+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

London Visa Office

rq1987

Star Member
Sep 4, 2014
137
16
Category........
Visa Office......
London - RFI
NOC Code......
1212
Job Offer........
Pre-Assessed..
App. Filed.......
31-10-2014
Doc's Request.
12-05-2015
Nomination.....
28-01-2015
Med's Request
28-05-2015
Med's Done....
11-06-2015
Passport Req..
26-08-2015
VISA ISSUED...
08-09-2015
LANDED..........
02-10-2015
yazan142 said:
I had a similar situation, I made the payment online and sent a copy of receipts to LVO, I made the payment under the family class, as long as you are paying the correct fee and your name is spelled correctly on the receipt, there will be no issues, the receipt doesn't show under which category it has been paid, in addition and before I made the payment I received instructions from LVO itself to pay online, they provided me the link, under which the FSW was not listed- as you mentioned. I also paid the RPRF through the same link.
thank you brother. I will do the same then! :)
 

Wash an

Hero Member
Oct 20, 2013
767
170
managersonline said:
LONDON VISA OFFICE PERFORMANCE AS PER SPREADSHEET DATA DOWNLOADED ON 10TH APRIL 2015
PER:04-Jun-2014....MR:30-Jul-2014--> Days from PER to MR=56
PER:05-Jun-2014....MR:06-Aug-2014--> Days from PER to MR=62
PER:05-Jun-2014....MR:21-Aug-2014--> Days from PER to MR=77
PER:06-Jun-2014....MR:04-Sep-2014--> Days from PER to MR=90
PER:13-Jun-2014....MR:06-Sep-2014--> Days from PER to MR=85
PER:17-Jun-2014....MR:10-Sep-2014--> Days from PER to MR=85
PER:23-Jun-2014....MR:11-Sep-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: June=76
========================================================
PER:03-Jul-2014....MR:11-Sep-2014--> Days from PER to MR=70
PER:27-Jul-2014....MR:12-Sep-2014--> Days from PER to MR=47
PER:28-Jul-2014....MR:12-Sep-2014--> Days from PER to MR=46
PER:31-Jul-2014....MR:17-Sep-2014--> Days from PER to MR=48
========================================================
Average Days for MR after PER Received in: July=53
========================================================
PER:05-Aug-2014....MR:17-Sep-2014--> Days from PER to MR=43
PER:06-Aug-2014....MR:23-Sep-2014--> Days from PER to MR=48
PER:07-Aug-2014....MR:25-Sep-2014--> Days from PER to MR=49
PER:07-Aug-2014....MR:26-Sep-2014--> Days from PER to MR=50
PER:07-Aug-2014....MR:30-Sep-2014--> Days from PER to MR=54
PER:09-Aug-2014....MR:30-Sep-2014--> Days from PER to MR=52
PER:11-Aug-2014....MR:01-Oct-2014--> Days from PER to MR=51
PER:11-Aug-2014....MR:02-Oct-2014--> Days from PER to MR=52
PER:12-Aug-2014....MR:05-Oct-2014--> Days from PER to MR=54
PER:12-Aug-2014....MR:07-Oct-2014--> Days from PER to MR=56
PER:12-Aug-2014....MR:08-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:09-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:09-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=58
PER:14-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=57
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:16-Oct-2014--> Days from PER to MR=59
PER:19-Aug-2014....MR:16-Oct-2014--> Days from PER to MR=58
PER:19-Aug-2014....MR:20-Oct-2014--> Days from PER to MR=62
PER:19-Aug-2014....MR:21-Oct-2014--> Days from PER to MR=63
PER:20-Aug-2014....MR:24-Oct-2014--> Days from PER to MR=65
PER:21-Aug-2014....MR:24-Oct-2014--> Days from PER to MR=64
PER:21-Aug-2014....MR:28-Oct-2014--> Days from PER to MR=68
PER:22-Aug-2014....MR:29-Oct-2014--> Days from PER to MR=68
PER:25-Aug-2014....MR:30-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:04-Nov-2014--> Days from PER to MR=70
PER:26-Aug-2014....MR:04-Nov-2014--> Days from PER to MR=70
PER:27-Aug-2014....MR:05-Nov-2014--> Days from PER to MR=70
PER:27-Aug-2014....MR:07-Nov-2014--> Days from PER to MR=72
PER:27-Aug-2014....MR:10-Nov-2014--> Days from PER to MR=75
PER:28-Aug-2014....MR:12-Nov-2014--> Days from PER to MR=76
PER:28-Aug-2014....MR:12-Nov-2014--> Days from PER to MR=76
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:29-Aug-2014....MR:15-Nov-2014--> Days from PER to MR=78
PER:29-Aug-2014....MR:17-Nov-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: August=63
========================================================
PER:02-Sep-2014....MR:17-Nov-2014--> Days from PER to MR=76
PER:04-Sep-2014....MR:17-Nov-2014--> Days from PER to MR=74
PER:04-Sep-2014....MR:18-Nov-2014--> Days from PER to MR=75
PER:04-Sep-2014....MR:18-Nov-2014--> Days from PER to MR=75
PER:04-Sep-2014....MR:19-Nov-2014--> Days from PER to MR=76
PER:08-Sep-2014....MR:19-Nov-2014--> Days from PER to MR=72
