Hello everyone - I just started following this thread. This is my scenario -
AOR - 2018/10/24 (
Over 8-months now)
Assessments -
Eligibility:
Review Required
Security:
Not Started
Criminality:
Passed
Medical:
Passed
Info Sharing:
Complete
APPLICATION ASSIGNMENT
Assigned To:
CB01126
Assigned By:
JM01158
Due Date:
2019/02/07
I do not see for what reason is the review required in the last 2 pages of the GCMS notes. However, I do see this on the 3rd page of the GCMS notes -
GROUP NAME:
1
Created Date:
2018/08/30 09:54:32
Created By:
C9677
Updated Date:
2019/04/29 07:03:49
Updated By:
SM8683
Group #:
1-GY9X9MY
Name::
Review Required -
Status:
In Progress
Type:
PR - Temporary Processing
On my Indian passport there is no Last Name, so I checked with an IRCC agent before filling the application and I was advised to enter all the given name in the Last Name field and leave the First Name field blank since the last name is a mandatory field but the first name can be left blank(They also told me that this is the general procedure they follow). Any idea if this what the review would be for ? Attaching screenshot from my notes(bottom links). Do you see anything alarming ?
Thanks for any suggestion/opinion/advise.
https://drive.google.com/open?id=1oIyMOul7Kifw3o0PDGgI7S7TZu2NUjfU
https://drive.google.com/open?id=193JZ86Gl9LQgbTccURZKDP36Coag7cUb