+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

Re: FSW 2014 Applicants Timeline- Lets Network Here.

sumitkumaragg

Hero Member
Apr 21, 2013
239
35
Winnipeg, Manitoba
Visa Office......
New Delhi
NOC Code......
Spouse visa
App. Filed.......
4th may 2017
AOR Received.
Not yet
Interview........
Hopefully not required.
LANDED..........
God's Mercy
psingh001 said:
********************UPDATED********************
Sorted Monthwise

Name / date of application / processing started / med request / medical received / DM DATE (Yes/awaiting) / PPR DATE

May
2) stayblessed / 14 May / Oct 14 / Nov 14 / Nov 14 / Waiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting
16) AnkurB/14-05-2014/23-01-2015/09-02-2015/25-02-2015/awaiting/awaiting
18) thumsup/May 8/Sep 18/ Sep 23/awaiting /awaiting
21) Coolguy31/May30/Sep 26/Oct 30/ Dec 8/Awaiting / Awaiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting


June
10) immig_it_guy/11 June/15th Oct/ 23rd December/2nd February/awaiting
17) Santosh0014/ 26-06-2014 / 12-12-2014 / 31-12-2014 / 13-01-2015 / Awaiting / Awaiting
23) meenu126/9th june 2014/nov 19 2014/nov 24 2014/ dec 5,2014/awaiting/awaiting
26) madhubalaji/25th june 2014/18th dec 2014/2nd jan 2015/14th jan 2015/awaiting/awaiting
37) agrineer/12-June-2014/28-Nov-2014/28-Nov-2014/11-Jan-2015/ Awaiting/Awaiting


July
1) psingh001 / 16July / 2Feb / 20Feb / 12Mar / awaiting / awaiting
3) pr4vj / 16July / 8Jan / 12Jan / 19Feb / awaiting / awaiting
6) manisha575/30th july/5th feb/21st feb/10th march/awaiting/awaiting
7) Away2014/ 21 July / 8 jan / 12 jan / 24 jan / awaiting /awaiting.....
9) priyavig /3rd july /19 jan /29 jan /1 april/ awaiting/ awaiting
20) EvanBourn/27th July/10th Jan/27th Jan/27th March/Awaiting/Awaiting
22) Monika Anand/4th July/12 MARCH/28th March/9th April /Awaiting/Awaiting
29) vivvisvk/ 18th July 2014/ 5 Feb 2015/ 21st Feb 2015/ 10th March 2015/ Awaiting/ Awaiting
30) webdev/24july/21Jan/20Feb/1Mar/Awaiting (DM PPR)
36) nitks.abhinav/14-Jul2014/31-Dec2014/15-Jan2015/18-Feb2015/ awaiting / awaiting

August
4) spanta/aug 21/28 feb/23 mar/8 april/awaiting/awaiting
5) Chink00/ 08Aug/30Jan/26Feb/6Mar/ awaiting / awaiting
8) Avataar/6th aug/2nd Jan/24th jan/12feb/awaiting/awaiting
13) Avinir/18 Aug/12 Feb/ 13 Mar/27 Mar/Awaiting
14) titans/15 Aug/12 Feb/Mar 14/Mar 27/ Awaiting/Awaiting
15) bhatia86/25aug/12feb/16mar/26mar/awaited/awaited
19) Ankush / 18/08/2014 / 19/02/2015 / 14/03/2015 / 25/03/2015 / Awaiting / Awaiting
24) Guri17/19th Aug 2014/23rd feb 2015/16th march 2015/10th april 2015/ awaiting / awaiting
25) V1313/08th Aug 2014/10th Feb 2015/13th March 2015/1st April/2015/awaiting / awaiting
28) jayanjkm/28th August 2014/March 10,2015/March 31, 2015/April 14,2015/Awaiting/Awaiting
31) Lordhelp/ aug 7/ feb 5/ feb 20/Mar 10/ awaiting/ awaiting
33) HereICome/18Aug2014/6Feb2015/28Feb2015/17Mar2015/Awaiting/Awaiting
34) alb123/1-Aug/3-Feb/28-Feb/21-Mar/ awaiting / awaiting
35) paramsaini83/8 Aug/1dec/3 Feb /13 Mar/ awaiting/awaiting
38) sumitkumaragg/8aug/1dec/12feb/16march/1april/awaited/awaited