PER:08-Sep-2014....MR:20-Nov-2014--> Days from PER to MR=73
PER:09-Sep-2014....MR:22-Nov-2014--> Days from PER to MR=74
PER:09-Sep-2014....MR:25-Nov-2014--> Days from PER to MR=77
PER:09-Sep-2014....MR:26-Nov-2014--> Days from PER to MR=78
PER:10-Sep-2014....MR:26-Nov-2014--> Days from PER to MR=77
PER:10-Sep-2014....MR:27-Nov-2014--> Days from PER to MR=78
PER:11-Sep-2014....MR:27-Nov-2014--> Days from PER to MR=77
PER:11-Sep-2014....MR:28-Nov-2014--> Days from PER to MR=78
PER:17-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=75
PER:17-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=75
PER:18-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=74
PER:18-Sep-2014....MR:03-Dec-2014--> Days from PER to MR=76
PER:19-Sep-2014....MR:05-Dec-2014--> Days from PER to MR=77
PER:22-Sep-2014....MR:09-Dec-2014--> Days from PER to MR=78
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=84
PER:25-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=83
PER:26-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=82
PER:26-Sep-2014....MR:18-Dec-2014--> Days from PER to MR=83
PER:28-Sep-2014....MR:18-Dec-2014--> Days from PER to MR=81
PER:29-Sep-2014....MR:19-Dec-2014--> Days from PER to MR=81
PER:30-Sep-2014....MR:19-Dec-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: September=77
========================================================
PER:01-Oct-2014....MR:19-Dec-2014--> Days from PER to MR=79
PER:02-Oct-2014....MR:23-Dec-2014--> Days from PER to MR=82
PER:02-Oct-2014....MR:05-Jan-2015--> Days from PER to MR=95
PER:02-Oct-2014....MR:06-Jan-2015--> Days from PER to MR=96
PER:03-Oct-2014....MR:08-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:16-Jan-2015--> Days from PER to MR=101
PER:08-Oct-2014....MR:19-Jan-2015--> Days from PER to MR=103
PER:08-Oct-2014....MR:21-Jan-2015--> Days from PER to MR=105
PER:08-Oct-2014....MR:22-Jan-2015--> Days from PER to MR=106
PER:08-Oct-2014....MR:27-Jan-2015--> Days from PER to MR=111
PER:08-Oct-2014....MR:28-Jan-2015--> Days from PER to MR=112
PER:09-Oct-2014....MR:29-Jan-2015--> Days from PER to MR=112
PER:09-Oct-2014....MR:30-Jan-2015--> Days from PER to MR=113
PER:09-Oct-2014....MR:02-Feb-2015--> Days from PER to MR=116
PER:09-Oct-2014....MR:04-Feb-2015--> Days from PER to MR=118
PER:14-Oct-2014....MR:06-Feb-2015--> Days from PER to MR=115
PER:17-Oct-2014....MR:09-Feb-2015--> Days from PER to MR=115
PER:21-Oct-2014....MR:10-Feb-2015--> Days from PER to MR=112
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:22-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=119
========================================================
Average Days for MR after PER Received in: October=107
========================================================
PER:02-Nov-2014....MR:21-Feb-2015--> Days from PER to MR=111
PER:03-Nov-2014....MR:24-Feb-2015--> Days from PER to MR=113
PER:03-Nov-2014....MR:26-Feb-2015--> Days from PER to MR=115
PER:04-Nov-2014....MR:27-Feb-2015--> Days from PER to MR=115
PER:04-Nov-2014....MR:28-Feb-2015--> Days from PER to MR=116
PER:12-Nov-2014....MR:03-Mar-2015--> Days from PER to MR=111
PER:13-Nov-2014....MR:03-Mar-2015--> Days from PER to MR=110
PER:13-Nov-2014....MR:06-Mar-2015--> Days from PER to MR=113
PER:15-Nov-2014....MR:09-Mar-2015--> Days from PER to MR=114
PER:17-Nov-2014....MR:10-Mar-2015--> Days from PER to MR=113
PER:24-Nov-2014....MR:11-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:12-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:12-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:13-Mar-2015--> Days from PER to MR=108
PER:25-Nov-2014....MR:16-Mar-2015--> Days from PER to MR=111
========================================================
Average Days for MR after PER Received in: November=111
========================================================
PER:09-Dec-2014....MR:16-Mar-2015--> Days from PER to MR=97
PER:10-Dec-2014....MR:18-Mar-2015--> Days from PER to MR=98
PER:11-Dec-2014....MR:18-Mar-2015--> Days from PER to MR=97
PER:11-Dec-2014....MR:26-Mar-2015--> Days from PER to MR=105
PER:16-Dec-2014....MR:27-Mar-2015--> Days from PER to MR=101
PER:22-Dec-2014....MR:09-Apr-2015--> Days from PER to MR=108
========================================================
Average Days for MR after PER Received in: December=101
========================================================
LVO- Overall Average Days for MR after receipt of PER:- 83-Days
All of above analysis is based on LVO applicants data in spreadsheet which I downloaded on 10th April,2015.
Good job. Please keep updating this and also include Jan, Feb and Mar PERs as well. Thanks
 

