31 days.@wan11knu How long did it approximately take you to receive your GCMS notes? I'm also waiting for mine to arrive.
31 days.@wan11knu How long did it approximately take you to receive your GCMS notes? I'm also waiting for mine to arrive.
What was the status of Selection-EE Econ in your first GCMS notes? In my notes Type 11.2-EE MI is MET but EE-Econ is not started.Hi All.I received my second set of GCMS notes yesterday. Some points that I would like to highlight here:
-Primary office: New Delhi, Secondary Office: CIO Sydney. My file was transferred to NDVO on 8/8/2017.
FYI there was a due date of 28/7/2017 mentioned in my first set of GCMS notes.
- File was transferred due to workload distribution.
- 8/8/2017 - the agent at CIO checked my eligibility and was satisfied with the documents provided(A11.2 met). This is mentioned in the notes. However, the agent reset the eligibility status to “Not Started” before transferring to NDVO. In eligibility the agent has checked for FSW selection criteria, CRS points, NOC code and duties of the employment letter.
- 21/8/2017 - NDVO received the status for my spouse’s US visa rejection which was updated. On this day the officer at NDVO also reviewed all travel/personal history and other documents.
- 22/8/2017 - BGC changed to in progress.
- 24/8/2017 – Officer at NDVO reviewed the file and cleared it from all aspects. PPR was issued. I can also see the counterfoil number etc. So for those who take the CIO – LVO route your file is reviewed by Program assistant – Agent – Officer at LVO
Luckily my GCMS notes were generated on the same day I got PPR, so it captures everything.
Did you get a PPR mail or a request in CIC account as pdf???I got PPR. PNP outland NDVO
My Timeline:
AOR: 10th Feb
Meds: 10th Mar
IP1: 10th Mar
NA 10th May
IP2 and PPR: 7th Sep
file transferred to NDVO on 19th July
Congrats bro! and what time ist?Did you get a PPR mail or a request in CIC account as pdf???
In the first set it says Not started(24/6). Then second set shows met (8/8), Not started(9/8) which is when it was transferred to NDVO. Finally met on 24/8What was the status of Selection-EE Econ in your first GCMS notes? In my notes Type 11.2-EE MI is MET but EE-Econ is not started.
Thankyou!In the first set it says Not started(24/6). Then second set shows met (8/8), Not started(9/8) which is when it was transferred to NDVO. Finally met on 24/8
I got PPR. PNP outland NDVO
My Timeline:
AOR: 10th Feb
Meds: 10th Mar
IP1: 10th Mar
NA 10th May
IP2 and PPR: 7th Sep
file transferred to NDVO on 19th July
Thanks I got email about a message in CIC account at about 11.50 amCongrats bro! and what time ist?
Thanks Pal. All the best to youCongratulations mate
I am also from FST outlandFederal skilled trades.... outland
Most probably, your file would have been transferred to Ndvo. Send them a mail right away or Call them after a day or two to confirm your VO.Just noticed a change in my status.
Review of additional documents : We do not need additional documents.
It was earlier : The additional documents you have provided are being reviewed
Does it mean that my File has been transferred to NDVO or CPC- Ottawa?
AOR: 11th July
Medical Passed : 24th July
Additional Document status changed : 8th September
BG: NA
Category:FSWO
Visa Office : CIO Sydney
Thanks Scorpman21.Most probably, your file would have been transferred to Ndvo. Send them a mail right away or Call them after a day or two to confirm your VO.