Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
FM_jun said:
i got a letter today from chc I .they request supplementery form,pcc,more proof,original marriage certificate & RPRF...they send me this letter on 22 may but i recieved today...i have 2 questions. from now how much time it will take? another i want to change my address .how much times it takes when u request for address change?
MASHAH ALLAH!! CONGRATS!!!!! Address change can take upto 2-3 months. but since u got supp forms n etc to send along with ur address change request letter it may take 45 days -2 months. Now it may take around 3-4 months or less depending on visa officer. INSHAH ALLAH. GUD LUCK
 

Imtihaan

Hero Member
Jan 20, 2011
745
19
Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
maknojia said:
By the grace of ALLAH SWT i recieved my remed+ ppr.im soooooooooooooooooooooooooooo happy. i would like to thank every single person on this forum who helped us through out the process specially wes bhai,danny bhai and khalifah. :D :D :D :D :D :D :D :D :D :D

inshallah u all will be soon with ur love ones tc.

CONGRATS!!!!!!!! MASHAH ALLAH!!!!!!!! well Birhday gift arrived juuust a lil late but thats ur birthday present. Very happy for u.
 

Imtihaan

Hero Member
Jan 20, 2011
745
19
Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
c_sahar said:
I JUST CHECKED MY ONLINE STATUS AND IT SEYS DECISION MADE BUT THE ADDRESS HASNT CHANGED TO MY CANADIAN ADDRESS.....THE STATUS CHANGED TODAY!!!


I hope it means good....

Have they asked u for ur passport? when did you send hem the passport?
 

Imtihaan

Hero Member
Jan 20, 2011
745
19
Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
lonelyinca said:
:)
Finally some news! Wife received mail, asking for updated forms and more proof including communication, email, chat, phone bills and rukhsati date.

They sent it out June5th, received June7! Nice eh? It was sent by post, not tcs.

Now I'm thinking sending reply by post as well, is that possible? Or is it a must by courrier service?

Also regarding rukhsati request, that is one absurd request they're demanding. I am not going to fulfill it, I will give them my reasons as to why I can't do it. My marriage is complete with nikah, no need to waste money. Inshallah everything will fall in place.

Btw, the address disappearing and appearing again had a meaning. The same day they sent out the letter, same day address showed up. Aligns with other members' experiences.

That's all for now. Just bummed that no Repcc med request @ . Happy still something showed up. We're in our 9th month. Alhamdulillah.

CONGRATS!!!!!

Well u can use eith service. post just takes longer than courier service. lucky u got the letter in 2 days by post. Thats ok..u cant fulfill all chc wishes (although it wud be nice) . just do ur best and good luck
 

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
afghan0123 said:
Danny Bhai,

I have sent an email to CHC ISB since 18 days asking for my case update, still i didn't received any response from their side.
I am confused............ pls help
they will reply after a month or so

they responded to me 6 weeks later
 

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
RED= Completed or Soon------ GREEN= Near completion[/green]-----BLUE=Started------ BLACK= Waiting