September
27) Niagracalling/08 Sep/27 Feb/25 Mar/08 Apr/awaiting/awaiting
12) Harpreet Singh/19 Sept/10 March/31st March/14 April/ Awaiting/Awaiting
 

thependraw

Star Member
Aug 4, 2014
77
40
Category........
Visa Office......
NDVO
NOC Code......
2173
Job Offer........
Pre-Assessed..
App. Filed.......
30-07-2014
Med's Request
21-02-2015
Med's Done....
02-03-2015
Interview........
Waived
Passport Req..
31-03-2015
VISA ISSUED...
24-03-2015
LANDED..........
Somewhere in August 2015
inamul70 said:
Guys Finally My passport's is returning back..

Visa application, tracking ID No.20150401XXXXXXXXX – Your processed passport has been dispatched from the Canada Visa Office NEW DELHI, on 21/04/2015 to the Canada Visa Application Centre and is ready for collection. To know more, please call VAC helpline number or visit VAC website
congrats...finally things are moving.
 

thependraw

Star Member
Aug 4, 2014
77
40
Category........
Visa Office......
NDVO
NOC Code......
2173
Job Offer........
Pre-Assessed..
App. Filed.......
30-07-2014
Med's Request
21-02-2015
Med's Done....
02-03-2015
Interview........
Waived
Passport Req..
31-03-2015
VISA ISSUED...
24-03-2015
LANDED..........
Somewhere in August 2015
Jaxon911 said:
A1: It depends, there are options such as TransferWise online but they aren't safe so not advisable for large amount of funds. Banks are usually expensive, you'd need to google around to find out an online broker that is regulated / covered so that your money is safe
A2: You can transfer AS MUCH AS you like, there is no legal limit. Of course for amounts larger than certain limit, you might have to provide additional documents to prove that it's really your money and earned legally by paying taxes, by providing details of source of money!
A3: Don't know, best check their website. Give them a call, I'm sure they'll be happy to help you.
i have used transferwise to transfer some 2K usd from UK in chunks of 200. i think their service is reliable, fast, cheap and good.
 

Maharana

Star Member
Feb 11, 2015
68
2
NOC Code......
2172
Job Offer........
Pre-Assessed..
App. Filed.......
19-11-2014
Doc's Request.
NA
Nomination.....
10-02-2015
IELTS Request
Sent
quick question: CIC have asked for new FBI PCC along with MR.

our PCC has december 2014 date.

can we submit them with RPRF and MR?
 

frasiercrane

Hero Member
Aug 12, 2014
895
103
Category........
Visa Office......
New Delhi
NOC Code......
5125
Job Offer........
Pre-Assessed..
App. Filed.......
04-09-2014 DD encashed...: 26-11-2014
Nomination.....
19-12-2014 2nd line update: 20-03-2015
Med's Request
30-03-2015
Med's Done....
04-04-2015 3rd line update: 16-04-2015
Passport Req..
13-05-2015 DM: 15-05-2015
VISA ISSUED...
21-05-2015
alb123 said:
********************UPDATED********************
MAY, JUNE, JULY, AUGUST applicants awaiting DM and PPR please add your information in order below. It will give us an idea about DMs and PPRs. Thanks.
I am putting mine in order below:

Name / date of application / processing started / med request / medical received / DM DATE (Yes/awaiting) / PPR DATE

