Do all the work permit processed at the same speed?You are welcome, IRCC has sometimes been all over the place. I applied May 18th, and was approved Aug 9th.
When I was still waiting, around July 26, IRCC was approving May30th apps, so I would say to not be worried about anything unless you've been waiting from a long long 6 months wait.
For example PGWP and PGWP-extension.
Thanks.