This site has been very helpful and remove a lot of stress and worrying. Thank you everyone, for your wisedom.
Here is my timeline.
we are 8 years age difference. both never married, no kids.
2011-04 went back to pay-respect for my grandfather in HCMC. meet a nice girl, exchange email and skypename.
2012-02 did a Singapore trip with her , and her mother (VN). my mother (CDN)and uncle (CDN)came along as I paid for their singapore/malaysia tour. she traveled with my family to Hanio and haiphong.
2012-09 I prosposed via skype
2012-11 Wedding vietnam and honeymoon in bangkok and phuket my brother (CDN)and mother , and cousins from china attended (I paid their trip). and many other vn cousins attended.
2012-12 went home to spend christmas/newyear with wife. submit marriage paper to vn. Visit Dalat and many places.
2013-02 went to vn to sign married paper to make marrige legit. and sign their marriage book. she gave me an original for me to submit to CIC. she also did her medical, so that I can bring back to canada.
complex and I'd filed everything as best I could. recipts of my visit to vn, everything.
The Skype output was tricky, but I used skyperious 0.10.6a, and was able to extract the complete logs. printed it all doublesided. 2page per side. it came out pretty thick, as we chatted every night.
in the end, it was a big size box. organized and split up into 6 folders, each with flight stubs, and tours, that we taken, with her name, and mine.
March 27 mail via canada post.
March28 confirm canada post received delivery CanadaPost Tracking #xxxxxxxxx
April-19-13 2:00:50 received AOR
UCI: xxxxxxxxxx
Application No.: xxxxxxxxxxx
April 23, 2013 3:41 PM Receive SA (sponsorship approval) forwarded to Singapore.
2013/5/2 - Wife received UCI number and same Application No.
2013-12 Went back for Christmas/new years with wife Viist Nha Trang, DaNang and coastal cities.
Just check on 15th feb 2014
The status has changed to in progress. feb11, 2014
feb 25th, wife started to receive 3 independant package our proof in the mail. looks like my skype message was missing. and not returned.
along with return of proof was an request to redo medical.
feb27 wife did medical. and submitted thru IOM. Wife also start the Police #2 incase they ask for it.
Mar26 email cic and they confirm receiving 2nd medical on the feb28th.
April 29th 2014, Receive Request for PassPort. via email, with an pdf on what to do next.
and a list of things to submit:
- Original Good Conduct Certificate "Phieu Ly Lich Tu Phap So 2"
- IMM 5669 Schedule A Background / Declaration form,
- Four (4) photos
- Original passport
- Appendix ‘A’
and 60 days to submit the above request.
05-May-2014, Wife took her paperwork to CVAC , but they told to come back on thrusday
as they were not ready to receive passport
08-May-2014, Wife report lineup was extremely long. cost 51USD , told to wait 4-6weeks.
05-June-2014 CIC shows Decision made.
"A decision has been made on your application. The office will contact you concerning this decision."
Visa application, tracking ID No.xxxxxxxxxxxxx – Your processed passport has been dispatched from the Canada Visa Office Singapore, on 12/06/2014 to the Canada Visa Application Centre. To know more, please call VAC helpline number or visit VAC website
19-June-2014 receive call, to pick up Passport.
20-June-2014 Pick up Passport with Visa
23-June-2014 flying out via Eva-Air, however, wife pregnant, they requested, she get a
doctors note, from the hospital. They will rebook her for next day.
24-June-2014 with doctor note. arrived in Toronto. long wait is over.
Order GCMS note, to see what i can see. and for my personal knowledge