JBZZS said:
I think 13 Dec 2013 was due to some additional docs that I sent in Early Oct ... Once u send some docs they put 2 months to recheck if they received those docs

My file was received in LVO in Aug and a Visa officer was assigned to my file in Sep.

the same was the case with Jigzzy. His file was also assigned to a visa officer in Aug I think
Hummm thanks JBZZS. So that means we can expect some thing in 1st quarter of 2014.
Time to hibernate.....
 

Maria_Sal

Hero Member
Feb 5, 2012
642
20
United Arab Emirates
Category........
Visa Office......
London
NOC Code......
2147
Job Offer........
Pre-Assessed..
App. Filed.......
23-May-2013 PER Received: 07-Aug-2013
File Transfer...
19-Aug-2013
Med's Request
10-Jan-2014
Med's Done....
13-Jan-2014, Uploaded 16-Jan, ECAS 3rd line 'Medicals received' 20-Jan
Interview........
Waived
Passport Req..
PPR1:14-July-2014, PPR2:28-July-2014
VISA ISSUED...
Received passports with visa on 14-Aug-2014 :)
LANDED..........
inshaAllah in Jan-2015
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.
 

Soundless

Hero Member
May 24, 2013
933
90
Category........
Visa Office......
London
NOC Code......
2174
Job Offer........
Pre-Assessed..
App. Filed.......
23/05/2013
Med's Request
02/04/2014
Med's Done....
12/04/2014
Interview........
27/02/2014
Passport Req..
14/08/2014
VISA ISSUED...
22/09/2014
LANDED..........
31-Mar-2015
Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.

+1 for such detailed analysis.

We are waiting your GCMS notes to see if anything happened between the period I requested my GCMS notes on Dec. 5th and yours maybe Jan 5th
 

imranrao

Member
Nov 21, 2013
17
0
124
Pakistan
Category........
Visa Office......
LVO
NOC Code......
7251
Job Offer........
Pre-Assessed..
App. Filed.......
20-04-2012
Doc's Request.
NO
Nomination.....
..
AOR Received.
30-04-2012
IELTS Request
Sent with the dox
Med's Request
waiting ... Insha Allah soon
Med's Done....
N/A
Interview........
Insha Allah waived
LANDED..........
When Allah Almighty wants..
Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.
Really good analysis dear please can you tell us about our medical status because we are MI3 April 2012 applicants. I hope they will work about our applications as well.
Imran Rao
 

Maria_Sal

Hero Member
Feb 5, 2012
642
20
United Arab Emirates
Category........
Visa Office......
London
NOC Code......
2147
Job Offer........
Pre-Assessed..
App. Filed.......
23-May-2013 PER Received: 07-Aug-2013
File Transfer...
19-Aug-2013
Med's Request
10-Jan-2014
Med's Done....
13-Jan-2014, Uploaded 16-Jan, ECAS 3rd line 'Medicals received' 20-Jan
Interview........
Waived
Passport Req..
PPR1:14-July-2014, PPR2:28-July-2014
VISA ISSUED...
Received passports with visa on 14-Aug-2014 :)
LANDED..........
inshaAllah in Jan-2015
I/We really hope to hear the good news with the beginning of the year 2014..
inshaAllah 2014 will bring lots of celebrations...like how NDVO is celebrating nowadays and CPP-O already did...n other visa offices ofcourse...

2015 we all will be in canada inshaAllah ;)
 

hila01

Hero Member
Jul 7, 2013
775
21
Category........
Visa Office......
London
Job Offer........
Pre-Assessed..
App. Filed.......
May 2013
LANDED..........
August 2014.
Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.



Thanks Maria for all the analysis. I have always been and will remain optimistic about LVO processing our applications within 1 year. +1 for u.
 

luqi

Champion Member
May 23, 2013
1,449
49
Category........
Visa Office......
London<br/>[color=#CC9900][b]NOC code:................2147[/b][/color]<br/>IELTS:....: sent with application
Job Offer........
Pre-Assessed..
App. Filed.......
[b]03-07-2013[/b]<br/>[color=yellowgreen][b]Fee charged.........: 23-09-2013 [/b][/color]<br/>[color=green][b]PER Received.......: 24-09-2013[/b][/color]<br/>[color=#C46767][b]Processing Started:21-01-2014[/b][/color]<br/>[color=#4E1D1D][b]Docs Request: 28-01-2014[/b][/color]<br/>
Med's Request
21-01-2016
Med's Done....
01-02-2016
Interview........
Waived
Passport Req..
08-02-2016
VISA ISSUED...
20-03-2016
LANDED..........
[b][color=#800000]Landed 18th April 2016[/color][/b]
Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.
it really motivates us. +1 maria
 

