+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

CHC, Islamabad Spouse Sponsorship Timeline 2011 -2012

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
RED= Completed or Soon------ GREEN= Near completion-----BLUE=Started------ BLACK= Waiting

Fj423---------------------- January 2011 [H] Re-Medical request
R.Mugjani-----------------January [H] imm forms and repcc + same letter again june 8 Due Date July 31
Usrain -------------------- January 2011 (H) Re-pcc + supp forms+ remedical
CHUMCHUM----------- January 2011 [W]
Anso ----------------------January 2011 [H]
Liakram ----------------- January 2011 (H) Re.PCC request + IMM forms request +more prove of contact + re-medical May 14
Danny4450--------------January 2011 [W] Ecas in-process – Remed + PPR april 27 passport return june 2 completed in 17 months
Warda--------------------January 2011 ppr july 6
HASHOO---------------- January 2011 [W]
Hacib23------------------January 2011 Re-medical (feb 28)/ Re-pcc & supp forms(feb16)
Raaye---------------------January 2011
Ummihani--------------- January 2011 [W] repecc+ imm forms +proof feb 18
K.A-------------------------January 2011[H] re forms + repcc + remedical
Shifa-----------------------January 2011 [H] imm forums + repcc
Jay024--------------------- January 2011 (W) Re-med + PPR received visa MAY 2
Happyface----------------Januaray 2011 [H] remed +PPR
Kashsid--------------------- January imm+repcc + remed march 15+ ppr May 23+ visa issued june11 17 months
Omaira-------------------- January 2011 [H] imm+ repcc + remed In process may 15 PPR may 23visa issued 16.5 months
Misrable---------------- January 2011 remed feb + ppr july 9
Bus krdo--------------------January 2011 remed + ppr March 2012
sehrish--------------------- January 2011 [H] remed june 6+ ppr july 9 2012 visa issued july 20 2012
K1ing----------------------january 2011[W]imm forms+repcc feb 2012+remed april+ repcc june 7
_____________________________________________________________________________________
Intellix--------------------- February 2011
Gola_jee------------------- February 2011 (completed in 9 months)
Became –a-loner--------February 2011 [W]
truefriend-----------------February 2011 [W]
Anzee-----------------------February 2011 (W) Re-pcc + Forms march 13 + re-med may 14[/green]
Merrakhawaab----------February 2011 [H] supplementary form + documents request
Raptorsfan----------------February 2011 [W] Ecas status changed to in process remed + ppr to canada
SPU------------------------- February 2011 Re-pcc + imm form+med march 2012+ppr June 6,2012 completed in 16 months
C_sahar-------------------- February 2011 [H]remed+ppr march 15 completed in16 months
Abay yar-------------------Feburary 2011[W] re-medical + PPR visa return may 5
Lastsource4ever--------- Feburary 2011[W]
Liquid----------------------- Feburary 2011 [W]
Saakhi------------------------- Feburary 2011 recieved imm forms+repcc march 15+ re med in march
Shanay-------------------------feburary 2011ppr june 5 visa june 22 completed in 16 months[color] _____________________________________________________________________________________
Samno----------------------March 2011
Drwaqas--------------------March 2011[W]
Mahamq245--------------- March 2011 [W] initial medical +PPR recievd visa May 2
Blue_angel------------------ March 2011[H] Re-PCC + Supp forms feb 2012,remed may 2012[/green]
Simba----------------------- March 2011
Sher786---------------------March 2011 [W] remed + ppr case complete in 13 months stamped visa
tabasumali------------------March 2011 [W] re-pcc, imm forms, nikah nama, more proofs
Ahmad M------------------- March 2011[H]
Phantom------------------- March 2011[W]re-med + ppr June 12
Arkansas2045-------------- March 2011 [W] In process May 18
Almost There------------- March 2011 [H] received imm forms + repcc april 05 received remed+ppr june 6[color]
Badman---------------------March 2011[W] IMM forms + more proof april 2012
Alishab----------------- March 2011 imm forms + repcc march 2012+ remedical + ppr June 26
Raz.hz----------------------March 2011[W] imm forms +repcc May 24
Understanding--------------------------- Mach 2011
Pakihero----------------------------------march 2011 forms on march 27, remed may 18{/color]
_____________________________________________________________________________________