1) psingh001 / 16July / 2Feb / 20Feb / 12Mar / awaiting / awaiting
2) stayblessed / 14 May / Oct 14 / Nov 14 / Nov 14 / Waiting
3) pr4vj / 16July / 8Jan / 12Jan / 19Feb / awaiting / awaiting
4) spanta/aug 21/28 feb/23 mar/8 april/awaiting/awaiting
5) Chink00/ 08Aug/30Jan/26Feb/6Mar/ awaiting / awaiting
6) manisha575/30th july/5th feb/21st feb/10th march/awaiting/awaiting
7) Away2014/ 21 July / 8 jan / 12 jan / 24 jan / awaiting /awaiting.....
Cool Avataar/6th aug/2nd Jan/24th jan/12feb/awaiting/awaiting
9) priyavig /3rd july /19 jan /29 jan /1 april/ awaiting/ awaiting
10) immig_it_guy/11 June/15th Oct/ 23rd December/2nd February/awaiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting
12) Harpreet Singh/19 Sept/10 March/31st March/14 April/ Awaiting/Awaiting
13) Avinir/18 Aug/12 Feb/ 13 Mar/27 Mar/Awaiting
14) titans/15 Aug/12 Feb/Mar 14/Mar 27/ Awaiting/Awaiting
15) bhatia86/25aug/12feb/16mar/26mar/awaited/awaited
16) AnkurB/14-05-2014/23-01-2015/09-02-2015/25-02-2015/awaiting/awaiting
17) Santosh0014/ 26-06-2014 / 12-12-2014 / 31-12-2014 / 13-01-2015 / Awaiting / Awaiting
18) thumsup/May 8/Sep 18/ Sep 23/awaiting /awaiting
19) Ankush / 18/08/2014 / 19/02/2015 / 14/03/2015 / 25/03/2015 / Awaiting / Awaiting
20) EvanBourn/27th July/10th Jan/27th Jan/27th March/Awaiting/Awaiting
21) Coolguy31/May30/Sep 26/Oct 30/ Dec 8/Awaiting / Awaiting
22) Monika Anand/4th July/12 MARCH/28th March/9th April /Awaiting/Awaiting
23) meenu126/9th june 2014/nov 19 2014/nov 24 2014/ dec 5,2014/awaiting/awaiting
24) Titans/15Aug/Feb 12/Mar 14/Mar27/Awaiting/Awating
25) Guri17/19th Aug 2014/23rd feb 2015/16th march 2015/10th april 2015/ awaiting / awaiting
26) V1313/08th Aug 2014/10th Feb 2015/13th March 2015/1st April/2015/awaiting / awaiting
27) madhubalaji/25th june 2014/18th dec 2014/2nd jan 2015/14th jan 2015/awaiting/awaiting
28) vivvisvk/ 18th July 2014/ 5 Feb 2015/ 21st Feb 2015/ 10th March 2015/ Awaiting/ Awaiting
29) jayanjkm/28th August 2014/March 10,2015/March 31, 2015/April 14,2015/Awaiting/Awaiting
30) webdev/24july/21Jan/20Feb/1Mar/Awaiting (DM PPR)
31)deep1985/11March/27March/8April/Awaiting/Awaiting
32)HereICome/18Aug2014/6Feb2015/28Feb2015/17Mar2015/Awaiting/Awaiting
33)alb123/1-Aug/3-Feb/28-Feb/21-Mar/ awaiting / awaiting
34)Frasiercrane/4th Sep/17th March/30th March/16th April/ Awaiting / Awaiting

Note: Kindly Add in between the quotes only. Thanks & best of luck.
 

aspire2canadian

Star Member
Dec 6, 2014
62
16
INDIA
Category........
Visa Office......
NDVO
NOC Code......
2171
Job Offer........
Pre-Assessed..
App. Filed.......
02-09-2014
Nomination.....
16-12-2014
IELTS Request
Sent with Application
File Transfer...
2nd Line update on 20th March
Med's Request
01-04-2015
Med's Done....
Meds Done : 02-04-2015 , TL on 14-04-2015
Interview........
Hopefully..Waived
Passport Req..
Decision made - 30 may , PPR - 1st june
VISA ISSUED...
12-06-2015
LANDED..........
17-08-2015
psingh001 said:
********************UPDATED********************
Sorted Monthwise

Name / date of application / processing started / med request / medical received / DM DATE (Yes/awaiting) / PPR DATE

May
2) stayblessed / 14 May / Oct 14 / Nov 14 / Nov 14 / Waiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting
16) AnkurB/14-05-2014/23-01-2015/09-02-2015/25-02-2015/awaiting/awaiting
18) thumsup/May 8/Sep 18/ Sep 23/awaiting /awaiting
21) Coolguy31/May30/Sep 26/Oct 30/ Dec 8/Awaiting / Awaiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting


