+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
DragonPhoenix86 said:
Good morning to all. I have some questions for those who had their medical exam in St Lukes Global City Taguig.

1. How long does it usually take to finish all the required tests and physical exam? (assuming that you will not be required to undergo any further/additional tests or be referred to specialists pa).

2. How was your experience? Madami bang tao, services etc.

Appreciate any inputs. Thanks for sharing :)

Hello Dragonphoenix,

I think depende sa araw na mgpapamedical ka. may nabasa ako na madami daw tao pag mon and fri. In my case, tues ako ngpunta and before 7am andun na ako. ok nman ang medicals, very smooth and organize yong process. around 1030am tapos na ako. need bumalik ng 2pm for the results ng medical exam. kung ok results diretso mmr ka na. halos mag 4pm nung matapos lahat. konti lang tao nung ngpunta ako. In terms of service, oks naman, satisfied naman ako.
 
fjzdecastro said:
Guys ask lang po kasi nagbayad ako ng RPRF online. Nagfill up ko naman lahat ng information needed then after maconfirm na pumasok sa credit card ko, may lumabas na pdf receipt form. Yung receipt form name at yung bayad ko lang lumabas..yun na po ba mismo yung ipapadala ko sa email ng CEM?

In my case, i got an email right after i paid online and in the email may pdf attachment ng receipt. This PDF is the one i sent to CEM's email, and followed the instructions on how to send this to them based on the MR/RPRF notification letter.
 
sa mga PPR nag book na ba kayo ng ticket? i,m just worried na lalong magmamahal ang ticket pag di kagad ni book. And do you have any recommended agency or site for promo and cheap tix to toronto? Thanks
 
Willow05 said:
We are doing the same po... Di na Rin namin ipapa-enroll ang baby namin. I checked the school, classes will start naman in September pa, so kayang kaya pa. And madali lang naman magpa enroll dun kasi nasa law nila na kelangan lahat ng kids nasa school, Kahit in the middle of the school year pa kayo dumating, pwede pa Rin pa-enroll.

As for your timeline, if base dun sa trend Ngaun, expect PPR anytime soon. Be ready na ng pictures nyo para pag receive nyo ng PPR email, fill out nlng nung form na ipapadala nila then send na Agad para mapabilis ang DM and visa. Ang sa Amin, mga approx. 15 days from PPR to DM, hoping na mga 15 days din from DM to visa received (base dun sa timeline ng Iba). Usually, Thursdays ang update ng CEM, Pansin ko LNG.

Thanks po Willow05, anxious lng din kmi cguro and the wait is really a test din. Naginquire na rin ako because all of my sisters are there na rin. So hopefully, we can join them soon.
 
Hi applied under noc 3012 here's my timeline:

Received application June 6, 2014
processes application October 2, 2014

Until now no feedback still awaiting MR doest it really take that long?
Im an ofw based on SG but my visa office of choice was Manila since my common law resides in our permanent address. If medicals come, should i mail to manila or the hospital directly send themselves?
 
Ask ko lang po kasi nagpamedical po ako last april 30,2015 sa slecbgc tapos may grade 1.1 daw po ako sa chest xray result (meaning a scar/fibrous streak sa research ko). pero ung previous xray ko naman sa ibang hospital (1 week lang bago ako nagpamedical) normal chest xray naman ung result. pinag MMR injection naman na po ako sa slec and wala na naman pong ibang test or medication na kelangan. Wala naman akong history ng TB, pero nagka bronchitis ako nung 2011 and nag antibiotic. Magkaka problem po kaya ako sa application ko? Tnx..
 
tanung lang po, samin kami 1 month na since PPR naming pero til now wala parin kami DM/4th line. Hindi parin binabalik passport naming. May concern kaya d2? or may nakaexperienced na ba d2 na may PPR na pero wala parin DM? Salamat
 
Good day, paano po ba mag case specific inquiry? June 18 applicant here under 3012. Still no 2nd line or MR.

Losing hope. :(

TIA for those who will reply...
 
*****CURRENT UPDATE*****

lNqU4fU.jpg


Dumadami na udpates.......
Dami parin nghihintay.......
Darating din tayo dyan.......... 8) 8) 8)
Hopefully, di naman sana 16months daw...

God bless
 
von0904 said:
I just received an email update about my application stating that my file has been received on 23rd December 2014. I already received my PER last March 14. Is this AOR? Email from High Commission of Canada Singapore.

Yes, AOR. SGVO will process your application. Mas mabilis ata sila compared sa MVO. Baka mas mauna ka pa sakin matapos.
 
mrs_ad said:
Good day, paano po ba mag case specific inquiry? June 18 applicant here under 3012. Still no 2nd line or MR.

Losing hope. :(

TIA for those who will reply...

Click this link - https://secure.cic.gc.ca/enquiries-renseignements/case-cas-eng.aspx?mission=manila

Just fill up the necessary and include in your concerns on the content. They usually reply within a week. I tried it last month, they actually responded to me the day after.. with a generic reply. But atleast i have known my file is with them.

God bless
 
dmac11 said:
*****CURRENT UPDATE*****

lNqU4fU.jpg


Dumadami na udpates.......
Dami parin nghihintay.......
Darating din tayo dyan.......... 8) 8) 8)
Hopefully, di naman sana 16months daw...

God bless

Wow Bro you're back! :)
Musta na? :)
 
dmac11 said:
Click this link - https://secure.cic.gc.ca/enquiries-renseignements/case-cas-eng.aspx?mission=manila

Just fill up the necessary and include in your concerns on the content. They usually reply within a week. I tried it last month, they actually responded to me the day after.. with a generic reply. But atleast i have known my file is with them.

God bless

Thank you so much. I just sent the inquiry....

Sana naman dumating na ang update. Magwa 1 year na next month ang application ko. :(

Lord..help us... :'(
 
mrs_ad said:
Good day, paano po ba mag case specific inquiry? June 18 applicant here under 3012. Still no 2nd line or MR.

Losing hope. :(

TIA for those who will reply...

Hi! Im also under 3012 applied last June 6, 2014. Still awaiting for MR. I enquire about the status of my application via ECS still awaiting response. Pag pray natin na dumating na ang June MR batch :)
 
tinsandiego said:
Hi! Im also under 3012 applied last June 6, 2014. Still awaiting for MR. I enquire about the status of my application via ECS still awaiting response. Pag pray natin na dumating na ang June MR batch :)

hi tinsandiego! batch pala tayo. yes, indeed. let's pray for each other and everyone here. hehehe.. nakaka-worry talaga, but I know God will hear our prayers.