Mine DD is of ICICI Bank and i am 30th july applicant. NOC 2281adisu01 said:My DD is cleard on last Friday but the PER is not yet come. Don't worry about DD, if the DD is taken from Indian, it would take approx. 5-7 days to clear it. By the way which bank is yours?
Just a reply over this excellent post by shah2014 (+1 due).shah2014 said:@ ALL THOSE WHO ARE WORRIED ABOUT DELAY IN CC/DD Charging.
I can see some of the applicants getting worried about CC/DD charges of applicants of later dates. You guys need to understand, CIC working process (no one knows for sure but here is how expert explain it).
1. Applications are reviewed by subject matter specialists, so all IT related NOC are reviewed by IT team, engineering related NOC by Engineer's team and so on.
2. The strength of NOC team depends on expected application inflow. Therefore, IT related team will have more resources than fields which are not even expected to get filled.
3. The applications are allocated to each resource in batches (may be of 5-10)
4. Every application is unique and every person has its own speed. Therefore, if simplest app goes to fastest processor, it may be reviewed in 1-2 hrs, whereas most complex (more dependents and year experience) gone to slow processor (like me) may take more than a day.
Therefore, it is quite possible that one team is ahead of others by few days or even weeks. Note that these difference in charge dates have always been there. Earlier, during 1st month of processing it was 1-2 days, which extended to 3-4 days in 3rd month of processing and now to more than a week. At that time we used to say “CIC is working parallel on 2-3 days of application). The reason behind is that the team, which was initially fast (may be due to workload, number of apps per day for specific field, average complexity of apps received in that field etc) has gone further ahead and the other teams are still struggling to catch up.
Most importantly, initially inflow of new apps per day was high and the difference was not that apparent. Now, as the number of new apps has reduced, it has become more apparent/visible. In absolute terms, the difference may be only 100-150 apps and remain constant but earlier it was matter of 2-3 days, now it has become 2-3 weeks.
Don' forget, some apps (may be 5-10%) are placed for “senior management” review for audit of the whole process. Its just to monitor performance of reviewers through sampling, nothing to worry about. You must have heard that IELTS result of few candidates get delayed beyond usual 13 days, as their results are selected as “SAMPLE” to add authenticity. Same is the case here. Btw, all such apps are counted towards the cap before placing for “audit review” only charging is made after finalization. This also explains some apps being charged 1-2 weeks after “CAP” full.
There is nothing to worry about, unless apps related to ur NOC and date have been charged for more than a week. I have been to the same situation when my app (9th May) was charged 2-3 days after first charge of 9th May applicants. I do understand that in such situation, nothing can calm your nerves but I have tried my level best to explain the situation in different ways. Stay calm and pray hard.
All the BEST.
hi, me 2, 2173, received Aug 13... let's wait and pray . no worrysanjeev_rg said:Its been 91 days and i havent heard anything. Aug 13th 2173 applicant here.
Looks like they are charging august applicants and I have no idea when they will charge my CC.
Depressed. 2171 and 2173 are capped.idefix said:Just a reply over this excellent post by shah2014 (+1 due).
This would explain a lot of things. Everybody was expecting the processing times to be much faster with the CAP of NOC 2174.
However, we didn't saw that, the rate was kept the same. What we saw in the last few days was the 217x NOCs 20+ days ahead of the other NOCs.
This simply means the IT team of the CIO was kept on the same size as before, and therefore this NOCs went much faster.
In a few days they should finish the all the 217x NOCs but the 2172 and the team should hopefully be reassigned to other NOCs.
Finally, per the SS, the applications from the NOCs 1112, 2171, 2173 and 2174 accounted for almost 40% of the applications, so things should move much faster for everybody else once this NOCs are capped and everybody is reassigned.
Don't worry, you will make the CAP for sure.namreddy said:But one simple equation is holding me... for 2 months 20 days 2171 capped at 558 and with in next month will it be to 450...I assume no but again why they halted charging to answer...
DHL took 7 days to deliver my package else I would have been 26th Aug and have cc charged by now ...
They are not capped yet. They should go until the end of september. They are just moving faster than the others.suhas.phartale said:Depressed. 2171 and 2173 are capped.
Congratulations for your PER !!!!!!!!!!!!!Suhas said:As I was reviewing the forum thread, I noticed the push message from centralised intake office. Yes, it is PER email received just now.
Application received date= july 17, 2014
Noc: 0111 finance manager
Mode of payment: DD
Congratulations for Your MR/RPRF Request !!!!!!Vcpatel said:Rcvd RPRF, MR request
My timeline.: NOC 2132 NDVO
App filed: 11th june 14
PER rcvd: 8th Oct 14
MR RPRF Req: 11th Nov
All the best for all of you.
And thanks for the support
Can anyone please share their experience from NDVO on how to pay RPRF and how to undergo MR.
Thanks in advance.
Congratulations for your Credit Card Charge !!!!!!!!!!!!!teebaby said:Hello All,
Thanks for your support.
App. Received: 13th August 2014
CC Charge: 11th November 2014
NOC: 2171
God be praised. I am so happy.
23 points. Same as mine.deepcan said:hello
can any body tell me how many marks I get for masters degree. my WES report mentions "Canadian Equivalency Summary = Masters Degree". I did MBA for masters degree. I am confused between 22 and 23. Anyone having any idea please clarify.
thanks
Congratulations for your Credit Card Charge !!!!!!!!!!!!!dadabigboy said:now that one is charged, the wait and prayer for PER begins, i pray for favor on behalf of everyone waiting for PER. when can someone like me who got charged today expect PER? JULY 30 applicant, fee encased today 11/11/2014.
I am also 2171, 28th Aug applicant. I am also worried. None of the statistics is making sense now. Let me know if you got any news.namreddy said:Hi All,
2171 charging halted at Aug 26th and I am Aug 28th Applicant any chances that 2171 is capped out bit worried guys....
Fingers crossed. Pray hard.idefix said:They are not capped yet. They should go until the end of september. They are just moving faster than the others.