shsiddiki

Star Member
Jan 15, 2014
52
1
Pakistan
Category........
Visa Office......
London
NOC Code......
0112
Job Offer........
Pre-Assessed..
App. Filed.......
17-Dec-2014
Doc's Request.
with application
Nomination.....
with application
AOR Received.
5-Mar-2015 (PER)
IELTS Request
with application
Med's Request
1-Jun-2015
Med's Done....
Jul-2015
Interview........
Waived
Passport Req..
1-Oct-2015 , Passport submitted on 20th Oct
VISA ISSUED...
22nd Oct, 2015
LANDED..........
Landed June 2016 :)
I applied on 19 dec , DD encashed 10 Feb PER received 5 March :) , it says IN PROCESS and also come to know that my file is transferred to visa office London , when should I expect MR , or what's the next step.

Need senior forum members response.

Thanks
 

nasha27

Star Member
Oct 6, 2014
159
9
Job Offer........
Pre-Assessed..
samsaf29 said:
did you get any reply for above question? I have to pay fees for adding spouse also. but online portal only contains Express Entry-Adding Spouse dependent. NOT FSW.. did you sent any email to LVO?

kindly let me knw if you get any clear answer.
Spouse Addition Fees please pay the fees via Bank Draft....my case has been delayed by 2 months since I used payment fee form with Credit card detail for spouse processing fees. And on CSE after 2 months of sending docs i was notified that the payment method is not acceptable and please send bank draft to LVO.
 

raja053

Star Member
Oct 24, 2014
154
13
Visa Office......
London
NOC Code......
1212
Nomination.....
PER 05 March 2015
IELTS Request
Sent with Documents
Med's Request
14-10-2015
Passport Req..
09-11-2015
shsiddiki said:
I applied on 19 dec , DD encashed 10 Feb PER received 5 March :) , it says IN PROCESS and also come to know that my file is transferred to visa office London , when should I expect MR , or what's the next step.

Need senior forum members response.

Thanks
Bro. urs timeline is same as mine..
As per trend u should expect MR in May end or June start..

Regards
 

Moe2010

Star Member
Feb 7, 2010
195
16
Category........
Visa Office......
LVO
NOC Code......
2171
Job Offer........
Pre-Assessed..
App. Filed.......
May 2014
Doc's Request.
Feb 2015
Nomination.....
NA
AOR Received.
Sep 2014
IELTS Request
Sent with application
Med's Request
Feb 2015
Med's Done....
March 2015
Interview........
Waived
Passport Req..
April 2015
greatnewton said:
Dear,

Having LVO, my passport had been received at ABU embassy on 22 March 2015 and till now didn't come back. So you can see its already 18 days and still waiting for. Hence plan yourself.
Thanks for sharing your experience. I do have travel plans in early May. Maybe i should include a cover letter stating this with my application.

