I have something to ask. Me and my husband has gone through the medical process on 2nd April and on 4th April, I had sent the RPRF fees. Till now, there is no status change on the E-Cas system.
On 13th May, I have received a post from London VO. They have sent us back the pictures of our marriage that we had sent when we had submitted our file with the marriage certificate. Someone had said to us to attach some pics as proof..so we did. I am assuming that they don't need them anymore but I am not sure as there was no letter with it but only pics.
Now my concern is why exactly they have sent the pics back and too without any letter. Also, the e-cas system is still showing In process and not Med received. I remember they had written in the Med request e-mail that do not contact us within 4 months time unless there is something very urgent.
Please suggest me what shall I do in this case?? Shall I wait for say another month or write to them??
Please help. Thanks
My timeline: MPNP 22/12/11 Additional Doc 07/02/12 LOA 12/05/12 App sent to CIO 03/08/12 AOR 13/10/12 E-cas status change from App rcvd to In process 10/12/12 RPRF & med 13/12/12 (lost-never got it) RPRF and Med again (after I had sent them an email) 27/03/13 Sent 04/04/13
On 13th May, I have received a post from London VO. They have sent us back the pictures of our marriage that we had sent when we had submitted our file with the marriage certificate. Someone had said to us to attach some pics as proof..so we did. I am assuming that they don't need them anymore but I am not sure as there was no letter with it but only pics.
Now my concern is why exactly they have sent the pics back and too without any letter. Also, the e-cas system is still showing In process and not Med received. I remember they had written in the Med request e-mail that do not contact us within 4 months time unless there is something very urgent.
Please suggest me what shall I do in this case?? Shall I wait for say another month or write to them??
Please help. Thanks
My timeline: MPNP 22/12/11 Additional Doc 07/02/12 LOA 12/05/12 App sent to CIO 03/08/12 AOR 13/10/12 E-cas status change from App rcvd to In process 10/12/12 RPRF & med 13/12/12 (lost-never got it) RPRF and Med again (after I had sent them an email) 27/03/13 Sent 04/04/13