fazal_81 said:
Dear Frnds,

I am seeking your advice in a matter. As you can see my timelines as follows:

Application sent to CIO, Sydney Nova Scotia : 29 March, 2011.
Received by CIO " " : 05 April, 2011.
An email containing PER or AOR with file # : 06 May, 2011.
Status from 06 May to 27 May 2011 : CIO Eligibilty Review complete.
File transfer to London VO (RBVO) : 27 May, 2011.

Since 27 May, 2011 till now its been 8 months and my status is still RBVO. And still the VO didnt contact my Employer. I didnt hire any lawyer or consultant for my case. I did all by my self, but now I am thinking to hire a lawyer to followup my case. As I hardworked a lot on it and I dont want it to get rejected. My duty timings and job is so tough that I cant follow up each and everything. Pls suggest me should I go ahead and hire a lawyer or not? Looking forward to hear from you soon.

Regards.

Fazal.
First of all, I want to sympathise with you, I share your frustration of being stuck at RBVO for so long. I want to assure you however that this has nothing to do with not hiring a lawyer. If you check the tracker, you will see that there are others stuck in this stage even longer than you...getting one now will only be a waste of money as there is absolutely nothing he/she can do for you at this stage. At best, he would only send an enquiry to VO, which you can do your self.
I will suggest this, send London VO an case specific enquiry, ask them if they require additional documents in order for your application to move to the next stage. Follow this link:
http://www.cic.gc.ca/english/information/offices/missions/london.asp
Mandie
 

naveed1

Hero Member
May 13, 2011
229
8
sialkot pakistan
Category........
Visa Office......
LONDON
NOC Code......
1233
Job Offer........
Pre-Assessed..
App. Filed.......
5 MARCH 2011
Doc's Request.
SENT WITH APPLICANTION ON 5 MARCH 2011
AOR Received.
11 APRIL 2011
IELTS Request
SENT WITH APPLICATION
File Transfer...
RBVO 8 MAY 2011 ( in process 2 nov 2011)
Med's Request
17 jan 2012
Med's Done....
8 feb 2012 rprf sent on 10 feb med recevied line added 5 march
Interview........
waived
Passport Req..
ppr1 9 july 2012 DM 13 july 2012 ppr2 13 sep 2012
VISA ISSUED...
23 sep 2012
LANDED..........
in nov or december Inshaallah
fazal_81 said:
Dear Frnds,

I am seeking your advice in a matter. As you can see my timelines as follows:

Application sent to CIO, Sydney Nova Scotia : 29 March, 2011.
Received by CIO " " : 05 April, 2011.
An email containing PER or AOR with file # : 06 May, 2011.
Status from 06 May to 27 May 2011 : CIO Eligibilty Review complete.
File transfer to London VO (RBVO) : 27 May, 2011.

Since 27 May, 2011 till now its been 8 months and my status is still RBVO. And still the VO didnt contact my Employer. I didnt hire any lawyer or consultant for my case. I did all by my self, but now I am thinking to hire a lawyer to followup my case. As I hardworked a lot on it and I dont want it to get rejected. My duty timings and job is so tough that I cant follow up each and everything. Pls suggest me should I go ahead and hire a lawyer or not? Looking forward to hear from you soon.

Regards.

Fazal.

i am totally agree with mandex
 

naveed1

Hero Member
May 13, 2011
229
8
sialkot pakistan
Category........
Visa Office......
LONDON
NOC Code......
1233
Job Offer........
Pre-Assessed..
App. Filed.......
5 MARCH 2011
Doc's Request.
SENT WITH APPLICANTION ON 5 MARCH 2011
AOR Received.
11 APRIL 2011
IELTS Request
SENT WITH APPLICATION
File Transfer...
RBVO 8 MAY 2011 ( in process 2 nov 2011)
Med's Request
17 jan 2012
Med's Done....
8 feb 2012 rprf sent on 10 feb med recevied line added 5 march
Interview........
waived
Passport Req..
ppr1 9 july 2012 DM 13 july 2012 ppr2 13 sep 2012
VISA ISSUED...
23 sep 2012
LANDED..........
in nov or december Inshaallah
sh_humayun said:
[seeking for a kind guidance.I have recieved my 2AOR on 4th MAr 2011 which was issued on 28-Feb-2011 On 08-Mar-2011 my estatus shows "In Processing" and inside prosessing detail is as under: "We received your application for permanent residence on April 22, 2010. We reviewed your application and sent you a letter on July 19, 2010. Please consider delays in mail delivery before contacting us. Your application and supporting documents were received by the London England office. They are pending review. A decision has been made on your application. The office will contact you concerning this decision. We transferred your application to the London England office on July 28, 2010. The London England office may contact you" Does 2AOR means according to the documents me is qualified now authetication of the documents to be checked? waiting for your valuable comments. With regards
Hi: It is better for u to send CSE to london visa office and ask them about the current status of ur application. 2 Aor is nothing but just an acknowledgement that the visa office has received ur documents. If ur status is in process and inside there is an extra line that when visa office started processing ur application then its mean that u are qualified otherwise ur application is still pending review by an immigration officer.

