expressraja said:
As per the links, the lowest of FSWP+FSTP+CEC is 54,000. Take half of it i.e. 27,000 as only half of admissions are from EE system. So far, in 2016, CIC issued only 15,286 ITAs. There are another 11,714 ITAs to be issued for 2016. There are 12 more draws left in 2016 on average 2 draws per month. So, can we expect the no. of ITAs to be around 900+ this time??
Close to my opinion. And I made a mistake in my previous post too.
So
The total goal numbers for 2015 including FSW+CEC+PNP was 47k+21k+46k =114k(low). and those counted for both EE and people applied before EE.
The total goal numbers for 2016 including FSW+CEC+PNP was 54K +46K=100K and this also for EE and before 2016.
An admission means that PR visa has been issued.
We can take as hypothesis two facts:
(1)statistics of admissions is 2 person per application, which means 2 persons per ITA - it can be found in Quarterly data release (don't have the link now, but there's a picture
http://i.imgur.com/QqYdk5V.png - can see there are as many dependents as applicants)
2)Based on fact (1) the streams for EE and pre-EE admissions are divided 50/50.
The proofs of it - 31k of ITAs means 62K of people, and that is roughly 1/2 or a bit more of the target 2015 - 114k.
Moreover, the guy from CIC in the official video mentioned that streams are equal, a half for EE and a half for pre-EE - just watch the video again.
So what we have is that number of people to be admitted under EE in 2016 is 100k/2=50k.
And it means around 25000 ITAs this year. 15286 ITAs have been issued. If around 11 draws are left, the number of ITAs will be around 900 if we divide it equally. Or around 1000, if they continue with a couple of smaller draws like 750. OR more ITAs if they exceed the minimum number od go for maximum.
A weak side of my speculation is that we don't really now how big is the backlog, is it really around 25k of applications to be proceed or more.
A good side is that starting from September or even earlier the admissions will be counted towards 2016 and EE only, because pre-EE applications are supposed to be finalized in 2016.
Hope for the best%)