+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Finally, my BG is in progress for the 2nd time now. ;D

Just a bit of relief... sigh!
 
JP_IndoCan said:
Finally, my BG is in progress for the 2nd time now. ;D

Just a bit of relief... sigh!

Great news JP
 
Congrats on PPR.
Share your country / visa office - it would be there in your PPR mail

Tora Makun said:
Thanks to you all !!

Here is my timeline

Category: FSWO
NOC Code: 2171
Job Offer: No
ITA: 20-04-2016
AOR Received : 26-04-2016
IELTS Request: 27-04-2016
File Transfer : 27-04-2016
Medical Status : Passed
Interview : Not needed at this time
BG Status : In Progress (12-09-2016)
PPR : 16-09-2016
 
RyanGiggs011 said:
Could you share your full timeline ?
=========
category: fsw outland from India, oinp nomination received on feb 2nd 2016, accepted on feb 27th
points:1038
ita 10th March 2016
aor:apr 22nd
medicals passed: apr 25th
schedule 4 request: apr 27th, uploaded same day
waiting for bg check to turn to progress or receive ghost email...so far only silence
 
Hello dpr...

I believe you are PNP outland,not FSW outland.My timeline is similar to yours and awaiting for PPR for almost 5 months now.
 
Below is my timeline, pls advise

Nomination: SINP
AOR: 3 Apr 2016
File Transferred to LVO: 7 July
BG changed to in progress: 13 July

Primary VO: London
Second VO: Ottawa
 
JP_IndoCan said:
Finally, my BG is in progress for the 2nd time now. ;D

Just a bit of relief... sigh!

great news, we nearly there ...
 
Ns@2016 said:
Hello dpr...

I believe you are PNP outland,not FSW outland.My timeline is similar to yours and awaiting for PPR for almost 5 months now.
Me too in same boat bud....OINP outland ....BG check Not needed since beginning...It"ll b 6 months in October first week!!
 
3 months almost over since AOR…

I ordered GCMS notes on 10 August 2016. I received the analysis on 15 September 2016. The notes are as of 23 August 2016.

1. CASE ANALYST NOTES
REVIEW TYPE: Case Analyst APPLICATION: E000XXXXX REGULATION: PNP: FSW, 2016-06-23 I have verified this application under Section 11.2 of the Immigration and Refugee Protection Act (IRPA) and make the following determination. RECOMMENDATION: ***Appears to meet requirements*** Ready to Finalize___________________________ CIVIL STATUS: PA (MY NAME), MARRIED SPOUSE/CL (MY NAME), ACCOMPANYING DEP 1 (MY SON’S NAME), ACCOMPANYING DEP 2 (MY DAUGHTER’S NAME) ______________________ INTEGRATED SEARCH (FOSS/GCMS): PA (MY NAME) No trace in GCMS/FOSS other than present application…... Goes on for my wife and kids (stating ‘No trace in GCMS/FOSS other than present application).................. after detailing my work experience, the Analyst states ‘The letter(s) of reference appear to demonstrate that the PA met the minimum requirements of 12 months of work experience.' Duties appear consistent with a substantial number of the main duties under the NOC Code selected’.... PA meets education requirements.

2. SECURITY
Not started for both me and my wife

3. CRIMINALITY
Passed for both me and my wife

4. MEDICAL
Passed (for me and our 2 kids) - No health impairment sufficient to prevent admission for medical reasons under Section 38 (1) (a)
Passed (for my wife) – Has a condition for which the potential demand on health or social services is not sufficient to exclude admission under Section 38(1)(c )..... I guess this is because my beautiful has a heart murmur – not a major problem..

5. INFO SHARING
This entails information sharing between USA and Canada.

No matched Records for myself – Not necessary for the kids since they are Americans

One Matched record for my wife;
Status: Ready to be Assessed
Retain: N
Retained in Error: N
Deleted: N
Type: Dept. of State refusal/lookout
Code: Unqualified Non-Immigrant
Reason: R

6. CORRESPONDENCE
Shows details of all correspondence through MyCIC… for those already sent and received by me; Status shows ‘Sent’
Two correspondences whose status shows ‘Not Started’
(i) Item: Kit, Application forms – Created on 7 July 2016
(ii) Item: Request Letter/Lettre de demande – Created on 5 July 2016

I don’t know what to make of 5: INFO SHARING regarding my wife’s US Visa Refusal and NOTE 6: CORRESPONDENCE regarding Kit, Application forms..
 
abdulqayyum said:
Below is my timeline, pls advise

Nomination: SINP
AOR: 3 Apr 2016
File Transferred to LVO: 7 July
BG changed to in progress: 13 July

Primary VO: London
Second VO: Ottawa

Any day now...
 
Hi,

I am bit confused about the status of file which shows eligibility in progress other details are given below,
I am not sure that is something wrong with my file?

Category........: PNP
Visa Office......: New Delhi
NOC Code......: NOC 1111
App. Filed.......: 5th APR-2016
Doc's Request.: 7th APR-2016
Nomination.....: 2nd FEB-2016
AOR Received.: 06th APR-2016
Med's Done....: Passed on 1st MAY-2016
Review of Eligibility : In Progress
BG Check : Not needed at this time
 
batak31 said:
Hi,

I am bit confused about the status of file which shows eligibility in progress other details are given below,
I am not sure that is something wrong with my file?

Category........: PNP
Visa Office......: New Delhi
NOC Code......: NOC 1111
App. Filed.......: 5th APR-2016
Doc's Request.: 7th APR-2016
Nomination.....: 2nd FEB-2016
AOR Received.: 06th APR-2016
Med's Done....: Passed on 1st MAY-2016
Review of Eligibility : In Progress
BG Check : Not needed at this time
Same for me, I think it's something to do with their recent update.