June
10) immig_it_guy/11 June/15th Oct/ 23rd December/2nd February/awaiting
17) Santosh0014/ 26-06-2014 / 12-12-2014 / 31-12-2014 / 13-01-2015 / Awaiting / Awaiting
23) meenu126/9th june 2014/nov 19 2014/nov 24 2014/ dec 5,2014/awaiting/awaiting
26) madhubalaji/25th june 2014/18th dec 2014/2nd jan 2015/14th jan 2015/awaiting/awaiting
37) agrineer/12-June-2014/28-Nov-2014/28-Nov-2014/11-Jan-2015/ Awaiting/Awaiting


July
1) psingh001 / 16July / 2Feb / 20Feb / 12Mar / awaiting / awaiting
3) pr4vj / 16July / 8Jan / 12Jan / 19Feb / awaiting / awaiting
6) manisha575/30th july/5th feb/21st feb/10th march/awaiting/awaiting
7) Away2014/ 21 July / 8 jan / 12 jan / 24 jan / awaiting /awaiting.....
9) priyavig /3rd july /19 jan /29 jan /1 april/ awaiting/ awaiting
20) EvanBourn/27th July/10th Jan/27th Jan/27th March/Awaiting/Awaiting
22) Monika Anand/4th July/12 MARCH/28th March/9th April /Awaiting/Awaiting
29) vivvisvk/ 18th July 2014/ 5 Feb 2015/ 21st Feb 2015/ 10th March 2015/ Awaiting/ Awaiting
30) webdev/24july/21Jan/20Feb/1Mar/Awaiting (DM PPR)
36) nitks.abhinav/14-Jul2014/31-Dec2014/15-Jan2015/18-Feb2015/ awaiting / awaiting

August
4) spanta/aug 21/28 feb/23 mar/8 april/awaiting/awaiting
5) Chink00/ 08Aug/30Jan/26Feb/6Mar/ awaiting / awaiting
8) Avataar/6th aug/2nd Jan/24th jan/12feb/awaiting/awaiting
13) Avinir/18 Aug/12 Feb/ 13 Mar/27 Mar/Awaiting
14) titans/15 Aug/12 Feb/Mar 14/Mar 27/ Awaiting/Awaiting
15) bhatia86/25aug/12feb/16mar/26mar/awaited/awaited
19) Ankush / 18/08/2014 / 19/02/2015 / 14/03/2015 / 25/03/2015 / Awaiting / Awaiting
24) Guri17/19th Aug 2014/23rd feb 2015/16th march 2015/10th april 2015/ awaiting / awaiting
25) V1313/08th Aug 2014/10th Feb 2015/13th March 2015/1st April/2015/awaiting / awaiting
28) jayanjkm/28th August 2014/March 10,2015/March 31, 2015/April 14,2015/Awaiting/Awaiting
31) Lordhelp/ aug 7/ feb 5/ feb 20/Mar 10/ awaiting/ awaiting
33) HereICome/18Aug2014/6Feb2015/28Feb2015/17Mar2015/Awaiting/Awaiting
34) alb123/1-Aug/3-Feb/28-Feb/21-Mar/ awaiting / awaiting
35) paramsaini83/8 Aug/1dec/3 Feb /13 Mar/ awaiting/awaiting

September
26) aspire2canadian/02 Sep/17th Mar/1st Apr/14th Apr/awaiting/awaiting
27) Niagracalling/08 Sep/27 Feb/25 Mar/08 Apr/awaiting/awaiting
12) Harpreet Singh/19 Sept/10 March/31st March/14 April/ Awaiting/Awaiting
 

frasiercrane

Hero Member
Aug 12, 2014
895
103
Category........
Visa Office......
New Delhi
NOC Code......
5125
Job Offer........
Pre-Assessed..
App. Filed.......
04-09-2014 DD encashed...: 26-11-2014
Nomination.....
19-12-2014 2nd line update: 20-03-2015
Med's Request
30-03-2015
Med's Done....
04-04-2015 3rd line update: 16-04-2015
Passport Req..
13-05-2015 DM: 15-05-2015
VISA ISSUED...
21-05-2015
psingh001 said:
********************UPDATED********************
Sorted Monthwise

Name / date of application / processing started / med request / medical received / DM DATE (Yes/awaiting) / PPR DATE

May
2) stayblessed / 14 May / Oct 14 / Nov 14 / Nov 14 / Waiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting
16) AnkurB/14-05-2014/23-01-2015/09-02-2015/25-02-2015/awaiting/awaiting
18) thumsup/May 8/Sep 18/ Sep 23/awaiting /awaiting
21) Coolguy31/May30/Sep 26/Oct 30/ Dec 8/Awaiting / Awaiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting


