Hello,
I am a PNP applicant (august 2016). I applied for the bridging open work permit in 2017 and is going to expired in 3 weeks.
If I don't get the PR in this 3 weeks can I applied for a new bridging open work permit? and this application is the same that I did the first time or something is different?
I am not pretty sure if I have to applied for a new bridging open work permit of just and extension
Thanks.
I am a PNP applicant (august 2016). I applied for the bridging open work permit in 2017 and is going to expired in 3 weeks.
If I don't get the PR in this 3 weeks can I applied for a new bridging open work permit? and this application is the same that I did the first time or something is different?
I am not pretty sure if I have to applied for a new bridging open work permit of just and extension
Thanks.