Insaan2011----------------- --------April 2011 [W] Ecas status changed to In process e-mail said remed and ppr on the way
Mah1906-----------------------------April 2011 (H) imm forms +repcc +RPRF+remed june 6
Shaby------------------------- --------April 2011[H]
Masoom_2012 –------------------ --April 2011 (W) remed++repcc march 28 ppr letter sentout june 1
Visionquest ---------------- ---------April 2011 [W] remed+++ppr visa issued may 16 13 months
Emanzaib -----------------------------April 2011 (W) Re- pcc + Add forms + remed letter may 16 and PPR will be sent when med clears
ShaukatWaqar -----------------------April 2011(H) Ecas in process (01/Mar/2012)
Blueye ---------------------------------April 2011 [H] Supplementary form request + re med mar 23 + ppr may 3 visa issued may 18 13 months
Yago -----------------------------------April 2011 [W] RE-PCC + nikah namah+med request june 6 + ppr june 19
Canadian555--------------------------April 2011[W] In process May 14 pay RPRF MAY 24+ remed +ppr june 8
Waljo88-------------------------------- April 2011 In[W] In process Mar 01 & Remed+ppr May 04
Missingmyjaan------------------------April 2011 [H] PCC + Forms + remed may 24 + ppr june 20
QD--------------------------------------- April 2011[W]
Sweet_ muskan---------------------- April 2011[W]
YasminA--------------------------------- April 2011 [W] In process early march remed+ppr april 21issued june 2012 completed 14 months
Ek_larki-----------------------------------April 2011[W] In process Feb 24 remed +ppr june 22
Monstermagnet-----------------------April 2011[W]imm forms+repcc march 15+remed june 14
Klahkany------------------------------- April 2011[W] imm+repcc+proof april 26
Disaster------------------------------------April 2011in process January 2012remed+ppr june 6 2012 completed in 15 months
adnan058---------------------------------April 2011[H]Remed june 6+ ppr july 10 completed in 15months

_____________________________________________________________________________________

RedJeans-----------------------------May 2011 [W] Imm forms + repcc + additional proof +remed +ppr june 11[/blue]
M_ali hussain -----------------------May 2011 (W) in process april 13th remed + ppr june 7
Adeelad ------------------------------May 2011 (W) in process re-med + ppr June 14
Adnanham------------------ -------May 2011 (W) --in process march 5
People_champ---------------------May 2011 (W) --in-process march 7 Re-med +PPR March 20 visa may 16 13 months
Tuco---------------------------------- May 2011[H]In process april 16 remed+ ppr April 26 visa june 7 completed in 12 months
Hinajameel-------------------------May 2011[W]
Khiladi65---------------------------- May 2011[W]
SRIZ-----------------------------------May 2011 [H] in process march 16 imm forms+ repcss may 6th
Humy------------------------------- -May 2011[W]
Rackeya----------------------------- May 2011 [H] in process March 28 re-med+ppr June 4
Mansor------------------------------May 2011[H]re-medical + repcc june 11
R.hadii-------------------------------- May 2011 [H] in process april 1st, imm forms + repcc april 17[color]
Ash14u------------------------------- May 2011 imm forms + repcc april 20 re-med june 6[blue]
13mera1------------------------May 2011 imm forms+repcc+ proof march 2012
_____________________________________________________________________________________

Philantropist-----------------June 2011[W] remed june 5 2012
Princesss ------------------- June 2011
Maryamfarhan---------------June 2011
Irsum------------------------June 2011[W] IMM forms + repcc may 24th
Fm_jun---------------------- June 2011sup form+repcc+ more proof+RFPF june 7+remed june 26
AFREEN----------------------June 2011[H]
Depression------------------ June 2011[W]
Sur1--------------------------June 2011[W] In process April 19 re-med+ppr delay due to COA june 1
SofiaM----------------------- June2011 In process may 7
Mrmohi----------------------June 2011[H]
Hasaang---------------------- June 2011[W]