June
10) immig_it_guy/11 June/15th Oct/ 23rd December/2nd February/awaiting
17) Santosh0014/ 26-06-2014 / 12-12-2014 / 31-12-2014 / 13-01-2015 / Awaiting / Awaiting
23) meenu126/9th june 2014/nov 19 2014/nov 24 2014/ dec 5,2014/awaiting/awaiting
26) madhubalaji/25th june 2014/18th dec 2014/2nd jan 2015/14th jan 2015/awaiting/awaiting
37) agrineer/12-June-2014/28-Nov-2014/28-Nov-2014/11-Jan-2015/ Awaiting/Awaiting


July
1) psingh001 / 16July / 2Feb / 20Feb / 12Mar / awaiting / awaiting
3) pr4vj / 16July / 8Jan / 12Jan / 19Feb / awaiting / awaiting
6) manisha575/30th july/5th feb/21st feb/10th march/awaiting/awaiting
7) Away2014/ 21 July / 8 jan / 12 jan / 24 jan / awaiting /awaiting.....
9) priyavig /3rd july /19 jan /29 jan /1 april/ awaiting/ awaiting
20) EvanBourn/27th July/10th Jan/27th Jan/27th March/Awaiting/Awaiting
22) Monika Anand/4th July/12 MARCH/28th March/9th April /Awaiting/Awaiting
29) vivvisvk/ 18th July 2014/ 5 Feb 2015/ 21st Feb 2015/ 10th March 2015/ Awaiting/ Awaiting
30) webdev/24july/21Jan/20Feb/1Mar/Awaiting (DM PPR)
36) nitks.abhinav/14-Jul2014/31-Dec2014/15-Jan2015/18-Feb2015/ awaiting / awaiting

August
4) spanta/aug 21/28 feb/23 mar/8 april/awaiting/awaiting
5) Chink00/ 08Aug/30Jan/26Feb/6Mar/ awaiting / awaiting
8) Avataar/6th aug/2nd Jan/24th jan/12feb/awaiting/awaiting
13) Avinir/18 Aug/12 Feb/ 13 Mar/27 Mar/Awaiting
14) titans/15 Aug/12 Feb/Mar 14/Mar 27/ Awaiting/Awaiting
15) bhatia86/25aug/12feb/16mar/26mar/awaited/awaited
19) Ankush / 18/08/2014 / 19/02/2015 / 14/03/2015 / 25/03/2015 / Awaiting / Awaiting
24) Guri17/19th Aug 2014/23rd feb 2015/16th march 2015/10th april 2015/ awaiting / awaiting
25) V1313/08th Aug 2014/10th Feb 2015/13th March 2015/1st April/2015/awaiting / awaiting
28) jayanjkm/28th August 2014/March 10,2015/March 31, 2015/April 14,2015/Awaiting/Awaiting
31) Lordhelp/ aug 7/ feb 5/ feb 20/Mar 10/ awaiting/ awaiting
33) HereICome/18Aug2014/6Feb2015/28Feb2015/17Mar2015/Awaiting/Awaiting
34) alb123/1-Aug/3-Feb/28-Feb/21-Mar/ awaiting / awaiting
35) paramsaini83/8 Aug/1dec/3 Feb /13 Mar/ awaiting/awaiting

September
27) Niagracalling/08 Sep/27 Feb/25 Mar/08 Apr/awaiting/awaiting
12) Harpreet Singh/19 Sept/10 March/31st March/14 April/ Awaiting/Awaiting
38) Frasiercrane/4th Sep/17th March/31st March/16th April/ Awaiting / Awaiting
 

Parincanada

Star Member
Oct 26, 2014
69
2
Category........
Visa Office......
NDVO
NOC Code......
2132
Job Offer........
Pre-Assessed..
App. Filed.......
04-06-2014
Med's Request
WAITING
A quick question please:

Can i send packet directly to NDVO for submitting MR reciepts, PCC , RPRF draft? I am asking because my agent asked me to handover this packet to him as I cannot communicate with NDVO straightaway as he is representative of my case...

I dont feel any need of this as it is not communication...its just courier,,,no matter from where its dispatched...