Hope it helps

Regards
 

bistolfi49

Star Member
Mar 21, 2011
193
2
ITALY
Category........
Visa Office......
Rome
NOC Code......
2151
Job Offer........
Pre-Assessed..
App. Filed.......
beginning of Apr-2011 encashed a week after submission
AOR Received.
beginning of Jul-2011 IN Process: end of Jul-2012
IELTS Request
submitted with initial application
File Transfer...
end of Jul-2011
Med's Request
mid of Jul-2012
Med's Done....
mid of Jul-2012
Interview........
waived
Passport Req..
mid of Nov-2012
VISA ISSUED...
mid of Nov-2012
LANDED..........
Spring 2013
Dear Fazal I am frustrated too:

Received by CIO " " : 01 April, 2011
An email containing PER or AOR with file # : 05 July, 2011
File transfer to VO (RBVO) : 29 July, 2011

and it is RBVO for 6 months, no more news from VO and don't exactly know when they are gonna start to processing my application..



fazal_81 said:
Dear Frnds,

I am seeking your advice in a matter. As you can see my timelines as follows:

Application sent to CIO, Sydney Nova Scotia : 29 March, 2011.
Received by CIO " " : 05 April, 2011.
An email containing PER or AOR with file # : 06 May, 2011.
Status from 06 May to 27 May 2011 : CIO Eligibilty Review complete.
File transfer to London VO (RBVO) : 27 May, 2011.

Since 27 May, 2011 till now its been 8 months and my status is still RBVO. And still the VO didnt contact my Employer. I didnt hire any lawyer or consultant for my case. I did all by my self, but now I am thinking to hire a lawyer to followup my case. As I hardworked a lot on it and I dont want it to get rejected. My duty timings and job is so tough that I cant follow up each and everything. Pls suggest me should I go ahead and hire a lawyer or not? Looking forward to hear from you soon.

Regards.

Fazal.
 

fazal_81

Hero Member
Jan 31, 2011
496
12
Saudi Arabia
Visa Office......
London
NOC Code......
0631
App. Filed.......
Complete application & suporting docs filed on 29-03-2011 & received by CIO on 05-04-2011.
Doc's Request.
12- Nov- 2014
AOR Received.
06-05-2011
IELTS Request
Sent with Application.
File Transfer...
RBVO on 26th May, 2011. File "In Process" on 30- April- 2013.
Med's Request
Alhamdulillah on 12- Nov- 2014, RPRF paid on 17- 11- 2014
Med's Done....
15- 11- 2014, Medicals received by LVO on 22- 11- 2014.
Interview........
Waived
Passport Req..
PPR-1 on 11 November, 2014
VISA ISSUED...
10-March, 2015 (PPR2). Submitted passports in VFS Riyadh on 11-03-2015, Received PPs on 29 March, 2015 along with CoPR.
LANDED..........
1st May, 2015 (Stayed 1 month). Settled for good: 29-06-2016
Thanx Mandie, Bistolif and Naveed,
Thanx guys for ur prompt reply. I know its not a use of hiring a lawyer now, its a waste of money. But its good to share suggestions. I alrdy sent the VO Case Specific enquiry and they sent an automatic msg that VO will reply within 28 days.

Regards.
 

naveed1

Hero Member
May 13, 2011
229
8
sialkot pakistan
Category........
Visa Office......
LONDON
NOC Code......
1233
Job Offer........
Pre-Assessed..
App. Filed.......
5 MARCH 2011
Doc's Request.
SENT WITH APPLICANTION ON 5 MARCH 2011
AOR Received.
11 APRIL 2011
IELTS Request
SENT WITH APPLICATION
File Transfer...
RBVO 8 MAY 2011 ( in process 2 nov 2011)
Med's Request
17 jan 2012
Med's Done....
8 feb 2012 rprf sent on 10 feb med recevied line added 5 march
Interview........
waived
Passport Req..
ppr1 9 july 2012 DM 13 july 2012 ppr2 13 sep 2012
VISA ISSUED...
23 sep 2012
LANDED..........
in nov or december Inshaallah
fazal_81 said:
Thanx Mandie, Bistolif and Naveed,
Thanx guys for ur prompt reply. I know its not a use of hiring a lawyer now, its a waste of money. But its good to share suggestions. I alrdy sent the VO Case Specific enquiry and they sent an automatic msg that VO will reply within 28 days.