Any others with good experience with Abu Dhabi VO?
 

shoks

Star Member
Jan 30, 2015
53
4
Karachi, Pakistan
Category........
Visa Office......
London
NOC Code......
0111
Job Offer........
Pre-Assessed..
App. Filed.......
Dec 4, 2014
Nomination.....
Feb 20, 2015 (PER)
AOR Received.
SLU August 14 or 15
IELTS Request
Submitted with application
File Transfer...
Feb 20, 2015
Med's Request
September 25, 2015 Via LBM
Med's Done....
September 29, 2015 Call for sputum test (me & wife)
Interview........
Not yet
Passport Req..
Not yet
VISA ISSUED...
Not yet
LANDED..........
Not yet
managersonline said:
LONDON VISA OFFICE PERFORMANCE AS PER SPREADSHEET DATA DOWNLOADED ON 10TH APRIL 2015
PER:04-Jun-2014....MR:30-Jul-2014--> Days from PER to MR=56
PER:05-Jun-2014....MR:06-Aug-2014--> Days from PER to MR=62
PER:05-Jun-2014....MR:21-Aug-2014--> Days from PER to MR=77
PER:06-Jun-2014....MR:04-Sep-2014--> Days from PER to MR=90
PER:13-Jun-2014....MR:06-Sep-2014--> Days from PER to MR=85
PER:17-Jun-2014....MR:10-Sep-2014--> Days from PER to MR=85
PER:23-Jun-2014....MR:11-Sep-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: June=76
========================================================
PER:03-Jul-2014....MR:11-Sep-2014--> Days from PER to MR=70
PER:27-Jul-2014....MR:12-Sep-2014--> Days from PER to MR=47
PER:28-Jul-2014....MR:12-Sep-2014--> Days from PER to MR=46
PER:31-Jul-2014....MR:17-Sep-2014--> Days from PER to MR=48
========================================================
Average Days for MR after PER Received in: July=53
========================================================
PER:05-Aug-2014....MR:17-Sep-2014--> Days from PER to MR=43
PER:06-Aug-2014....MR:23-Sep-2014--> Days from PER to MR=48
PER:07-Aug-2014....MR:25-Sep-2014--> Days from PER to MR=49
PER:07-Aug-2014....MR:26-Sep-2014--> Days from PER to MR=50
PER:07-Aug-2014....MR:30-Sep-2014--> Days from PER to MR=54
PER:09-Aug-2014....MR:30-Sep-2014--> Days from PER to MR=52
PER:11-Aug-2014....MR:01-Oct-2014--> Days from PER to MR=51
PER:11-Aug-2014....MR:02-Oct-2014--> Days from PER to MR=52
PER:12-Aug-2014....MR:05-Oct-2014--> Days from PER to MR=54
PER:12-Aug-2014....MR:07-Oct-2014--> Days from PER to MR=56
PER:12-Aug-2014....MR:08-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:09-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:09-Oct-2014--> Days from PER to MR=57
PER:13-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=58
PER:14-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=57
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:10-Oct-2014--> Days from PER to MR=53
PER:18-Aug-2014....MR:16-Oct-2014--> Days from PER to MR=59
PER:19-Aug-2014....MR:16-Oct-2014--> Days from PER to MR=58
PER:19-Aug-2014....MR:20-Oct-2014--> Days from PER to MR=62
PER:19-Aug-2014....MR:21-Oct-2014--> Days from PER to MR=63
PER:20-Aug-2014....MR:24-Oct-2014--> Days from PER to MR=65
PER:21-Aug-2014....MR:24-Oct-2014--> Days from PER to MR=64
PER:21-Aug-2014....MR:28-Oct-2014--> Days from PER to MR=68
PER:22-Aug-2014....MR:29-Oct-2014--> Days from PER to MR=68
PER:25-Aug-2014....MR:30-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:31-Oct-2014--> Days from PER to MR=66
PER:26-Aug-2014....MR:04-Nov-2014--> Days from PER to MR=70
PER:26-Aug-2014....MR:04-Nov-2014--> Days from PER to MR=70
PER:27-Aug-2014....MR:05-Nov-2014--> Days from PER to MR=70
PER:27-Aug-2014....MR:07-Nov-2014--> Days from PER to MR=72
PER:27-Aug-2014....MR:10-Nov-2014--> Days from PER to MR=75
PER:28-Aug-2014....MR:12-Nov-2014--> Days from PER to MR=76
PER:28-Aug-2014....MR:12-Nov-2014--> Days from PER to MR=76
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:28-Aug-2014....MR:14-Nov-2014--> Days from PER to MR=78
PER:29-Aug-2014....MR:15-Nov-2014--> Days from PER to MR=78
PER:29-Aug-2014....MR:17-Nov-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: August=63
========================================================
PER:02-Sep-2014....MR:17-Nov-2014--> Days from PER to MR=76
PER:04-Sep-2014....MR:17-Nov-2014--> Days from PER to MR=74
PER:04-Sep-2014....MR:18-Nov-2014--> Days from PER to MR=75
PER:04-Sep-2014....MR:18-Nov-2014--> Days from PER to MR=75
PER:04-Sep-2014....MR:19-Nov-2014--> Days from PER to MR=76
PER:08-Sep-2014....MR:19-Nov-2014--> Days from PER to MR=72
PER:08-Sep-2014....MR:20-Nov-2014--> Days from PER to MR=73
PER:09-Sep-2014....MR:22-Nov-2014--> Days from PER to MR=74
PER:09-Sep-2014....MR:25-Nov-2014--> Days from PER to MR=77
PER:09-Sep-2014....MR:26-Nov-2014--> Days from PER to MR=78
PER:10-Sep-2014....MR:26-Nov-2014--> Days from PER to MR=77