Fj423---------------------- January 2011 [H] Re-Medical request
R.Mugjani-----------------January [H] imm forms and repcc
Usrain -------------------- January 2011 (H) Re-pcc + supp forms+ remedical
CHUMCHUM----------- January 2011 [W]
Anso ----------------------January 2011 [H]
Liakram ----------------- January 2011 (H) Re.PCC request + IMM forms request +more prove of contact + re-medical May 14
Danny4450--------------January 2011 [W] Ecas in-process – Remed + PPR april 27 passport return june 2 completed in 17 months
Warda--------------------January 2011
HASHOO---------------- January 2011 [W]
Hacib23------------------January 2011 Re-medical (feb 28)/ Re-pcc & supp forms(feb16)
Raaye---------------------January 2011
Ummihani--------------- January 2011 [W] repecc+ imm forms +proof feb 18
K.A-------------------------January 2011[H] re forms + repcc + remedical
Shifa-----------------------January 2011 [H] imm forums + repcc
Jay024--------------------- January 2011 (W) Re-med + PPR received visa MAY 2
Happyface----------------Januaray 2011 [H] remed +PPR
Kashid--------------------- January imm+repcc + remed
Omaira-------------------- January 2011 [H] imm+ repcc + remed In process may 15 PPR may 23
Misrable---------------- January 2011 remed feb
Bus krdo--------------------January 2011 remed + ppr March 2012
Dsabri---------------------- January 2011 imm forms +repcc april re med april In process may 15 PPR may 24th
_____________________________________________________________________________________
Intellix--------------------- February 2011
Gola_jee------------------- February 2011 (completed in 9 months)
Became –a-loner--------February 2011 [W]
truefriend-----------------February 2011 [W]
Anzee-----------------------February 2011 (W) Re-pcc + Forms march 13 + re-med may 14[/green]
Merrakhawaab----------February 2011 [H] supplementary form + documents request
Raptorsfan----------------February 2011 [W] Ecas status changed to in process remed + ppr to canada
SPU------------------------- February 2011 Re-pcc + imm form+med march 2012+ppr June 6,2012 completed in 16 months
C_sahar-------------------- February 2011 [H]remed+ppr march 15 completed in16 months
Abay yar-------------------Feburary 2011[W] re-medical + PPR visa return may 5
Lastsource4ever--------- Feburary 2011[W]
Liquid----------------------- Feburary 2011 [W]
Saakhi------------------------- Feburary 2011 recieved imm forms+repcc march 15 _____________________________________________________________________________________
Samno----------------------March 2011
Drwaqas--------------------March 2011[W]
Mahamq245--------------- March 2011 [W] initial medical +PPR recievd visa May 2
Blue_angel------------------ March 2011[H] Re-PCC + Supp forms feb 2012,remed may 2012[/green]
Simba----------------------- March 2011
Sher786---------------------March 2011 [W] remed + ppr case complete in 13 months stamped visa
tabasumali------------------March 2011 [W] re-pcc, imm forms, nikah nama, more proofs
Ahmad M------------------- March 2011[H]
Phantom------------------- March 2011[W]
Arkansas2045-------------- March 2011 [W] In process May 18
Almost There------------- March 2011 [H] received imm forms + repcc april 05 received remed+ppr june 6[color]
Badman---------------------March 2011[W] IMM forms + more proof april 2012
Alishab----------------- March 2011 imm forms + repcc march 2012
Raz.hz----------------------March 2011[W] imm forms +repcc May 24
Understanding--------------------------- Mach 2011
_____________________________________________________________________________________

Insaan2011----------------- --------April 2011 [W] Ecas status changed to In process e-mail said remed and ppr on the way
Mah1906-----------------------------April 2011 (H) imm forms +repcc +RPRF+remed june 6
Shaby------------------------- --------April 2011[H]
Masoom_2012 –------------------ --April 2011 (W) remed++repcc march 28 ppr letter sentout june 1
Visionquest ---------------- ---------April 2011 [W] remed+++ppr visa issued may 16 13 months
Emanzaib -----------------------------April 2011 (W) Re- pcc + Add forms + remed letter may 16 and PPR will be sent when med clears
ShaukatWaqar -----------------------April 2011(H) Ecas in process (01/Mar/2012)
Blueye ---------------------------------April 2011 [H] Supplementary form request + re med mar 23 + ppr may 3 visa issued may 18 13 months
Yago -----------------------------------April 2011 [W] RE-PCC + nikah namah+med request june 6
Canadian555--------------------------April 2011[W] In process May 14 pay RPRF MAY 24
Waljo88-------------------------------- April 2011 In[W] In process Mar 01 & Remed+ppr May 04
Missingmyjaan------------------------April 2011 [H] PCC + Forms + remed may 24
QD--------------------------------------- April 2011[W]
Sweet_ muskan---------------------- April 2011[W]
YasminA--------------------------------- April 2011 [W] In process early march remed+ppr april 21
Ek_larki-----------------------------------April 2011[W] In process Feb 24 e-mail reply remed+ppr
Adnan_058----------------------------- April 2011 [H]re-medical june 6
Monstermagnet-----------------------April 2011[W]imm forms+repcc march 15
Klahkany------------------------------- April 2011[W] imm+repcc+proof april 26
_____________________________________________________________________________________