DSF---------------------------- June 2011 [W] repcc+imm forms march 13+ remed may 10+ PPR july 3
Zion----------------------------June 2011 [W]
Humsafaar-------------------- June 2011 [W] received perform rukasti,imm forms+reppc May 22
Chsohail1988---------------------------June 2011 [W]
abdulgm----------------------------------June 2011[W] inprocess June 21 + remed+ppr july 20[color]
_____________________________________________________________________________________

Mississiauaga--------------------- July 2011[W] remed+ppr july 13 2012
Nofal8------------------------------Juy 2011[W]
Ramysehar------------------------July2011[W]
Allah madat----------------------- July 2011[W] received immforms +contact proof june 4+remed june 12
Suppy-------------------------------- July 2011
Khanintransit----------------------- July 2011[W] received reimm forms + repcc april 23
Toronto12-------------------------- July 2011 [W] remed +ppr april 16th + visa issued june 19 done in 11 months
FH999--------------------------------July 2011 remed+ppr May 25
Nimba-------------------------------July 2011 recieved job info, RFPF and repcc june 14
Sarah82-------------------------------------------July 2011 recieved remed+ppr july 15 2012
_____________________________________________________________________________________

Hot-lier----------------------------August 2011 [W] received letter more proof, imm forms, repcc April 17+ medical june 7
Sahibzada_2010---------------- August 2011 [W]in process May 10 remed + ppr june 12 NIKAH only PPR returned july 6,2012
Yasir2k6--------------------------- August 2011 [W] in process April 12 RE-Med + PPR May2 completed 10 months
ZZAADD---------------------- August 2011 [H]received imm forms+ repcc and contact of recent communications April 20+remedical request june 6
Redbull------------------------August 2011[W]
Isolo----------------------------August 2011[W] supplementary form + repcc may 23
Yasirman---------------------- August 2011[H] received imm forms+repcc+ more proof + pics april 5+ remed july 15
Khani6------------------------- August 2011[W]
Fayzaan------------------------ August 2011[W]forms + repcc june 24 + remed july 15
Tofan-ram----------------------Augusts 2011[W]
narb---------------------------- August 2011
zuh-----------------------------August 2011[W] imm forms +repcc+ proof may 23
______________________________________________________________________________

Sabii-------------------------September 2011 [H]supplementary forms June 8+remed june 18
Lonelyinca-----------------September 2011 [W] imm forms + moreproof and rukasti june 7
Quiet Storm---------------September 2011 [W] more proof+supplementary form june 6
Fathoom123--------------September 2011 [H]
Aqeelc----------------------September 2011[W]
Zabi-------------------------September 2011 [W]
Khan10---------------------September 2011 [H]
Timi------------------------- September 2011[H

CHAND394------------------- September 2011 [H] repcc+forms+ pics june 19
Khilafah5 - ------------------September 2011 [W] in process April 12 remed June 8 + ppr july 16 2012
SI------------------------------ September 2011 [W]imm forms+more proof+RFPF june 4+ remed june 12 + PPR june 19 +visa july 18 took 10 months
Pointblank-------------------- September 2011 [W]
Bright_Day----------------------September 2011[H]
Cv4spo----------------------------september 2011[W]In process june 2012,remed+ppr july 14 2012
Ashley---------------------------- September 2011 recieved imm forms+ repcc+ proof + RFPR june 14
Canadian786----------------------- September 2011 [H] remed june 21,2012
H_KJ-------------------------------- September 2011[W] received re med +ppr 19th May visa issued July 14 in 10 months
farhad08----------------------------September2011 in process june 7
___________________________________________________________________________

Adilmk123------------------ October 2011[H] in process June 11 remd july 16
Misshubby------------------October 2011 [H]
Mahria11------------------- October 2011 [W] reppc+ imm forms + more proof april 12in process june 7
Niraash-------------------------October 2011 [H]received imm frorms + repcc+proof june 22
Zainabanwer---------------- October 2011 [W]received forms +repcc+proof june 22
Fozi786----------------------- October 2011 remed+pp rjuly 13
Fozia987---------------------------October 2011[H] In process june 11
_____________________________________________________________________________________