luqi

Champion Member
May 23, 2013
1,449
49
Category........
Visa Office......
London<br/>[color=#CC9900][b]NOC code:................2147[/b][/color]<br/>IELTS:....: sent with application
Job Offer........
Pre-Assessed..
App. Filed.......
[b]03-07-2013[/b]<br/>[color=yellowgreen][b]Fee charged.........: 23-09-2013 [/b][/color]<br/>[color=green][b]PER Received.......: 24-09-2013[/b][/color]<br/>[color=#C46767][b]Processing Started:21-01-2014[/b][/color]<br/>[color=#4E1D1D][b]Docs Request: 28-01-2014[/b][/color]<br/>
Med's Request
21-01-2016
Med's Done....
01-02-2016
Interview........
Waived
Passport Req..
08-02-2016
VISA ISSUED...
20-03-2016
LANDED..........
[b][color=#800000]Landed 18th April 2016[/color][/b]
Maria_Sal said:
I/We really hope to hear the good news with the beginning of the year 2014..
inshaAllah 2014 will bring lots of celebrations...like how NDVO is celebrating nowadays and CPP-O already did...n other visa offices ofcourse...

2015 we all will be in canada inshaAllah ;)
Inshallah
 

Abu Hassaan

Champion Member
Oct 27, 2013
1,589
106
Job Offer........
Pre-Assessed..
I totally agree with the analysis Maria. +1 for you buddy.

Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.
 

tashford

Hero Member
May 20, 2013
329
8
Job Offer........
Pre-Assessed..
Great work lets all just hope you are correct.

We'll see next year I guess..

Lets just keep posting our GCMS results and analyse them to see if there are ay changes.
 

irfanyusuf

Star Member
Apr 12, 2012
147
6
Category........
Visa Office......
London
NOC Code......
2132
Job Offer........
Pre-Assessed..
App. Filed.......
May 13, 2013
AOR Received.
PER: July 25, 13
File Transfer...
2nd line to ECAS. Process started June 18th
Med's Done....
Sept 2014
Passport Req..
Nov 26, 2014
Good analysis Maria. In addition to the reasons you wrote about slowness of LVO, I would say that LVO is probably the biggest VO handling applications from over 15 countries i-e Bahrain, Channel Islands, Denmark, England, Falkland Islands, Faroe Islands, Finland, Gibraltar, Greenland, Iceland, Ireland, Kuwait, Northern Ireland, Norway, Oman, Pakistan, Qatar, Saudi Arabia, Scotland, Svalbard, Sweden, United Arab Emirates, UK, Wales, Yemen. Isn't it strange .................. So in addition to large number of applications they process, it is the diversified and much varying process for background checks for each country that may delay the process further.

GCMS notes shared by you people point that LVO hasn't yet started the security checks or any other evaluation .......... This shows that LVO (if not on strike) is still busy with clearing the backlog. But when I contacted two 2011 applicants from Pakistan (now in Canada), to my surprise both of them got their MR within 9 months of the initial application submission to CIO and got the visas in around 3-4 months of Medicals. This dilutes the thought LVO being busy with backlogs.

I second that we all must write to minister and the LVO itself for the delay in processing, with regular but polite follow-up as well. It will be good if we also request the mistier for introducing 2-3 VOs on urgent basis to handle the cases from the above countries which will eventually speed up the progress.



Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

[/b]
 

Soundless

Hero Member
May 24, 2013
933
90
Category........
Visa Office......
London
NOC Code......
2174
Job Offer........
Pre-Assessed..
App. Filed.......
23/05/2013
Med's Request
02/04/2014
Med's Done....
12/04/2014
Interview........
27/02/2014
Passport Req..
14/08/2014
VISA ISSUED...
22/09/2014
LANDED..........
31-Mar-2015
irfanyusuf said:
Good analysis Maria. In addition to the reasons you wrote about slowness of LVO, I would say that LVO is probably the biggest VO handling applications from over 15 countries i-e Bahrain, Channel Islands, Denmark, England, Falkland Islands, Faroe Islands, Finland, Gibraltar, Greenland, Iceland, Ireland, Kuwait, Northern Ireland, Norway, Oman, Pakistan, Qatar, Saudi Arabia, Scotland, Svalbard, Sweden, United Arab Emirates, UK, Wales, Yemen. Isn't it strange .................. So in addition to large number of applications they process, it is the diversified and much varying process for background checks for each country that may delay the process further.

