 months, so that will be your basis.. but its not an assurance.. so you will be lucky if within 3-6 months you will have your visa, but you should be open and patience that it may take more than 12 months...

some airlines may still allow you even if your 8 or 9 months, just in case just ask your OB a letter or note that still safe for you and for the baby to fly..

think positive... :D :D
 

lizel

Star Member
Nov 26, 2012
196
1
Canada
Category........
Visa Office......
MANILA
Job Offer........
Pre-Assessed..
App. Filed.......
January 09, 2013
AOR Received.
January 26, 2013
Med's Done....
December 12, 2012
Passport Req..
JULY 2013
VISA ISSUED...
JAN 2014
LANDED..........
MAY 2013
Hay, salamat dumating na sa asawa ko yung Snail Mail ng approval niya bilang sponsor. Naconfirm lang kasi niya sa phone kaya antay talaga kami letter. Hayss sana kung gaano kabilis na approve ganun din kabilis ang labas ng visa natin lahat. :) andito nadaw sa Manila application namin sana mag confirm na ang CEM. Huhu pray lang tayo lahat na pabilisin ni God mga taga CEM. :) Goodnight sa lahat! God Bless us all!
 

blessedelaine

Hero Member
Dec 10, 2009
865
5
Winnipeg, Manitoba
Category........
Visa Office......
Manila
Job Offer........
Pre-Assessed..
App. Filed.......
61312 mailed out
Doc's Request.
n/a
Nomination.....
61512 CPC-M received
AOR Received.
82112- thru email
IELTS Request
n/a
File Transfer...
82712
Med's Request
n/a
Med's Done....
51012
Interview........
n/a
Passport Req..
012813-email/ Submitted all docs: 040213
VISA ISSUED...
042513 PDOS.......:042613
LANDED..........
050513
lizel said:
Hay, salamat dumating na sa asawa ko yung Snail Mail ng approval niya bilang sponsor. Naconfirm lang kasi niya sa phone kaya antay talaga kami letter. Hayss sana kung gaano kabilis na approve ganun din kabilis ang labas ng visa natin lahat. :) andito nadaw sa Manila application namin sana mag confirm na ang CEM. Huhu pray lang tayo lahat na pabilisin ni God mga taga CEM. :) Goodnight sa lahat! God Bless us all!
congrats! where are you heading to?