Hello all, this might be a little off topic. I am 8th Jan 2020 AOR and i read something very disturbing earlier on another forum. A person mentioned that if IRCC does not shed the load off by clearing backlog, they might have to return the applications and refund the fee to applicants. It was mentioned that it was once done back in 2004 as well. Can someone shed some light on this? I hope that is not the case because ever since i have read this, My anxiety level have hit the sky. Thanks in advance.