hi guys,
tooooo slow in chat as we are in different situation. mine is very much different. may be useful for some friends. i am blessed with daughter on October 13.
application was filed on sept 23
PER on Jan 07
I sent email to NDVO to include newborn on Jan 09
Reply from NDVO with instructions to include the newborn Feb 03
AOR from Warsaw Feb 04
I sent an inquiry (CSE) to Warsaw, whether to send the documents to NDVO or WARSAW for which I got reply from CIO.
Sent another email to Warsaw in Warsaw-im-enquiry@international.gc.ca and got reply on the same day directing me to send the documents to Warsaw.
I am confused in drawing DD for processing fee to my newborn daughter (CAD 150). Warsaw office site instructs to draw a DD equal to CAD 150 from a Canadaian Bank or in polish currency from a Poland post office which is not possible for me. My doubt is whether we can draw a DD from India (SBI)? Is there any Canadian Bank? I guess Scotia Bank has few branches but having tie up with kotak mahindra bank. I will try to call them tomorrow and be ready to draw a DD if Warsaw replies.
This may be useful for everyone as we need to draw DD (once after medicals is over) for Landing fee.
Good Luck to All