Ezee----------------------------- November 2011[W]imm forms, repcc june 21
Caninfoseeker---------------- November 2011
Omar mirza------------------- November 2011[W] repcc+forms+ proof june 22+ remed july 13
Nor.30.09 --------------------- November 2011
Martin2012------------------- November 2011
Angelheart---------------------- November 2011[W]
rockinAdy------------------------November 201
Afgan0123----------------------- November 2011 [H]
Ma35------------------------------ November 2011
abdul nasir------------------------ November 2011 In process june 7
mianz----------------------------November 2011
umaimalik----------------------November 2011 [W] more proof july 18 + remed juy 22
_____________________________________________________________________________________

Noms-----------------------------December 2011[W]
Syedgj----------------------------December 2011 [H]
Naheeba-------------------------December 2011in process july 11, 2012
rkinvest----------------------------December 2011forms+ proof+ ruksati
Canadian immigrant------------- December 2011 forms+repcc

RED= Completed or Soon------ GREEN= Near completion-----BLUE=Started------ BLACK= Waiting
 

sabii

Champion Member
Aug 4, 2010
2,700
116
Visa Office......
Islamabad (Husband Case)
Job Offer........
Pre-Assessed..
App. Filed.......
July 2011
Doc's Request.
June 2012 -IMM & Supp Forms
File Transfer...
Sept 2011
Med's Request
June 2012
Med's Done....
June 2012
Interview........
Waived
Passport Req..
Feb 2013 along with RePCC
VISA ISSUED...
March 2013
LANDED..........
May 2013
farhadf80 said:
good . thanks but for me its going over months . Allah helpe me
Dont worry u will et remedical and ppr together soon inshaAllah
 

farhadf80

Hero Member
Jul 13, 2012
441
2
Job Offer........
Pre-Assessed..
App. Filed.......
agust 2011
Doc's Request.
IN PROCESS
File Transfer...
sep 2011
sabii said:
My case is application received since begining... Never changed to in process but a lime added medical results received so i dont know when my hubby should expect pppppr :(
INSHALLAH sonnnnnnnnnnnn
 

lonelyinca

Hero Member
Mar 21, 2011
426
7
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
+July 2011
Doc's Request.
+++June 2012
File Transfer...
++Sept 2011
Med's Request
+++June 2012
Med's Done....
++++July 2012
Passport Req..
+++++Dec 2012
VISA ISSUED...
++++++Dec 2012
sabii said:
My case is application received since begining... Never changed to in process but a lime added medical results received so i dont know when my hubby should expect pppppr :(
Hey in how many days did they receive medical?
 

fayzaan

Hero Member
Apr 30, 2011
514
11
Calgary, Alberta Canada
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
09-08-2011
Doc's Request.
08-06-2012
AOR Received.
08-06-2012
File Transfer...
25-10-2011
Med's Request
14-07-2012
Med's Done....
19-07-2012
Passport Req..
22-02-2013
sabii said:
Uffff u guys r still arguing c'mon guys just pay to Allah that HE helps us in reuniting with our spouses sooooon Aaaameeeenn ! Allah ji my hubby get ppr sooon plzzzzzz... This is month of blessings and month of fulfiling our duaaas... Stay blessed everyone
InshAllah Allah will help us all, I never got return email for approving extension and I am still waiting for Quetta PCC for the wife so we can send the rest of the docs to them. I hope they don't just reject/delay my case :/.
 

farhadf80

Hero Member
Jul 13, 2012
441
2
Job Offer........
Pre-Assessed..
App. Filed.......
agust 2011
Doc's Request.
IN PROCESS
File Transfer...
sep 2011
Khilafah5 said:
RED= Completed or Soon------ GREEN= Near completion-----BLUE=Started------ BLACK= Waiting