PER:10-Sep-2014....MR:27-Nov-2014--> Days from PER to MR=78
PER:11-Sep-2014....MR:27-Nov-2014--> Days from PER to MR=77
PER:11-Sep-2014....MR:28-Nov-2014--> Days from PER to MR=78
PER:17-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=75
PER:17-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=75
PER:18-Sep-2014....MR:01-Dec-2014--> Days from PER to MR=74
PER:18-Sep-2014....MR:03-Dec-2014--> Days from PER to MR=76
PER:19-Sep-2014....MR:05-Dec-2014--> Days from PER to MR=77
PER:22-Sep-2014....MR:09-Dec-2014--> Days from PER to MR=78
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:10-Dec-2014--> Days from PER to MR=77
PER:24-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=84
PER:25-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=83
PER:26-Sep-2014....MR:17-Dec-2014--> Days from PER to MR=82
PER:26-Sep-2014....MR:18-Dec-2014--> Days from PER to MR=83
PER:28-Sep-2014....MR:18-Dec-2014--> Days from PER to MR=81
PER:29-Sep-2014....MR:19-Dec-2014--> Days from PER to MR=81
PER:30-Sep-2014....MR:19-Dec-2014--> Days from PER to MR=80
========================================================
Average Days for MR after PER Received in: September=77
========================================================
PER:01-Oct-2014....MR:19-Dec-2014--> Days from PER to MR=79
PER:02-Oct-2014....MR:23-Dec-2014--> Days from PER to MR=82
PER:02-Oct-2014....MR:05-Jan-2015--> Days from PER to MR=95
PER:02-Oct-2014....MR:06-Jan-2015--> Days from PER to MR=96
PER:03-Oct-2014....MR:08-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:12-Jan-2015--> Days from PER to MR=97
PER:07-Oct-2014....MR:16-Jan-2015--> Days from PER to MR=101
PER:08-Oct-2014....MR:19-Jan-2015--> Days from PER to MR=103
PER:08-Oct-2014....MR:21-Jan-2015--> Days from PER to MR=105
PER:08-Oct-2014....MR:22-Jan-2015--> Days from PER to MR=106
PER:08-Oct-2014....MR:27-Jan-2015--> Days from PER to MR=111
PER:08-Oct-2014....MR:28-Jan-2015--> Days from PER to MR=112
PER:09-Oct-2014....MR:29-Jan-2015--> Days from PER to MR=112
PER:09-Oct-2014....MR:30-Jan-2015--> Days from PER to MR=113
PER:09-Oct-2014....MR:02-Feb-2015--> Days from PER to MR=116
PER:09-Oct-2014....MR:04-Feb-2015--> Days from PER to MR=118
PER:14-Oct-2014....MR:06-Feb-2015--> Days from PER to MR=115
PER:17-Oct-2014....MR:09-Feb-2015--> Days from PER to MR=115
PER:21-Oct-2014....MR:10-Feb-2015--> Days from PER to MR=112
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:21-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=120
PER:22-Oct-2014....MR:18-Feb-2015--> Days from PER to MR=119
========================================================
Average Days for MR after PER Received in: October=107
========================================================
PER:02-Nov-2014....MR:21-Feb-2015--> Days from PER to MR=111
PER:03-Nov-2014....MR:24-Feb-2015--> Days from PER to MR=113
PER:03-Nov-2014....MR:26-Feb-2015--> Days from PER to MR=115
PER:04-Nov-2014....MR:27-Feb-2015--> Days from PER to MR=115
PER:04-Nov-2014....MR:28-Feb-2015--> Days from PER to MR=116
PER:12-Nov-2014....MR:03-Mar-2015--> Days from PER to MR=111
PER:13-Nov-2014....MR:03-Mar-2015--> Days from PER to MR=110
PER:13-Nov-2014....MR:06-Mar-2015--> Days from PER to MR=113
PER:15-Nov-2014....MR:09-Mar-2015--> Days from PER to MR=114
PER:17-Nov-2014....MR:10-Mar-2015--> Days from PER to MR=113
PER:24-Nov-2014....MR:11-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:12-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:12-Mar-2015--> Days from PER to MR=107
PER:25-Nov-2014....MR:13-Mar-2015--> Days from PER to MR=108
PER:25-Nov-2014....MR:16-Mar-2015--> Days from PER to MR=111
========================================================
Average Days for MR after PER Received in: November=111
========================================================
PER:09-Dec-2014....MR:16-Mar-2015--> Days from PER to MR=97
PER:10-Dec-2014....MR:18-Mar-2015--> Days from PER to MR=98
PER:11-Dec-2014....MR:18-Mar-2015--> Days from PER to MR=97
PER:11-Dec-2014....MR:26-Mar-2015--> Days from PER to MR=105
PER:16-Dec-2014....MR:27-Mar-2015--> Days from PER to MR=101
PER:22-Dec-2014....MR:09-Apr-2015--> Days from PER to MR=108
========================================================
Average Days for MR after PER Received in: December=101
========================================================
LVO- Overall Average Days for MR after receipt of PER:- 83-Days
All of above analysis is based on LVO applicants data in spreadsheet which I downloaded on 10th April,2015.
Nice work dear. +1 for you, it is clearing depicting what is going on. Thanks
 