Regards.
So just wait for reply . You will hear some good news inshaallah.
 

kalimorian

Hero Member
Jan 17, 2012
494
18
Karachi
Category........
Visa Office......
LVO
NOC Code......
2151
Job Offer........
Pre-Assessed..
App. Filed.......
7 March 2011
Doc's Request.
In-Process 18 june, 2012
AOR Received.
24 june,2011
File Transfer...
24 june,2011
Med's Request
18 aug,2012
Med's Done....
28 aug,2012, line on e-case 10,sep,12
Passport Req..
PPR1 3rd Jan,13 PPR2 7FEB,13
VISA ISSUED...
14th Feb,13
LANDED..........
soon
fazal_81 said:
Dear Frnds,

I am seeking your advice in a matter. As you can see my timelines as follows:

Application sent to CIO, Sydney Nova Scotia : 29 March, 2011.
Received by CIO " " : 05 April, 2011.
An email containing PER or AOR with file # : 06 May, 2011.
Status from 06 May to 27 May 2011 : CIO Eligibilty Review complete.
File transfer to London VO (RBVO) : 27 May, 2011.

Since 27 May, 2011 till now its been 8 months and my status is still RBVO. And still the VO didnt contact my Employer. I didnt hire any lawyer or consultant for my case. I did all by my self, but now I am thinking to hire a lawyer to followup my case. As I hardworked a lot on it and I dont want it to get rejected. My duty timings and job is so tough that I cant follow up each and everything. Pls suggest me should I go ahead and hire a lawyer or not? Looking forward to hear from you soon.

Regards.

Fazal.
Dear Fazal ..

Let me shear you my history to understand you only faith on GOD and focus straggle will answer you positive by ALLAH.

I am an architect and applied in the March, 2011. I also applied in 2002, and got refused due to less point in 2007, as I received my wife uncle blood relation proof late, and decision stand as rejection. I applied again in 2008 but then policy changed and architect were off listed. After two year I received my money back at least.... :) then suddenly new list came in and Architects NOC introduced.... I didn't mislay hope and send file again with all my documents in September 2010... Then they return my file in FEB 2011 as I didn't send the birth certificate I misunderstood either they need birth certificate if its registered in Union conical or not..hhha. So I send them again my file with my BC and received PER in June 2011. This is all my background so far and since 15 July 2011 I am RBVO. Here I believed constant focus straggle to achieve my targets… and that we all should do.

I am still at the same boat as you are so I must say wait and see... I also inquire with CHC London having same reply that my file is awaiting review by VO.

My time lines are

7 March 2011 application registered CIO
24 June 2011 PER received.
15 July RBVO.

I am form , Pakistan

Thanks
 

bistolfi49

Star Member
Mar 21, 2011
193
2
ITALY
Category........
Visa Office......
Rome
NOC Code......
2151
Job Offer........
Pre-Assessed..
App. Filed.......
beginning of Apr-2011 encashed a week after submission
AOR Received.
beginning of Jul-2011 IN Process: end of Jul-2012
IELTS Request
submitted with initial application
File Transfer...
end of Jul-2011
Med's Request
mid of Jul-2012
Med's Done....
mid of Jul-2012
Interview........
waived
Passport Req..
mid of Nov-2012
VISA ISSUED...
mid of Nov-2012
LANDED..........
Spring 2013
hi kalimorian , I am an Arch. too and more or less we have the same timeline, where are you from and how is job going there, do you have any job prospects in Toronto? good to hear you back.

kalimorian said:
Dear Fazal ..

Let me shear you my history to understand you only faith on GOD and focus straggle will answer you positive by ALLAH.

I am an architect and applied in the March, 2011. I also applied in 2002, and got refused due to less point in 2007, as I received my wife uncle blood relation proof late, and decision stand as rejection. I applied again in 2008 but then policy changed and architect were off listed. After two year I received my money back at least.... :) then suddenly new list came in and Architects NOC introduced.... I didn't mislay hope and send file again with all my documents in September 2010... Then they return my file in FEB 2011 as I didn't send the birth certificate I misunderstood either they need birth certificate if its registered in Union conical or not..hhha. So I send them again my file with my BC and received PER in June 2011. This is all my background so far and since 15 July 2011 I am RBVO. Here I believed constant focus straggle to achieve my targets... and that we all should do.