Fj423---------------------- January 2011 [H] Re-Medical request
R.Mugjani-----------------January [H] imm forms and repcc + same letter again june 8 Due Date July 31
Usrain -------------------- January 2011 (H) Re-pcc + supp forms+ remedical
CHUMCHUM----------- January 2011 [W]
Anso ----------------------January 2011 [H]
Liakram ----------------- January 2011 (H) Re.PCC request + IMM forms request +more prove of contact + re-medical May 14
Danny4450--------------January 2011 [W] Ecas in-process – Remed + PPR april 27 passport return june 2 completed in 17 months
Warda--------------------January 2011 ppr july 6
HASHOO---------------- January 2011 [W]
Hacib23------------------January 2011 Re-medical (feb 28)/ Re-pcc & supp forms(feb16)
Raaye---------------------January 2011
Ummihani--------------- January 2011 [W] repecc+ imm forms +proof feb 18
K.A-------------------------January 2011[H] re forms + repcc + remedical
Shifa-----------------------January 2011 [H] imm forums + repcc
Jay024--------------------- January 2011 (W) Re-med + PPR received visa MAY 2
Happyface----------------Januaray 2011 [H] remed +PPR
Kashsid--------------------- January imm+repcc + remed march 15+ ppr May 23+ visa issued june11 17 months
Omaira-------------------- January 2011 [H] imm+ repcc + remed In process may 15 PPR may 23visa issued 16.5 months
Misrable---------------- January 2011 remed feb + ppr july 9
Bus krdo--------------------January 2011 remed + ppr March 2012
sehrish--------------------- January 2011 [H] remed june 6+ ppr july 9 2012 visa issued july 20 2012
K1ing----------------------january 2011[W]imm forms+repcc feb 2012+remed april+ repcc june 7
_____________________________________________________________________________________
Intellix--------------------- February 2011
Gola_jee------------------- February 2011 (completed in 9 months)
Became –a-loner--------February 2011 [W]
truefriend-----------------February 2011 [W]
Anzee-----------------------February 2011 (W) Re-pcc + Forms march 13 + re-med may 14[/green]
Merrakhawaab----------February 2011 [H] supplementary form + documents request
Raptorsfan----------------February 2011 [W] Ecas status changed to in process remed + ppr to canada
SPU------------------------- February 2011 Re-pcc + imm form+med march 2012+ppr June 6,2012 completed in 16 months
C_sahar-------------------- February 2011 [H]remed+ppr march 15 completed in16 months
Abay yar-------------------Feburary 2011[W] re-medical + PPR visa return may 5
Lastsource4ever--------- Feburary 2011[W]
Liquid----------------------- Feburary 2011 [W]
Saakhi------------------------- Feburary 2011 recieved imm forms+repcc march 15+ re med in march
Shanay-------------------------feburary 2011ppr june 5 visa june 22 completed in 16 months[color] _____________________________________________________________________________________
Samno----------------------March 2011
Drwaqas--------------------March 2011[W]
Mahamq245--------------- March 2011 [W] initial medical +PPR recievd visa May 2
Blue_angel------------------ March 2011[H] Re-PCC + Supp forms feb 2012,remed may 2012[/green]
Simba----------------------- March 2011
Sher786---------------------March 2011 [W] remed + ppr case complete in 13 months stamped visa
tabasumali------------------March 2011 [W] re-pcc, imm forms, nikah nama, more proofs
Ahmad M------------------- March 2011[H]
Phantom------------------- March 2011[W]re-med + ppr June 12
Arkansas2045-------------- March 2011 [W] In process May 18
Almost There------------- March 2011 [H] received imm forms + repcc april 05 received remed+ppr june 6[color]
Badman---------------------March 2011[W] IMM forms + more proof april 2012
Alishab----------------- March 2011 imm forms + repcc march 2012+ remedical + ppr June 26
Raz.hz----------------------March 2011[W] imm forms +repcc May 24
Understanding--------------------------- Mach 2011
Pakihero----------------------------------march 2011 forms on march 27, remed may 18{/color]
_____________________________________________________________________________________