INAM khan

Hero Member
Feb 21, 2015
287
4
Visa Office......
LVO ( RFI)
NOC Code......
0111
Job Offer........
Pre-Assessed..
App. Filed.......
31-10-2014
Nomination.....
29-01-2015
AOR Received.
SLU: 26/08/2015
File Transfer...
05/02/2015
Med's Request
Waiting. ........
shsiddiki said:
I applied on 19 dec , DD encashed 10 Feb PER received 5 March :) , it says IN PROCESS and also come to know that my file is transferred to visa office London , when should I expect MR , or what's the next step.

Need senior forum members response.

Thanks
Dear Brother, How did you get this information, that your file has transferred to LVO. Please reply. Thanks
 

raja053

Star Member
Oct 24, 2014
154
13
Visa Office......
London
NOC Code......
1212
Nomination.....
PER 05 March 2015
IELTS Request
Sent with Documents
Med's Request
14-10-2015
Passport Req..
09-11-2015
nasha27 said:
Spouse Addition Fees please pay the fees via Bank Draft....my case has been delayed by 2 months since I used payment fee form with Credit card detail for spouse processing fees. And on CSE after 2 months of sending docs i was notified that the payment method is not acceptable and please send bank draft to LVO.
can u please confirm when u sent the fee form.. and if u dont mind ..can u share the CSE reply.. as many members have to go for addition of spouse.

Regards
 

Rai Mazhar Farid Jami

Hero Member
Nov 18, 2014
404
59
Canada
Visa Office......
London
NOC Code......
0013
App. Filed.......
11-09-2014
Doc's Request.
Pics req 10 Feb, submitted on 16 Feb 2015....Schedule A & PCC request on 29 July2015
Nomination.....
31-12-2014
AOR Received.
NA
IELTS Request
Submitted with application
File Transfer...
2nd line updated on 29 July 2015
Med's Request
22 January 2016 , RPRF and passport copies
Med's Done....
28 January 2016 and medical received line updated on 12 Feb 2016
Interview........
NA
Passport Req..
10 February 2016 submitted on 16 Feb
VISA ISSUED...
11 March 2016
LANDED..........
30-01-2017
immigrant2b said:
i recieved gcms notes 2 days back.there was update till 03-03-15 but eligibilty medical security was not started.i raised CSE yesterday.BWJ is visa officer
What's ur timeline plz ?
 