RedJeans-----------------------------May 2011 [W] Imm forms + repcc + additional proof[/blue]
M_ali hussain -----------------------May 2011 (W) in process april 13th remed + ppr june 7
Adeelad ------------------------------May 2011 (W) in process
Adnanham------------------ -------May 2011 (W) --in process march 5
People_champ---------------------May 2011 (W) --in-process march 7 Re-med +PPR March 20 visa may 16 13 months
Tuco---------------------------------- May 2011[H]In process april 16 remed+ ppr April 26
Hinajameel-------------------------May 2011[W]
Khiladi65---------------------------- May 2011[W]
SRIZ-----------------------------------May 2011 [H] in process march 16 imm forms+ repcss may 6th
Humy------------------------------- -May 2011[W]
Rackeya----------------------------- May 2011 [H] in process March 28 re-med+ppr June 4
Mansor------------------------------May 2011[H]
R.hadii-------------------------------- May 2011 [H] in process april 1st, imm forms + repcc april 17[color]
Ash14u------------------------------- May 2011 imm forms + repcc april 20 re-med june 6[blue]
13mera1------------------------May 2011 imm forms+repcc+ proof march 2012
_____________________________________________________________________________________

Philantropist-----------------June 2011
Princesss ------------------- June 2011
Maryamfarhan---------------June 2011
Irsum------------------------June 2011[W] IMM forms + repcc may 24th
Fm_jun---------------------- June 2011sup form+repcc+ more proof+RFPF june 7
AFREEN----------------------June 2011[H]
Depression------------------ June 2011[W]
Sur1--------------------------June 2011[W] In process April 19 re-med+ppr delay due to COA june 1
SofiaM----------------------- June2011 In process may 7
Mrmohi----------------------June 2011[H]
Hasaang---------------------- June 2011[W]
DSF---------------------------- June 2011 [W] repcc+imm forms march 13+ remed may 10
Zion----------------------------June 2011 [W]
Humsafaar-------------------- June 2011 [W] received perform rukasti,imm forms+reppc May 22
_____________________________________________________________________________________

Mississiauaga--------------------- July 2011[W]
Nofal8------------------------------Juy 2011[W]
Ramysehar------------------------July2011[W]
Fozia987---------------------------July 2011[H]
Allah madat----------------------- July 2011[W] received immforms +contact proof june 4
Suppy-------------------------------- July 2011
Khanintransit----------------------- July 2011[W] received reimm forms + repcc april 23
Canadian786----------------------- July 2011 [H]
Toronto12-------------------------- July 2011 [W] remed +ppr april 16th
FH999--------------------------------July 2011 remed+ppr May 25
_____________________________________________________________________________________

Hot-lier----------------------------August 2011 [W] received letter more proof, imm forms, repcc April 17
Sahibzada_2010---------------- August 2011 [W]in process May 10
Yasir2k6--------------------------- August 2011 [W] in process April 12 RE-Med + PPR May2 completed 10 months
ZZAADD---------------------- August 2011 [H]received imm forms+ repcc and contact of recent communications April 20+remedical request june 6
Redbull------------------------August 2011[W]
Isolo----------------------------August 2011[W] supplementary form + repcc may 23
Yasirman---------------------- August 2011[H] received imm forms+repcc+ more proof + pics april 5
Khani6------------------------- August 2011[W]
Fayzaan------------------------ August 2011[W]
_____________________________________________________________________________________

