+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
For example:

Performance Measurement
Expected Result Performance Indicator Target Date to be Achieved
Educational institutions and international students benefit from having foreign nationals study and work in Canada Number of student entries into Canada 110,000–125,000 End of each calendar year

Everybody knows there's no limit to student visas.. this must be a parameter used for measuring the immigration success..
 
JO1986 said:
For example:

Performance Measurement
Expected Result Performance Indicator Target Date to be Achieved
Educational institutions and international students benefit from having foreign nationals study and work in Canada Number of student entries into Canada 110,000–125,000 End of each calendar year

Everybody knows there's no limit to student visas.. this must be a parameter used for measuring the immigration success..

Yes, you are right there. These are targets rather than limits. But what happens when they reach these targets? do they still keep on giving visa?
 
App Filed: 10th April 2015
AOR 2: 12 jun 2015
In process: 2nd june 15
Medical:Already done
When should i expect passport call?
Please help, will it take a full year to get visa i.e in april/may 2016?
 
I assume they would continue giving the visas.

There are certain categories like Express Entry and PhD stream which have well defined limits (single number like 1000) rather than target ranges (like 10,000-12,000).
 
Nabaaf said:
Hieee rose68
Welcome to the forum
My timeline is exactly same as your's,except for the s.a email which v received on 24 th august....so delay in email notification is normal n usual thing fr cic....so our long waiting time has jus started....
Hoping for the speedy process fr everyone....

Cheers :)

Nabaaf
Hi Nbaaf,
Its nice to similar.U r from which part of India?
How i enter details of category below our user name? Pl. guide me.my medical also done on April20,2015. PL.be in touch.
R u on spreadsheet NEW DELHI - 2015 SPOUSAL VISA APPLICANTS? Bcose i don't find u on spreadsheet.
Good bye
 
Jasse said:
Thank you so much, you really are a champion member :) How exciting, I'm happy to hear that your waiting time is almost near, I can't wait until i'm in the same position as you, what a happy day it will be to hug our spouse!! By the way how can I give you a +1

Glad to help. Under my name you will see Good click that for +1 :)
 
draxz1289 said:
Glad to help. Under my name you will see Good click that for +1 :)

hey draxz ..do u think afghan EQ will delay further for Nov/Dec/Jan applicants
 
HI Guys

How ar you all. Any one from December 2014 Applicient applyed for notes.What is the current status for notes. 8) 8) 8)
 
prforme said:
hey draxz ..do u think afghan EQ will delay further for Nov/Dec/Jan applicants

Its very hard to say though we did see the applicants from Nepal being prioritized but that didn't affect the overall 8-10 month timelines.
Us for example got the re-medicals as predicted and interview waved and that too in what I like to call it the sweet spot - 8 to 10 months.
 
JO1986 said:
For example:

Performance Measurement
Expected Result Performance Indicator Target Date to be Achieved
Educational institutions and international students benefit from having foreign nationals study and work in Canada Number of student entries into Canada 110,000–125,000 End of each calendar year

Everybody knows there's no limit to student visas.. this must be a parameter used for measuring the immigration success..

CIC will not issue more visas if they reach their target/limit . target is good word which cic uses to say "limit-no more", just as PNP.

rather than checking history, check stats, 2014 has 500 applicants from NDVO, who shared timeline. this year its not even 100 on moth of october.

The re medical loop happend because of these huge numbers in 2014.
CIC will most likely slow down for PPR to not exceed target/limit, but they will process files and make PPR rain in January-Feb. I will bet you on this. wait till February and we will see change.
 
PNP2014 said:
CIC will not issue more visas if they reach their target/limit . target is good word which cic uses to say "limit-no more", just as PNP.

rather than checking history, check stats, 2014 has 500 applicants from NDVO, who shared timeline. this year its not even 100 on moth of october.

The re medical loop happend because of these huge numbers in 2014.
CIC will most likely slow down for PPR to not exceed target/limit, but they will process files and make PPR rain in January-Feb. I will bet you on this. wait till February and we will see change.

I sure hope you are wrong for the older applicants :) I cant imagine waiting till Jan/Feb to be issued the PPR. From what I have seen people have been averaging a month and a half after getting the re-medicals.
 
Hi Guys: Does anyone know, when we receive the notification that your file has been transferred to NDVO. So, does it mean physical transfer or electronic transfer of the file?

Thanks.
 
I submitted my application on 31st August. Lets c how it goes.

Hope the process gets faster this year. :)

Best of luck everyone.
 
rose68 said:
Hi Nbaaf,
Its nice to similar.U r from which part of India?
How i enter details of category below our user name? Pl. guide me.my medical also done on April20,2015. PL.be in touch.
R u on spreadsheet NEW DELHI - 2015 SPOUSAL VISA APPLICANTS? Bcose i don't find u on spreadsheet.
Good bye

Hie
I am from Mumbai....wat abt you?
Once u reach 10 post then u can edit ur profile and details below ur user name...
No I am not on spread sheet...
Tryd adding myself on spreadsheet bt was not able to do so successfully.....
U may see my timeline on left side....
U too stay in touch...
Hoping fr speedy procedure for everyone

Cheers :)

Nabaaf