So I finally received my second GCMS notes this morning. I found out that an analyst worked on my file on the 30th of January. I have been trying to post the notes here ( I don’t know if it’s a conceptual block issue on my part- I never seem to learn how to do this).
I have a reviewed required by the analyst. The first review required was by a program assistant done last year November.
@cansha and all gurus in the house. Please I will need your expertise and experience to guide me through the long notes. Once I get around uploading it.
Quick question. Is it possible to navigate the upload with a phone?![]()
Try scrolling down the file and look into the Notes. It's usually the one near the end of the GCMS file. What is your review required and have you sent documents related to it?