+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
LLCOOLPaki said:
Hi all,

Today, my wife gor PPR via email. Here is the timeline:

Application (nikah case at that time) sent to Mississauga for step 1 on Feb 28, 2012
Step 1 completed and sent to ISB on May 28, 2012
Rukhsati done in December 2012
Additional doc request with re Police certificate and Rukhsati pic July 2013
Second medical request October 4th, 2013
Passport request November 4th, 2013

Wonder how long it takes to get visa stamped?

Mubarak ho bhot bhot... good luck in coming future life In Sha Allah hope you will get visa within one month
time or 3 weeks.
 
so finally they have started sending pprs... congrats to all those those who have received ppr or visa
 
Syassas said:
The future belongs to those who believe in the beauty of their dreams;
beauty of dreams gives hope n strength;
cos strength is born in the deep silence of long-suffering hearts; not amid joy.
1st Muharram ul haraam,
Wish u all gud luck
n joys.

Congratulations to everyone who have recieved ppr or visa issued. May Allah Almighty keep all of you happy, Ameen. Once again Mubarak bohat bohat. Remember us in your prayers.
 
Hi, yesterday my husband got a call from TCS office that he have a mail. So he went to pick it up. But on the mail they put my hubby wrong name, and they sent it to wrong address. Where he use to stay not on his current address.
I was so happy that my hubby might have got a remedial or something. But they sent him his larkana PCC back cuz my hubby studied there. Is that a gud sign that he might be getting remedial soon.
 
Congrates alot to.everyone with ppr
finally we are contacted by them
shukr hai allah ka
 
I think they want to achieve 2013 family quota or something before end of this year Christmas holidays.

Probably that's why we are seeing sudden PPR requests.
 
Hi all. My husband got the remedicalmrequest imm1071 ede today after 2 month of submitting the additional docs requested n police certificate. Can any one tell me how long more to get prassport request.
 
It used be come together. But now I dont think anyone can tell for sure. My wife did her re-med in early July and no PPR yet. Some got it within 6 to 8 weeks and some a week after re-med request.

smzaidi22 said:
Hi all. My husband got the remedicalmrequest imm1071 ede today after 2 month of submitting the additional docs requested n police certificate. Can any one tell me how long more to get prassport request.
 
They want to meet their own target for 2013, they had a change of heart or they have a policy change. If they are processing faster, I will take it. No questions asked. I promise :)

LLCOOLPaki said:
I think they want to achieve 2013 family quota or something before end of this year Christmas holidays.

Probably that's why we are seeing sudden PPR requests.
 
New timeline for Pakistan is 32 months now:(:(
 
Less than i anticipated. I remember Kenya (Nairobi) visa office was two months ahead of us in processing time. (About a year back). I was saying to myself atleast there is a slower CHC in the world. Now Im shocked to see Kenya siting at 22 months and us (being the slowest now and still going) are at 32. Unreal....
Shonagill said:
New timeline for Pakistan is 32 months now:(:(
 
I am sure soon it will reduce. Because they only looked at 80% of processed cases between Oct-2012 and Sep-2013. Dont forget the strike slowed down a process which was already slow. By the end of the year 2013 it should be reduced as we are seeing large dispatches of re-meds, PPRs, missing document requests and updated forms requests. All these are indication of work in progress instead of work stalled.

hubby chubby said:
Less than i anticipated. I remember Kenya (Nairobi) visa office was two months ahead of us in processing time. (About a year back). I was saying to myself atleast there is a slower CHC in the world. Now Im shocked to see Kenya siting at 22 months and us (being the slowest now and still going) are at 32. Unreal....
 
Shonagill said:
New timeline for Pakistan is 32 months now:(:(

What we have done wrong to make us wait 32 months??????????????????
 
Yes, but do remember When i applied initially at the end of the year I would see the same procedure. Quick remeds, ppr, add docs and stuff. At that time mind you the time was sitting around 23 months. I have been in the waiting game for 22 months now, that means they increased it 9 months and I don't see a significant slow down from the past year. They always bunch quick remeds/ppr and stuff they have to meet a yearly quota before the start of the new year.

mrTwoCents said:
I am sure soon it will reduce. Because they only looked at 80% of processed cases between Oct-2012 and Sep-2013. Dont forget the strike slowed down a process which was already slow. By the end of the year 2013 it should be reduced as we are seeing large dispatches of re-meds, PPRs, missing document requests and updated forms requests. All these are indication of work in progress instead of work stalled.