I am still at the same boat as you are so I must say wait and see... I also inquire with CHC London having same reply that my file is awaiting review by VO.

My time lines are

7 March 2011 application registered CIO
24 June 2011 PER received.
15 July RBVO.

I am form , Pakistan

Thanks
 

kalimorian

Hero Member
Jan 17, 2012
494
18
Karachi
Category........
Visa Office......
LVO
NOC Code......
2151
Job Offer........
Pre-Assessed..
App. Filed.......
7 March 2011
Doc's Request.
In-Process 18 june, 2012
AOR Received.
24 june,2011
File Transfer...
24 june,2011
Med's Request
18 aug,2012
Med's Done....
28 aug,2012, line on e-case 10,sep,12
Passport Req..
PPR1 3rd Jan,13 PPR2 7FEB,13
VISA ISSUED...
14th Feb,13
LANDED..........
soon
bistolfi49 said:
hi kalimorian , I am an Arch. too and more or less we have the same timeline, where are you from and how is job going there, do you have any job prospects in Toronto? good to hear you back.
Dear Bistol
I am not sure for my application future or approval as you can see my history... but yes I pray to GOD best for all of us.
I am an architect having my own company ... and doing well here in Pakistan.. Where are you from...? Do message me at kalimorian@hotmail.com for more to know each other...
Toronto and Montreal is the place where we can have a good option to work as an architect I guess...
Thanks
 

fazal_81

Hero Member
Jan 31, 2011
496
12
Saudi Arabia
Visa Office......
London
NOC Code......
0631
App. Filed.......
Complete application & suporting docs filed on 29-03-2011 & received by CIO on 05-04-2011.
Doc's Request.
12- Nov- 2014
AOR Received.
06-05-2011
IELTS Request
Sent with Application.
File Transfer...
RBVO on 26th May, 2011. File "In Process" on 30- April- 2013.
Med's Request
Alhamdulillah on 12- Nov- 2014, RPRF paid on 17- 11- 2014
Med's Done....
15- 11- 2014, Medicals received by LVO on 22- 11- 2014.
Interview........
Waived
Passport Req..
PPR-1 on 11 November, 2014
VISA ISSUED...
10-March, 2015 (PPR2). Submitted passports in VFS Riyadh on 11-03-2015, Received PPs on 29 March, 2015 along with CoPR.
LANDED..........
1st May, 2015 (Stayed 1 month). Settled for good: 29-06-2016
Dear March applicants,

My address just disappeared may be 2, 3 hrs ago. As when I checked my E- Cas in the afternoon at 3:30 PM, it was there but when I checked it now at 8 pm its disappeared. Hope and pray for some good and satisfactory news. It also disappeared a couple of months ago but I dont remember when and what date. As far as I've seen in the forum and heard from the forum fellows, the disappearance of address brings some update than may be it disappeared before RBVO. Lets see and I will Inshallah update you guys as soon as I hear some news.

Regards.

Fazal.
 

deex

Star Member
Aug 23, 2010
61
6
Category........
Visa Office......
NDVO
NOC Code......
3112
Job Offer........
Pre-Assessed..
App. Filed.......
23.03.11
Doc's Request.
with appli
AOR Received.
19.04.11
IELTS Request
with appli
File Transfer...
May 2011
Med's Request
29.11.11
Med's Done....
07.12.11
Interview........
waived
Passport Req..
29.11.11
VISA ISSUED...
20.01.12
LANDED..........
March 2012
FRIENDS, GOT OUR VISAS TODAY. :) :) :)
THANKS FOR ALL THE HELP AND SUPPORT.


Good Luck to all those waiting.

Deex
 

shaafqatz

Hero Member
Oct 1, 2010
232
6
Canada
Category........
Visa Office......
NDVO
Job Offer........
Pre-Assessed..
App. Filed.......
1-4-2011
AOR Received.
4-7-2011
IELTS Request
Sent with the application
Med's Request
18-11-2011
Med's Done....
4-12-2011
Interview........
Waived
Passport Req..
18-11-2011
VISA ISSUED...
20-01-2012
LANDED..........
24-05-2012
Many hearty congratulations!!! Did u received the registered post in the morning or evening? Pls let me know, I'll check with the local post office tomorrow. I'm still waiting for our PPs..

deex said:
FRIENDS, GOT OUR VISAS TODAY. :) :) :)
THANKS FOR ALL THE HELP AND SUPPORT.