Sabii-------------------------September 2011 [H]
Lonelyinca-----------------September 2011 [W] imm forms + moreproof and rukasti june 7
Quiet Storm---------------September 2011 [W] more proof+supplementary form june 6
Fathoom123--------------September 2011 [H]
Khanb5---------------------- August 2011[W] received more proof+ imm forms+ repcc may 25
Aqeelc----------------------September 2011[W]
Zabi-------------------------September 2011 [W]
Khan10---------------------September 2011 [H]
Timi------------------------- September 2011[H

CHAND394------------------- September 2011 [H]
Khilafah5 - ------------------September 2011 [W] in process April 12 remed may 28 + ppr will sent out when meds clear
SI------------------------------ September 2011 [W]imm forms+more proof+RFPF june 4
Pointblank-------------------- September 2011 [W]
Bright_Day----------------------September 2011[H]
_____________________________________________________________________________________

Adilmk123------------------ October 2011[H]
Misshubby------------------October 2011 (H)
Mahria11------------------- October 2011 [W] reppc+ imm forms + more proof april 12
Niraash-------------------------October 2011 [H]received callfrom CHC asking questions june6
Zainabanwer---------------- October 2011 [W]
Fozi786----------------------- October 2011
_____________________________________________________________________________________

Ezee----------------------------- November 2011[W]
Caninfoseeker---------------- November 2011
Omar mirza------------------- November 2011[W]
Nor.30.09 --------------------- November 2011
Martin2012------------------- November 2011

Angelheart---------------------- November 2011[W]
rockinAdy------------------------November 201
Afgan0123----------------------- November 2011 [H]
_____________________________________________________________________________________

Noms-----------------------------December 2011[W]
Syedgj----------------------------December 2011 [H]
Naheeba-------------------------December 2011

RED= Completed or Soon------ GREEN= Near completion[/green]-----BLUE=Started------ BLACK= Waiting
 

Danny4450

Champion Member
Mar 23, 2011
2,625
148
Category........
Visa Office......
ISLAMABAD - Wife case
Job Offer........
Pre-Assessed..
App. Filed.......
22 Dec 2010
File Transfer...
27 Jan 2011
Med's Request
Re-medical April 23rd, 2012
Med's Done....
April 24th, 2012
Interview........
Exempt
Passport Req..
April 23rd, 2012 - PP sent on May 1st, 2012
VISA ISSUED...
June 1st, 2012 .. Alhumdulillah .. Total time = 17 months and 8 days
LANDED..........
Jun 17th, 2012 .. Alhumdulillah :)
lonelyinca said:
:)
Finally some news! Wife received mail, asking for updated forms and more proof including communication, email, chat, phone bills and rukhsati date.

They sent it out June5th, received June7! Nice eh? It was sent by post, not tcs.

Now I'm thinking sending reply by post as well, is that possible? Or is it a must by courrier service?

Also regarding rukhsati request, that is one absurd request they're demanding. I am not going to fulfill it, I will give them my reasons as to why I can't do it. My marriage is complete with nikah, no need to waste money. Inshallah everything will fall in place.

Btw, the address disappearing and appearing again had a meaning. The same day they sent out the letter, same day address showed up. Aligns with other members' experiences.

That's all for now. Just bummed that no Repcc med request @ . Happy still something showed up. We're in our 9th month. Alhamdulillah.
Nice.. thats a great news, first request in 9 months MashaAllah.. Hopefully you guys would be done in the next 4 months or so InshaAllah :)
 

Danny4450

Champion Member
Mar 23, 2011
2,625
148
Category........
Visa Office......
ISLAMABAD - Wife case
Job Offer........
Pre-Assessed..
App. Filed.......
22 Dec 2010
File Transfer...
27 Jan 2011
Med's Request
Re-medical April 23rd, 2012
Med's Done....
April 24th, 2012
Interview........
Exempt
Passport Req..
April 23rd, 2012 - PP sent on May 1st, 2012
VISA ISSUED...
June 1st, 2012 .. Alhumdulillah .. Total time = 17 months and 8 days
LANDED..........
Jun 17th, 2012 .. Alhumdulillah :)
afghan0123 said:
Danny Bhai,

I have sent an email to CHC ISB since 18 days asking for my case update, still i didn't received any response from their side.
I am confused............ pls help
You have to write your file number, name, date of birth in the email for them to believe its really you who's asking. Also, they are replying to emails at a very slow pace. How many months since you applied ?
 