GCMS notes shared by you people point that LVO hasn't yet started the security checks or any other evaluation .......... This shows that LVO (if not on strike) is still busy with clearing the backlog. But when I contacted two 2011 applicants from Pakistan (now in Canada), to my surprise both of them got their MR within 9 months of the initial application submission to CIO and got the visas in around 3-4 months of Medicals. This dilutes the thought LVO being busy with backlogs.

I second that we all must write to minister and the LVO itself for the delay in processing, with regular but polite follow-up as well. It will be good if we also request the mistier for introducing 2-3 VOs on urgent basis to handle the cases from the above countries which will eventually speed up the progress.
Does VO updates GCMS system instantly when they start background check? I don't think so, I am not expert though
Our background check maybe is running now (or maybe not) and my GCMS which is the latest one has no reference to activity.
What I want to say that GCMS notes - maybe - does not confirm that background check is not running
 

AK2147

Hero Member
Jun 25, 2013
407
12
Category........
Visa Office......
LVO
NOC Code......
2147
Job Offer........
Pre-Assessed..
App. Filed.......
21-05-2013
AOR Received.
PER: 01-08-2013
File Transfer...
Start processing on 18th June
Med's Request
02-July-2014
Med's Done....
21-July-2014 ....28- July-2014 "Medical received"
Interview........
No
Passport Req..
24-09-2014 and submitted on 10-10-2014
VISA ISSUED...
waiting
LANDED..........
waiting
Maria_Sal said:
even my gcms notes was not having any due date of december/jan ..

i will be receiving next gcms next month so maybe the new one has got some additional due dates as I sent PCCs in end of October..

Some few thoughts to share with you all which were passed by my borther...

LVO issuing PPR these days to end of 2011 and beginning of 2012 applicants.

As you also know, very few applications got transferred to London in the first 6 months of 2012 since on 28th June 2012, FSW program completely closed down for 11 months till it restarted again this year when u guyz applied. Also, all applications prior to 2008 were cancelled and almost all 2008-2011 applicants have now been issued PR visas (at least most of them).

CIC is aiming to finish all backlog by end of 2014 so that in 2015 when they start new EOI program, they don't have too many old fsw applications to process - that's why they introduced occupational restrictions and quotas of 20,000 in 2010 (MI-1), reduced it to 10,000 in 2011 (MI-2) and further reduced it to 5,000 in 2013 (MI-8)


just like NDVO and other visa offices, London visa office will also process old and new applications concurrently, otherwise that 7th Aug. 2014 date will not have been present in ur GCMS notes, its just that they are slower than NDVO, maybe coz of less staff and extended background/security checks for screening Muslim world applicants.


so, as per GCMS notes, definitely PPR with visa has to be come before August, but how long MR will take from now, thats just going to be a wild guess, I think late Feb to early March most likely.


some ppl are also saying London visa office has almost finished its allotted quota of MR for this year, that's why they plan to issue MR to 2013 applicants next year.......you have to remember all this wait time is coz of monthly quota, background check is just an excuse trust me.

they have pre-determined monthly quotas for CIC visa offices all around the world - even for NDVO they definitely have monthyl quota, which they are exhausting these days, they have certain fixed quota to issue PPR to 2013 applicants and certain fixed quota to issue PPR to pre-2012 applicants.
Good one....
 

tashford

Hero Member
May 20, 2013
329
8
Job Offer........
Pre-Assessed..
irfanyusuf said:
Good analysis Maria. In addition to the reasons you wrote about slowness of LVO, I would say that LVO is probably the biggest VO handling applications from over 15 countries i-e Bahrain, Channel Islands, Denmark, England, Falkland Islands, Faroe Islands, Finland, Gibraltar, Greenland, Iceland, Ireland, Kuwait, Northern Ireland, Norway, Oman, Pakistan, Qatar, Saudi Arabia, Scotland, Svalbard, Sweden, United Arab Emirates, UK, Wales, Yemen. Isn't it strange .................. So in addition to large number of applications they process, it is the diversified and much varying process for background checks for each country that may delay the process further.

GCMS notes shared by you people point that LVO hasn't yet started the security checks or any other evaluation .......... This shows that LVO (if not on strike) is still busy with clearing the backlog. But when I contacted two 2011 applicants from Pakistan (now in Canada), to my surprise both of them got their MR within 9 months of the initial application submission to CIO and got the visas in around 3-4 months of Medicals. This dilutes the thought LVO being busy with backlogs.

I second that we all must write to minister and the LVO itself for the delay in processing, with regular but polite follow-up as well. It will be good if we also request the mistier for introducing 2-3 VOs on urgent basis to handle the cases from the above countries which will eventually speed up the progress.

I obviously really agree with this statement, we really need to contact the minster and urge him todo what irfanyusuf has suggested.