Good Luck to all those waiting.

Deex
 

fazal_81

Hero Member
Jan 31, 2011
496
12
Saudi Arabia
Visa Office......
London
NOC Code......
0631
App. Filed.......
Complete application & suporting docs filed on 29-03-2011 & received by CIO on 05-04-2011.
Doc's Request.
12- Nov- 2014
AOR Received.
06-05-2011
IELTS Request
Sent with Application.
File Transfer...
RBVO on 26th May, 2011. File "In Process" on 30- April- 2013.
Med's Request
Alhamdulillah on 12- Nov- 2014, RPRF paid on 17- 11- 2014
Med's Done....
15- 11- 2014, Medicals received by LVO on 22- 11- 2014.
Interview........
Waived
Passport Req..
PPR-1 on 11 November, 2014
VISA ISSUED...
10-March, 2015 (PPR2). Submitted passports in VFS Riyadh on 11-03-2015, Received PPs on 29 March, 2015 along with CoPR.
LANDED..........
1st May, 2015 (Stayed 1 month). Settled for good: 29-06-2016
Dear all March applicants,

Plz keep this thread alive. I am noticing that it is goin down day by day so thats y I m posting watever I can.

I would like to share one thing very important. Yesterday on 27 Jan, 2012 (Friday), my application status "RBVO" completed full 8 months. It was last updated to "RBVO" on 27 May, 2011 and the address was disappeared before some days of RBVO but I dnt remember the date and days it remained disappeared.

Regards.

Fazal.
 

fazal_81

Hero Member
Jan 31, 2011
496
12
Saudi Arabia
Visa Office......
London
NOC Code......
0631
App. Filed.......
Complete application & suporting docs filed on 29-03-2011 & received by CIO on 05-04-2011.
Doc's Request.
12- Nov- 2014
AOR Received.
06-05-2011
IELTS Request
Sent with Application.
File Transfer...
RBVO on 26th May, 2011. File "In Process" on 30- April- 2013.
Med's Request
Alhamdulillah on 12- Nov- 2014, RPRF paid on 17- 11- 2014
Med's Done....
15- 11- 2014, Medicals received by LVO on 22- 11- 2014.
Interview........
Waived
Passport Req..
PPR-1 on 11 November, 2014
VISA ISSUED...
10-March, 2015 (PPR2). Submitted passports in VFS Riyadh on 11-03-2015, Received PPs on 29 March, 2015 along with CoPR.
LANDED..........
1st May, 2015 (Stayed 1 month). Settled for good: 29-06-2016
kalimorian said:
Dear Fazal ..

Let me shear you my history to understand you only faith on GOD and focus straggle will answer you positive by ALLAH.

I am an architect and applied in the March, 2011. I also applied in 2002, and got refused due to less point in 2007, as I received my wife uncle blood relation proof late, and decision stand as rejection. I applied again in 2008 but then policy changed and architect were off listed. After two year I received my money back at least.... :) then suddenly new list came in and Architects NOC introduced.... I didn't mislay hope and send file again with all my documents in September 2010... Then they return my file in FEB 2011 as I didn't send the birth certificate I misunderstood either they need birth certificate if its registered in Union conical or not..hhha. So I send them again my file with my BC and received PER in June 2011. This is all my background so far and since 15 July 2011 I am RBVO. Here I believed constant focus straggle to achieve my targets... and that we all should do.

I am still at the same boat as you are so I must say wait and see... I also inquire with CHC London having same reply that my file is awaiting review by VO.

My time lines are

7 March 2011 application registered CIO
24 June 2011 PER received.
15 July RBVO.

I am form , Pakistan

Thanks

Thanx for ur best wishes and givin high hopes dear frnd.
 

nokiadesire

Champion Member
Jun 5, 2011
1,151
45
India
Category........
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
LANDED..........
May 2012
deex said:
FRIENDS, GOT OUR VISAS TODAY. :) :) :)
THANKS FOR ALL THE HELP AND SUPPORT.


Good Luck to all those waiting.

Deex
CONGRATULATIONS DEEX 8) 8)
You have received it very quickly !!
Have a good life in Canada !!!

What is the date of the visa stamping in your passports ??
When and where are you planning to land ??

Regards
Nokiadesire