Insaan2011----------------- --------April 2011 [W] Ecas status changed to In process e-mail said remed and ppr on the way
Mah1906-----------------------------April 2011 (H) imm forms +repcc +RPRF+remed june 6
Shaby------------------------- --------April 2011[H]
Masoom_2012 –------------------ --April 2011 (W) remed++repcc march 28 ppr letter sentout june 1
Visionquest ---------------- ---------April 2011 [W] remed+++ppr visa issued may 16 13 months
Emanzaib -----------------------------April 2011 (W) Re- pcc + Add forms + remed letter may 16 and PPR will be sent when med clears
ShaukatWaqar -----------------------April 2011(H) Ecas in process (01/Mar/2012)
Blueye ---------------------------------April 2011 [H] Supplementary form request + re med mar 23 + ppr may 3 visa issued may 18 13 months
Yago -----------------------------------April 2011 [W] RE-PCC + nikah namah+med request june 6 + ppr june 19
Canadian555--------------------------April 2011[W] In process May 14 pay RPRF MAY 24+ remed +ppr june 8
Waljo88-------------------------------- April 2011 In[W] In process Mar 01 & Remed+ppr May 04
Missingmyjaan------------------------April 2011 [H] PCC + Forms + remed may 24 + ppr june 20
QD--------------------------------------- April 2011[W]
Sweet_ muskan---------------------- April 2011[W]
YasminA--------------------------------- April 2011 [W] In process early march remed+ppr april 21issued june 2012 completed 14 months
Ek_larki-----------------------------------April 2011[W] In process Feb 24 remed +ppr june 22
Monstermagnet-----------------------April 2011[W]imm forms+repcc march 15+remed june 14
Klahkany------------------------------- April 2011[W] imm+repcc+proof april 26
Disaster------------------------------------April 2011in process January 2012remed+ppr june 6 2012 completed in 15 months
adnan058---------------------------------April 2011[H]Remed june 6+ ppr july 10 completed in 15months

_____________________________________________________________________________________

RedJeans-----------------------------May 2011 [W] Imm forms + repcc + additional proof +remed +ppr june 11[/blue]
M_ali hussain -----------------------May 2011 (W) in process april 13th remed + ppr june 7
Adeelad ------------------------------May 2011 (W) in process re-med + ppr June 14
Adnanham------------------ -------May 2011 (W) --in process march 5
People_champ---------------------May 2011 (W) --in-process march 7 Re-med +PPR March 20 visa may 16 13 months
Tuco---------------------------------- May 2011[H]In process april 16 remed+ ppr April 26 visa june 7 completed in 12 months
Hinajameel-------------------------May 2011[W]
Khiladi65---------------------------- May 2011[W]
SRIZ-----------------------------------May 2011 [H] in process march 16 imm forms+ repcss may 6th
Humy------------------------------- -May 2011[W]
Rackeya----------------------------- May 2011 [H] in process March 28 re-med+ppr June 4
Mansor------------------------------May 2011[H]re-medical + repcc june 11
R.hadii-------------------------------- May 2011 [H] in process april 1st, imm forms + repcc april 17[color]
Ash14u------------------------------- May 2011 imm forms + repcc april 20 re-med june 6[blue]
13mera1------------------------May 2011 imm forms+repcc+ proof march 2012
_____________________________________________________________________________________

Philantropist-----------------June 2011[W] remed june 5 2012
Princesss ------------------- June 2011
Maryamfarhan---------------June 2011
Irsum------------------------June 2011[W] IMM forms + repcc may 24th
Fm_jun---------------------- June 2011sup form+repcc+ more proof+RFPF june 7+remed june 26
AFREEN----------------------June 2011[H]
Depression------------------ June 2011[W]
Sur1--------------------------June 2011[W] In process April 19 re-med+ppr delay due to COA june 1
SofiaM----------------------- June2011 In process may 7
Mrmohi----------------------June 2011[H]
Hasaang---------------------- June 2011[W]

DSF---------------------------- June 2011 [W] repcc+imm forms march 13+ remed may 10+ PPR july 3
Zion----------------------------June 2011 [W]
Humsafaar-------------------- June 2011 [W] received perform rukasti,imm forms+reppc May 22
Chsohail1988---------------------------June 2011 [W]
abdulgm----------------------------------June 2011[W] inprocess June 21 + remed+ppr july 20[color]
_____________________________________________________________________________________