I have less days left to send it so dnt want to go to agent first and then he will take is odd time to check all...

Please advise
 

CanDoIt

Hero Member
Apr 30, 2014
415
35
Bangalore
Category........
Visa Office......
NDVO
NOC Code......
2171
Job Offer........
Pre-Assessed..
App. Filed.......
14-05-2014 Re-Applied: 20-08-2014
Nomination.....
09-12-2014
AOR Received.
17-02-2015
Med's Request
20-03-2015
Med's Done....
25-03-2015 Third Line: 14-04-2015
Interview........
Waived By God's Grace!
Passport Req..
13-05-2015
VISA ISSUED...
28-05-2015
LANDED..........
Late July or Early August
********************UPDATED********************
MAY, JUNE, JULY, AUGUST applicants awaiting DM and PPR please add your information in order below. It will give us an idea about DMs and PPRs. Thanks.
I am putting mine in order below:

Name / date of application / processing started / med request / medical received / DM DATE (Yes/awaiting) / PPR DATE

1) psingh001 / 16July / 2Feb / 20Feb / 12Mar / awaiting / awaiting
2) stayblessed / 14 May / Oct 14 / Nov 14 / Nov 14 / Waiting
3) pr4vj / 16July / 8Jan / 12Jan / 19Feb / awaiting / awaiting
4) spanta/aug 21/28 feb/23 mar/8 april/awaiting/awaiting
5) Chink00/ 08Aug/30Jan/26Feb/6Mar/ awaiting / awaiting
6) manisha575/30th july/5th feb/21st feb/10th march/awaiting/awaiting
7) Away2014/ 21 July / 8 jan / 12 jan / 24 jan / awaiting /awaiting.....
Cool Avataar/6th aug/2nd Jan/24th jan/12feb/awaiting/awaiting
9) priyavig /3rd july /19 jan /29 jan /1 april/ awaiting/ awaiting
10) immig_it_guy/11 June/15th Oct/ 23rd December/2nd February/awaiting
11) auto_art / 14 May / Feb 15 / Mar 15 / Mar 15 / Waiting /awaiting
12) Harpreet Singh/19 Sept/10 March/31st March/14 April/ Awaiting/Awaiting
13) Avinir/18 Aug/12 Feb/ 13 Mar/27 Mar/Awaiting
14) titans/15 Aug/12 Feb/Mar 14/Mar 27/ Awaiting/Awaiting
15) bhatia86/25aug/12feb/16mar/26mar/awaited/awaited
16) AnkurB/14-05-2014/23-01-2015/09-02-2015/25-02-2015/awaiting/awaiting
17) Santosh0014/ 26-06-2014 / 12-12-2014 / 31-12-2014 / 13-01-2015 / Awaiting / Awaiting
18) thumsup/May 8/Sep 18/ Sep 23/awaiting /awaiting
19) Ankush / 18/08/2014 / 19/02/2015 / 14/03/2015 / 25/03/2015 / Awaiting / Awaiting
20) EvanBourn/27th July/10th Jan/27th Jan/27th March/Awaiting/Awaiting
21) Coolguy31/May30/Sep 26/Oct 30/ Dec 8/Awaiting / Awaiting
22) Monika Anand/4th July/12 MARCH/28th March/9th April /Awaiting/Awaiting
23) meenu126/9th june 2014/nov 19 2014/nov 24 2014/ dec 5,2014/awaiting/awaiting
24) Titans/15Aug/Feb 12/Mar 14/Mar27/Awaiting/Awating
25) Guri17/19th Aug 2014/23rd feb 2015/16th march 2015/10th april 2015/ awaiting / awaiting
26) V1313/08th Aug 2014/10th Feb 2015/13th March 2015/1st April/2015/awaiting / awaiting
27) madhubalaji/25th june 2014/18th dec 2014/2nd jan 2015/14th jan 2015/awaiting/awaiting
28) vivvisvk/ 18th July 2014/ 5 Feb 2015/ 21st Feb 2015/ 10th March 2015/ Awaiting/ Awaiting
29) jayanjkm/28th August 2014/March 10,2015/March 31, 2015/April 14,2015/Awaiting/Awaiting
30) webdev/24july/21Jan/20Feb/1Mar/Awaiting (DM PPR)
31)deep1985/11March/27March/8April/Awaiting/Awaiting
32)HereICome/18Aug2014/6Feb2015/28Feb2015/17Mar2015/Awaiting/Awaiting
33)alb123/1-Aug/3-Feb/28-Feb/21-Mar/ awaiting / awaiting
34)Frasiercrane/4th Sep/17th March/30th March/16th April/ Awaiting / Awaiting
35)CanDoIt/20th Aug/17th Feb/20th Mar/14th April/Awaiting/Awaiting

