+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Kazkaz is the applicant 4131 in the list Got PPR request.

kazkaz said:
Dear ALL
AoA
Alhamdurilla I have received the Passport Request today.
Please pray for further process,

Thanks for everybody support!!
 
This will surely shake em up hard! i'd say its a good call, they might give you the actual time frame or send another bu** sh**ting reply.. Theres not much to loose anyway as its an inquiry from a frustrated applicant :)

salmanahm said:
This is totally unacceptable and I am about to write to them that either you tell me the time OR I will withdraw my application and file a law suite against you.
 
About Verifications:

Above list showing those who have verified by CHC , if we will count the months applicants have got verification calls minimum in 3 months and maximum in 7 months after submission of full documents to CHC.

If we see on the other threads CHC delhi, CHC Buffalo, CHC London etc, applicants have got verification calls minimum in 3 months and maximum in 6 months after submission of full documents to CHC.
 
Office closures during 2011

Date Closed for:

April 22 Good Friday

April 25 Easter Monday

May 2 Early May Bank Holiday

May 30 Late May Bank Holiday

July1 Canada Day

August 29 Late August Bank Holiday

September 5 Labour Day

October 10 Thanksgiving

December 26 ChristmasDay

December 27 Boxing Day
 
I think they deserve to be suit. what they have done is very criminal... May be we all should now write them to clearly give us new time line. It is very hard to sit on "Two years or more".

salmanahm said:
This is totally unacceptable and I am about to write to them that either you tell me the time OR I will withdraw my application and file a law suite against you.
 
staralihaider said:
About Verifications:

Above list showing those who have verified by CHC , if we will count the months applicants have got verification calls minimum in 3 months and maximum in 7 months after submission of full documents to CHC.

If we see on the other threads CHC delhi, CHC Buffalo, CHC London etc, applicants have got verification calls minimum in 3 months and maximum in 6 months after submission of full documents to CHC.

It mean that pakistani applicants who applied in April-2010 and got thier 2AOR in Feb-2011, will have to wait for getting verification calls for thier documents)academic, professional, marriage and kids birth certiifcates) 31-Aug-2011.
Am i right?


Happy easter to all our christian freinds.

hu
 
Can anyone please tell me , In how much time after receiving PER can post june 2010 Pakistani applicants expected to receive IP status, Medical, PPR and fin aly VISA ??
 
ss1886 said:
Can anyone please tell me , In how much time after receiving PER can post june 2010 Pakistani applicants expected to receive IP status, Medical, PPR and fin aly VISA ??

within very short span of time like might be in one month
 
sh_humayun said:
within very short span of time like might be in one month

@ sh_humayun
It has been two months after PER for me, but my status is still RBVO, so How caw you say one month ??
 
ss1886 said:
@ sh_humayun
It has been two months after PER for me, but my status is still RBVO, so How caw you say one month ??

My observation is:

For post june 2010, Total time duration till visa is minimum 10 and maximum 15 months.

For PER 1 to maximum 3 months, for medical 8 to 10 months.


Currently For pre june 2010, Total time duration till visa is minimum 14 and maximum 28 months.
For 2nd AOR 2 to 4 months, For medical 10 to 15 months.
 
ss1886 said:
@ sh_humayun
It has been two months after PER for me, but my status is still RBVO, so How caw you say one month ??

Friend i have just seen a case on some thread which took only one month. I will give you the reference if i will find it again. i was wonder to see a such short span of time then i think that because he is post jun-10 applicant so he is getting short time. give me some time for finding out the refernece
 
sh_humayun said:
Friend i have just seen a case on some thread which took only one month. I will give you the reference if i will find it again. i was wonder to see a such short span of time then i think that because he is post jun-10 applicant so he is getting short time. give me some time for finding out the refernece

Category........: FSW1
Visa Office......: New Delhi
NOC Code......: 3142
App. Filed.......: 01-11-2010
AOR Received.: 1st PER Recieved 20/02/2011
IELTS Request: Sent
File Transfer...: 2nd AOR, 22nd March 2011, In Process on Apr 15th 2011
Med's Request: 18-04-2011
Med's Done....: 22-04-2011
Interview........: Hope waived off
Passport Req..: 18-04-2011
VISA ISSUED...: waiting
 
sh_humayun said:
within very short span of time like might be in one month

Dear it was totally irrelevant answer,you belong to 2005 applicant stream/old category ,you should not plunge into sharing an information that is baseless,especially to our new members/fresh applicants.
No time frame is so far available for New applicants/post june26 category .
Couple of days ago there was Nector who gave vent to the information that was absolutely baseless/sourceless or found-less.