Danny4450

Champion Member
Mar 23, 2011
2,625
148
Category........
Visa Office......
ISLAMABAD - Wife case
Job Offer........
Pre-Assessed..
App. Filed.......
22 Dec 2010
File Transfer...
27 Jan 2011
Med's Request
Re-medical April 23rd, 2012
Med's Done....
April 24th, 2012
Interview........
Exempt
Passport Req..
April 23rd, 2012 - PP sent on May 1st, 2012
VISA ISSUED...
June 1st, 2012 .. Alhumdulillah .. Total time = 17 months and 8 days
LANDED..........
Jun 17th, 2012 .. Alhumdulillah :)
FM_jun said:
i got a letter today from chc I .they request supplementery form,pcc,more proof,original marriage certificate & RPRF...they send me this letter on 22 may but i recieved today...i have 2 questions. from now how much time it will take? another i want to change my address .how much times it takes when u request for address change?
Congratulations :)

It could take upto 3-4 months till Visa. When you send the documents requested, send them a letter informing them that you want to change your mailing address. The letter has to have the applicant's name, file number and date of birth. Give them your new address and sign the letter. So when they will review your file, they will update your address and the next correspondence will be sent to your new address.
 

m_alihussain

Star Member
Jan 4, 2011
79
3
I have good new to share ;

Finally finally my wife got her medical+ppr request today ! Thanks to Allah and all forum members for helping us out ))))
 

Imtihaan

Hero Member
Jan 20, 2011
745
19
Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
c_sahar said:
Yes they had asked for his passport exactly 12 weeks ago!!!
that means they have stamped his visa and its on its way back to him. INSHAH ALLAH this week or next. INSHAH ALLAH
 

Imtihaan

Hero Member
Jan 20, 2011
745
19
Job Offer........
Pre-Assessed..
App. Filed.......
Oct 2010
File Transfer...
Dec 2010
Med's Request
Feb 25th, 2012
Med's Done....
March 5th, 2012
Passport Req..
Today Alhumdulillah June 19th, Ecas In Process on June 16th
VISA ISSUED...
June 30th Saturday
LANDED..........
July 3rd and July 4th
m_alihussain said:
I have good new to share ;

Finally finally my wife got her medical+ppr request today ! Thanks to Allah and all forum members for helping us out ))))
MASHAH ALLAH!!!!! CONGRATS!!!!!!!!!!!!! Super awesome.

whats her timeline please?
 

Khilafah5

Champion Member
Jun 19, 2011
2,349
75
Category........
Visa Office......
Islamabad
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2011
Doc's Request.
NONE
AOR Received.
31-08-2011
File Transfer...
15-09-2011
Med's Request
08-06-2012
Med's Done....
10-06-2012
Passport Req..
02-07-2012
VISA ISSUED...
02-08-2012
LANDED..........
24-08-2012
Imtihaan said:
MASHAH ALLAH!!!!! CONGRATS!!!!!!!!!!!!! Super awesome.

whats her timeline please?
may 2011

sis maknojia
 

jay123456

Star Member
Nov 1, 2011
187
3
afghan0123 said:
Danny Bhai,

I have sent an email to CHC ISB since 18 days asking for my case update, still i didn't received any response from their side.
I am confused............ pls help
I sent an email and got a reply after 6 weeks --and do let us know what their reply is