Note: Kindly Add in between the quotes only. Thanks & best of luck.
 

vansharora

Star Member
Nov 9, 2014
75
14
Category........
Visa Office......
WARSAW
NOC Code......
0121
Job Offer........
Pre-Assessed..
App. Filed.......
22 Dec 2014
Nomination.....
PER 10 Mar
AOR Received.
21 May
File Transfer...
SLU 7-July
Med's Request
8 July
Med's Done....
13 July & TLU 21 July
Interview........
Waived off ... DM 22 Aug
Passport Req..
4 Sep 2015
VISA ISSUED...
9 Sep 2015
LANDED..........
Soon....
Got my PER on 10th of march but haven't received AOR mail yet. Called up CIC they said me that my file has been transferred to WARSAW VO on 20th march but still no reply from their side.

I need to update my employment changes... can anybody guide me what is the process for that... which documents should i send and to which address... or should i raise a CSE and upload the employment changes there....n what all docs are required...
Pls guide...
 

naijacanada

Full Member
Apr 21, 2015
20
0
Hello friends,

I have been a silent reader of this great forum and i most thank you all for your love in this lovely forum

Please i need your help.

My application has not been straight forward as me and my fianc'e applied for 2014 FSW and luckily both application receive PER. But now we are married. I married since December last year but yet to tell Accra Visa office about my marriage

We have not told AVO about our marriage because they asked for more doc in regards to my own application since they have started processing mine which i provided to them

Now I have done my medical and also sent a bank draft for the RPRF and also updated schedule A form last month but yet to tell AVO that i am married. I am actually waiting till they ask for my passport before i tell them about our marriage

1)Do you think this is good thing to do or i should tell me now that i am married before they request for passport?

2)Is there any possibility of refusal even after medical?

3)My wife is still in Nigeria while am in UK, would that affect anything?

I will really appreciate your help here

Thank you

App recv: 12th June 2014
Per : 11th Oct 2014
More Doc requested and sent : 16th Feb 2015
Medical recd: 17th March 2015
Medical done : 24th March 2015
 

faiiz04

Full Member
Dec 22, 2014
30
6
Mumbai
Category........
Visa Office......
New Delhi
NOC Code......
1212
Job Offer........
Pre-Assessed..
App. Filed.......
29-Dec-2014
Nomination.....
26-03-2015 PER
IELTS Request
Sent with Application
HI All,

Bro's Pls can someone let me know the contents of all the line updates.

I asked this question b4 but to no avail.

Thanks.
 

mk.2382

Hero Member
May 16, 2014
204
21
Category........
Visa Office......
New Delhi
NOC Code......
0111
Job Offer........
Pre-Assessed..
App. Filed.......
App Rchd: 02-JUL-2014
AOR Received.
PER: 28-OCT-2014
File Transfer...
Processing started: 28-JAN-2014
Med's Request
10-FEB-2015
Med's Done....
05-MAR-2015
Passport Req..
DM 25-JUL-2015, PPR 29-JUL-2015
VISA ISSUED...
06-AUG-2015
LANDED..........
Hopefully in 2015 only
faiiz04 said:
HI All,

Bro's Pls can someone let me know the contents of all the line updates.

I asked this question b4 but to no avail.

Thanks.
Line 1: "We received you application for permanent residence on XX-XXX-XXXX" means you application has moved out of Nova Scotia and reached local VO.
Line 2: "We started processing you application on XX-XXX-XXXX" means after clearing all backlog, background and documentation checks are almost over for your application too. You may get MR and RPRF request soon.
Line 3: "Medical results have been received" ... Self explanatory
Line 4: "Decision has been made on your application"... again self explanatory for most cases and means good news too for most cases, unless this message is appearing under Line 3 which means nothing else but rejection on some serious grounds.

Hope this helps.