Mississiauaga--------------------- July 2011[W] remed+ppr july 13 2012
Nofal8------------------------------Juy 2011[W]
Ramysehar------------------------July2011[W]
Allah madat----------------------- July 2011[W] received immforms +contact proof june 4+remed june 12
Suppy-------------------------------- July 2011
Khanintransit----------------------- July 2011[W] received reimm forms + repcc april 23
Toronto12-------------------------- July 2011 [W] remed +ppr april 16th + visa issued june 19 done in 11 months
FH999--------------------------------July 2011 remed+ppr May 25
Nimba-------------------------------July 2011 recieved job info, RFPF and repcc june 14
Sarah82-------------------------------------------July 2011 recieved remed+ppr july 15 2012
_____________________________________________________________________________________

Hot-lier----------------------------August 2011 [W] received letter more proof, imm forms, repcc April 17+ medical june 7
Sahibzada_2010---------------- August 2011 [W]in process May 10 remed + ppr june 12 NIKAH only PPR returned july 6,2012
Yasir2k6--------------------------- August 2011 [W] in process April 12 RE-Med + PPR May2 completed 10 months
ZZAADD---------------------- August 2011 [H]received imm forms+ repcc and contact of recent communications April 20+remedical request june 6
Redbull------------------------August 2011[W]
Isolo----------------------------August 2011[W] supplementary form + repcc may 23
Yasirman---------------------- August 2011[H] received imm forms+repcc+ more proof + pics april 5+ remed july 15
Khani6------------------------- August 2011[W]
Fayzaan------------------------ August 2011[W]forms + repcc june 24 + remed july 15
Tofan-ram----------------------Augusts 2011[W]
narb---------------------------- August 2011
zuh-----------------------------August 2011[W] imm forms +repcc+ proof may 23
______________________________________________________________________________

Sabii-------------------------September 2011 [H]supplementary forms June 8+remed june 18
Lonelyinca-----------------September 2011 [W] imm forms + moreproof and rukasti june 7
Quiet Storm---------------September 2011 [W] more proof+supplementary form june 6
Fathoom123--------------September 2011 [H]
Aqeelc----------------------September 2011[W]
Zabi-------------------------September 2011 [W]
Khan10---------------------September 2011 [H]
Timi------------------------- September 2011[H

CHAND394------------------- September 2011 [H] repcc+forms+ pics june 19
Khilafah5 - ------------------September 2011 [W] in process April 12 remed June 8 + ppr july 16 2012
SI------------------------------ September 2011 [W]imm forms+more proof+RFPF june 4+ remed june 12 + PPR june 19 +visa july 18 took 10 months
Pointblank-------------------- September 2011 [W]
Bright_Day----------------------September 2011[H]
Cv4spo----------------------------september 2011[W]In process june 2012,remed+ppr july 14 2012
Ashley---------------------------- September 2011 recieved imm forms+ repcc+ proof + RFPR june 14
Canadian786----------------------- September 2011 [H] remed june 21,2012
H_KJ-------------------------------- September 2011[W] received re med +ppr 19th May visa issued July 14 in 10 months
farhad08----------------------------September2011 in process june 7
___________________________________________________________________________

Adilmk123------------------ October 2011[H] in process June 11 remd july 16
Misshubby------------------October 2011 [H]
Mahria11------------------- October 2011 [W] reppc+ imm forms + more proof april 12in process june 7
Niraash-------------------------October 2011 [H]received imm frorms + repcc+proof june 22
Zainabanwer---------------- October 2011 [W]received forms +repcc+proof june 22
Fozi786----------------------- October 2011 remed+pp rjuly 13
Fozia987---------------------------October 2011[H] In process june 11
_____________________________________________________________________________________

Ezee----------------------------- November 2011[W]imm forms, repcc june 21
Caninfoseeker---------------- November 2011
Omar mirza------------------- November 2011[W] repcc+forms+ proof june 22+ remed july 13
Nor.30.09 --------------------- November 2011
Martin2012------------------- November 2011
Angelheart---------------------- November 2011[W]
rockinAdy------------------------November 201
Afgan0123----------------------- November 2011 [H]
Ma35------------------------------ November 2011
abdul nasir------------------------ November 2011 In process june 7
mianz----------------------------November 2011
umaimalik----------------------November 2011 [W] more proof july 18 + remed juy 22
_____________________________________________________________________________________

