+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Status
Not open for further replies.
naticom said:
I mean how we could know they "opened" 1000 packages but not 800 or, even lower, 600?
The numbers updated on official site does not seem to be reliable. I bet next update we'll see a sudden jump for 2132 and 2171 from 5XX to 1000.

Well, at the least, to be counted towards CAP, a package has to go through completeness check.

To go through completeness check, the package must be 'opened'.

Hence, if the CAP updates reflect completeness check, then 1000 applications have been 'opened' thus far.

Off-course, i hope you will agree that there is nothing concrete to suggest how CIC works till the time an applicant receives PER.
 
ramandeep0015 said:
Hi

If anybody from Punjab can tell me the procedure for PCC , Like I got married 11 months back and I don't have any residence proof for my spouse. And marriage certificate is not acceptable.

Anybody here who faced the same issue. please suggest

Get PCC from your native palce or apply through PSK
 
Navraj said:
Thank u nd +1 for u plz tell can i see this in excel fromat.........or i hav to use web


Thanks buddy....When the user is below 50 u will see the excel format.....
 
Vivek0710 said:
Please be advised that your file is pending officer's review. At present no action is required on your part. Our office will contact you once the next steps on your file are determined.

MEANS??

I see that you have received AOR. Therefore "your file is pending officer's review" means that it is currently undergoing background checks (theoretically at-least) after which an interview will either be waived (most-likely) or scheduled, following which MR request will be raised.
 
ashif_eee said:
Thanks buddy....When the user is below 50 u will see the excel format.....


as to view it using web doesn't provide freeze panes option or data filters.......nd how can the spreadsheet be modified
 
vind said:
Get PCC from your native palce or apply through PSK

My friend...

from my experience (PSK - Ahmedabad) they asked for a common bank passbook where my and my wifes name is shown....so u can do one thing....add your spouse name in a common bank account and take it as a proof of residence at PSK...]

Though confirm with PSK before you take this step, as if it is valid or not.....
 
nishesh3003 said:
I see that you have received AOR. Therefore "your file is pending officer's review" means that it is currently undergoing background checks (theoretically at-least) after which an interview will either be waived (most-likely) or scheduled, following which MR request will be raised.

Wait is not over yet :(
 
Vivek0710 said:
Wait is not over yet :(

Yes, for a whole lot of others too :)

Good luck!
 
Hi Karan,

Thank you for your reply. I just want to know, we have attached resume as additional sheet towards main duties. we did not create other additional sheet. we actually filled question 12 b like this

from to occupation NOC period Main duties
2010 till date civil engineer 2131 2-3 years resume attached

1998 2010 civil engineer 2131 6 years resume attached

I hope we are correct. please advise
 
phanwaar said:
Thanks Holic.

I have one more query?? in Generic Application Form, What should i write in Current Occupation ???? My Generic Designation in Company or The NOC i am targeting ?

Designation as mentioned in your employment records and as listed in your work reference letter
 
Sunsat said:
Hi Karan,

Thank you for your reply. I just want to know, we have attached resume as additional sheet towards main duties. we did not create other additional sheet. we actually filled question 12 b like this

from to occupation NOC period Main duties
2010 till date civil engineer 2131 2-3 years resume attached

1998 2010 civil engineer 2131 6 years resume attached

I hope we are correct. please advise

Whats Resume Attached?? You need duties from your company HR or supervisor on company letterhead and not resume. Did you attach those along?
 
regarding work experience letter

deal all,
I telecommunication engineer (Electrical&electronic bachelor's degree) i have 12 years experience, the first 6 years i worked as operation and maintenance engineer in a mobile system and the other 6 years i was wireless manager department. my Reference letter from my company descried the two intervals main duties , however some of the main duties described in the noc 2133(electrical and electronic engineers) i was doing while i was a manger, as a result the main duties required for noc 2133 are divided into the two intervals (maintenance engineer&manger engineer). After reading your posts and how cic reject many files cos of experience letters i am getting too scared that my file will be rejected. I was thinking of sending another reference letter with more accuracy regarding the job duties. what do you recommend me seniors,, please help
 
ashif_eee said:
Here u go buddy........:D

FSW14 SS download Link:

https://docs.google.com/spreadsheets/d/11gAbKSoDoOr1s8_raB1qwz0i-ZH0NyNWhhn18O6kHwQ/export?format=xlsx&id=11gAbKSoDoOr1s8_raB1qwz0i-ZH0NyNWhhn18O6kHwQ

Thanks Ashifeee

I was looking for this link....to do some sorting and filtering to estimate my case....

Thnks a lot....

+1 added.....
 
amit6sibal said:
Guys Guys Guys can u judge my excitement......

Received PER just 30 min back.....

Details are as follows........

NOC - 1114
App date - 24.07.2014
cc date - 11.11.2014
PER date - 18.11.2014

I am travelling to mumbai... No access to google docs

Admin Requesting you to update the SS.


Thankyou all for your help and guidance...........


Congratulations..!!!

My CC also got charged on 11.11.2014 but not received PER mail :(

Anyone please provide info when should I expect PER mail ???????
 
Guys,Any PER received for NOC 1123 lately in August?Please share..thanks
 
Status
Not open for further replies.