Sorry if it has been asked previously. Shob documents- transcript, work experience letter, pay slip, bank certificate ki sudhu photocopy pathabo na notarized?
Vaia,chocolate78118 said:Sorry if it has been asked previously. Shob documents- transcript, work experience letter, pay slip, bank certificate ki sudhu photocopy pathabo na notarized?
Thanks ashif bhai.....ashif_eee said:Vaia,
Since notarization is a controversial matter..several times this issue has been discussed on various thread...
I would suggest u to avoid all confusion/controversial matters. U should notarized all the photocopies u r going to submit.
Since notarization of a document will not affect ur file where its not required/but absence of notarization will affect where it is required.
Atleast all of SGVO applicants can do this ...![]()
Sorry my bad....chocolate78118 said:Thanks ashif bhai.....
this is apu btw![]()
Dear vaia,scorpio939 said:Payment method options: Debit card (Int'l Master Card) or Demand Draft, which would be better ?
I have a Debit card (Int'l Master Card), which I would like to use. I have adequate funds in it, more then CAD 550, for PR application fee. Is it safe to use it ?
Or should I try to pay by " certified cheque, bank draft or money order" ?
I've heard that for BD applicants CIC only accepts draft from SCB only. Does any one know how much it costs?
Thanks in advance
copy onlycjg1987 said:Guys Birth certificate should be provided original or copy?
Vaia,obaied said:copy only
I am from Bangladesh, brother. I have applied in March 17 through a consultant. Back then I was not even sure if FSW 2014 is going to open or not. But they only sent my Uni papers. Later ICAS asked for SSC/HSC docs. Complete documents received on 5th May. (1.5 months wasted here)subrun said:But why u applied at ICAS ? Where are you from ?
BR//Subrun.
Bro, this prediction is too hard.. No one can predict 2281 will fill by July or not...Mushfiq_1987 said:I am from Bangladesh, brother. I have applied in March 17 through a consultant. Back then I was not even sure if FSW 2014 is going to open or not. But they only sent my Uni papers. Later ICAS asked for SSC/HSC docs. Complete documents received on 5th May. (1.5 months wasted here)![]()
So now can you tell me if they are going to take all 8 weeks? Or can I hope to get it sometime in between 6 - 8 weeks? And what do you think about NOC 2281? Will it be filled before July?![]()
Yes I am doing that. Pray for me.immasum said:Bro, this prediction is too hard.. No one can predict 2281 will fill by July or not...
Pray for a early response from ICAS, (BTW prepare all other documents), once ICAS give you ECA report...Just send it to CIC.