Me. It’s 73 days after uploading everything into portal. How long are you waiting? Same AOR - April 6.Aor 6 April….no update after medical and BG step back from “we are processing” to “not started” but i have one outland dependent (india)
Me. It’s 73 days after uploading everything into portal. How long are you waiting? Same AOR - April 6.Aor 6 April….no update after medical and BG step back from “we are processing” to “not started” but i have one outland dependent (india)
so you got 73 days ago the portal request?Me. It’s 73 days after uploading everything into portal. How long are you waiting? Same AOR - April 6.
This is very common and should not delay your application.Any idea how long does this RR caused by the US visa refusal take them to process? I am already crossed five months timeline.
So you got GU on Sunday? Do they still work on the weekend?Finally, after a long wait, there was an update on the current status field (AS PROFILE UPDATED) on my profile when I checked the full application status then there is no change in my profile. Does it mean any good sign is on the way?
Feb 13th draw.
AOR - April 22nd.
Biometrics - already done before at the work permit stage.
Medicals - May 10th.
GU - Nothing (As far as I remembered).
Did not talked with any IRCC agent so don't know about the VO!!
I did not logged into my account on Friday might be the update is from Friday.So you got GU on Sunday? Do they still work on the weekend?
Any idea, when they can start security. Do we come to know if they have started. Also the duration for security to complete.Criminality: Passed
Security: Not started
Eligibility: Not started
Info sharing: Complete
Same here, got an update on Friday, but not sure what it means.Finally, after a long wait, there was an update on the current status field (AS PROFILE UPDATED) on my profile when I checked the full application status then there is no change in my profile. Does it mean any good sign is on the way?
Feb 13th draw.
AOR - April 22nd.
Biometrics - already done before at the work permit stage.
Medicals - May 10th.
GU - Nothing (As far as I remembered).
Did not talked with any IRCC agent so don't know about the VO!!
I have really no idea... check this link https://help.gcmsnotes.com/code/aor-to-ppr#summaryAny idea, when they can start security. Do we come to know if they have started. Also the duration for security to complete.
CIO, Sydney, Nova Scotia.Hi
In my gcms it says primary office is Montreal immigration
Secondary: centralized intake office anybody know where is secondary one