sheray

Hero Member
Aug 3, 2014
206
47
Dubai
Visa Office......
London VO
NOC Code......
2281
App. Filed.......
11-09-2014
Doc's Request.
No Photo Request.
Nomination.....
PER - 30-12-2014
AOR Received.
SLU (20 JAN 2015) Updated on 26 Aug 2015
IELTS Request
Sent with app.
Med's Request
12-09-2015
Med's Done....
15-09-2015 , Medicals Received , 14-10-2015
Passport Req..
23-10-2015
LANDED..........
11-03-2016
Visa Office......: London VO
NOC Code......: 2281
App. Filed.......: 11-09-2014
Nomination.....: PER - 30-12-2014

NO photo request. No 2nd line update ! :'(
 

saudkhan418

Hero Member
Feb 11, 2014
268
11
Category........
Visa Office......
London
NOC Code......
1212
Job Offer........
Pre-Assessed..
nasha27 said:
Spouse Addition Fees please pay the fees via Bank Draft....my case has been delayed by 2 months since I used payment fee form with Credit card detail for spouse processing fees. And on CSE after 2 months of sending docs i was notified that the payment method is not acceptable and please send bank draft to LVO.
When did u paid fee via DD? few applicants have paid fee via online portal.. may be ur case is 3-4 months old
 

gul487

Full Member
May 5, 2014
46
8
malikkhayyam said:
VO: RIH


APPLICANT
GodIsAmazing
HorgaBorga
Javoo
Garduuk
Indianbritish
msibai
Malang
ImranUphy
ruffy11
amasroo
scotchn
sovereign
jonsco00
Aminow
SBI
malikkhayyam
Moj
Tima69
shb
INAM khan
NOC
1212
x
1111
0111
2132
2171
2133
x
2171
1111
2131
1111
2171
1111
1123
0111
0113
1224
x
0111
APP DATE
2-Jun-14
25-Jun-14
26-Jun-14
x
3-Jul-14
3-Jul-14
3-Jul-14
4-Jul-14
7-Jul-14
4-Jul-14
9-Jul-14
7-Jul-14
4-Jul-14
25-Aug-14
27-Aug-14
27-Aug-14
25-Aug-14
27-Aug-14
20-Oct-14
3-Nov-14
PER
2-Oct-14
12-Oct-14
26-Oct-14
27-Oct-14
28-Oct-14
28-Oct-14
28-Oct-14
29-Oct-14
30-Oct-14
30-Oct-14
3-Nov-14
16-Nov-14
17-Nov-14
12-Dec-14
14-Dec-14
18-Dec-14
18-Dec-14
19-Dec-14
18-Jan-15
29-Jan-15
Photo/ Doc Req
x
10-Jan-15
x
x
x
x
x
x
17-Mar-15
x
x
x
x
x
x
4-Feb-15
6-Feb-15
4-Feb-15
18-Feb-15
x
MR
11-Feb-15
11-Mar-15
x
x
x
x
x
x
23-Mar-15
x
6-Feb-15
x
7-Apr-15
x
x
x
x
x
x
x
PPR
x
x
x
x
x
x
x
x
x
x
9-Mar-15
x
x
x
x
x
x
x
x
x

Please share your timeline if you have Visa Officer RIH
Include me as well,

On 09Apr received MR+RPR Fee + PCC email.
Time line : Per 18Oct , NOC 2132, VO RIH

Gul
 

FIK

Star Member
Feb 21, 2015
90
4
Pakistan
Category........
Visa Office......
LVO - RIH
NOC Code......
0111
Job Offer........
Pre-Assessed..
App. Filed.......
25-08-2014
Doc's Request.
28-04-2015 - Updated Schedule A
Nomination.....
22-12-2014 PER
AOR Received.
N/A
IELTS Request
submitted with application
File Transfer...
Not Known
Med's Request
01-05-2015 with PRPF
Med's Done....
18-05-2015, TLU 29-05-2015
Interview........
Waived
Passport Req..
25-06-2015
VISA ISSUED...
17-07-2015
gul487 said:
Asa to All ,

On 09Apr received MR+RPR Fee + PCC email.
Time line : Per 18Oct , NOC 2132, VO RIH

Gul
Many congrats