Noms-----------------------------December 2011[W]
Syedgj----------------------------December 2011 [H]
Naheeba-------------------------December 2011in process july 11, 2012
rkinvest----------------------------December 2011forms+ proof+ ruksati
Canadian immigrant------------- December 2011 forms+repcc

RED= Completed or Soon------ GREEN= Near completion-----BLUE=Started------ BLACK= Waiting


[/quote


khalifa bro u are really good thankssssssssssssssssssssssssssss
 

farhadf80

Hero Member
Jul 13, 2012
441
2
Job Offer........
Pre-Assessed..
App. Filed.......
agust 2011
Doc's Request.
IN PROCESS
File Transfer...
sep 2011
sabii said:
Dont worry u will et remedical and ppr together soon inshaAllah

thankss Sabiiiiiiii
 

sabii

Champion Member
Aug 4, 2010
2,700
116
Visa Office......
Islamabad (Husband Case)
Job Offer........
Pre-Assessed..
App. Filed.......
July 2011
Doc's Request.
June 2012 -IMM & Supp Forms
File Transfer...
Sept 2011
Med's Request
June 2012
Med's Done....
June 2012
Interview........
Waived
Passport Req..
Feb 2013 along with RePCC
VISA ISSUED...
March 2013
LANDED..........
May 2013
lonelyinca said:
Hey in how many days did they receive medical?
Dmp told my hubby chc should receive med in 10 days n my status was updated after 20 days
 

sabii

Champion Member
Aug 4, 2010
2,700
116
Visa Office......
Islamabad (Husband Case)
Job Offer........
Pre-Assessed..
App. Filed.......
July 2011
Doc's Request.
June 2012 -IMM & Supp Forms
File Transfer...
Sept 2011
Med's Request
June 2012
Med's Done....
June 2012
Interview........
Waived
Passport Req..
Feb 2013 along with RePCC
VISA ISSUED...
March 2013
LANDED..........
May 2013
fayzaan said:
InshAllah Allah will help us all, I never got return email for approving extension and I am still waiting for Quetta PCC for the wife so we can send the rest of the docs to them. I hope they don't just reject/delay my case :/.
InshaAllah!
Dont worry if u have sent them email then thats mean its in their record... Did u fax them ur request?
 

farhadf80

Hero Member
Jul 13, 2012
441
2
Job Offer........
Pre-Assessed..
App. Filed.......
agust 2011
Doc's Request.
IN PROCESS
File Transfer...
sep 2011
thanks khalifa bro .
 

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
sabii said:
Dmp told my hubby chc should receive med in 10 days n my status was updated after 20 days
it depends how fast the DMP mails them out
 

sabii

Champion Member
Aug 4, 2010
2,700
116
Visa Office......
Islamabad (Husband Case)
Job Offer........
Pre-Assessed..
App. Filed.......
July 2011
Doc's Request.
June 2012 -IMM & Supp Forms
File Transfer...
Sept 2011
Med's Request
June 2012
Med's Done....
June 2012
Interview........
Waived
Passport Req..
Feb 2013 along with RePCC
VISA ISSUED...
March 2013
LANDED..........
May 2013
khanb5 said:
Sabii sis do you have number for rubina sattar???
Dr roohina pa # 03462571303 try to cal her between 5-6pm
 

sabii

Champion Member
Aug 4, 2010
2,700
116
Visa Office......
Islamabad (Husband Case)
Job Offer........
Pre-Assessed..
App. Filed.......
July 2011
Doc's Request.
June 2012 -IMM & Supp Forms
File Transfer...
Sept 2011
Med's Request
June 2012
Med's Done....
June 2012
Interview........
Waived
Passport Req..
Feb 2013 along with RePCC
VISA ISSUED...
March 2013
LANDED..........
May 2013
Khilafah5 said:
it depends how fast the DMP mails them out
Yea thats what i said.. Dmp told abt my hubby's medical (10 days)
 

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
sabii said:
Yea thats what i said.. Dmp told abt my hubby's medical (10 days)
must have been smoking something when the DMP said that