+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

Visa approved

ambujnagchaudhuri

Full Member
Jul 16, 2014
29
0
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2014
File Transfer...
18-06-2014
Med's Done....
10-06-2014
VISA ISSUED...
17/07/2014
Finally received the email along with the status update on VFS website

Happy ...
 

rajsidhu

Star Member
Jul 20, 2014
77
0
Job Offer........
Pre-Assessed..
App. Filed.......
07-07-2014
File Transfer...
07-07-2014
Med's Done....
07-07-2014
Passport Req..
11-08-2014
VISA ISSUED...
14-08-2014
LANDED..........
soon
When did you apply and can you share your profile? Congrats :)
 

tkthakur

Star Member
Jun 5, 2014
194
26
Toronto , Canada
Category........
FSW
Visa Office......
Ottawa
NOC Code......
6321
App. Filed.......
15-06-2018
AOR Received.
15-06-3018
IELTS Request
7
Med's Done....
Pre Medicals 20 days before applying
Passport Req..
02-08-2018
LANDED..........
Waheguruji tera shukar hai
ambujnagchaudhuri said:
Finally received the email along with the status update on VFS website

Happy ...
Congrats....both the things happened together mail and status update?? When and from where you have applied??
 

uppalmp

Hero Member
Jul 8, 2014
238
2
Category........
Visa Office......
chandigarh
Job Offer........
Pre-Assessed..
App. Filed.......
07/07/2014
IELTS Request
6.0 (L-6.5,R-6,W-6,S-6)
File Transfer...
07/07/2014
VISA ISSUED...
Rejected 29-07-2014
ambujnagchaudhuri said:
Finally received the email along with the status update on VFS website

Happy ...
Congrats dear
 

ambujnagchaudhuri

Full Member
Jul 16, 2014
29
0
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2014
File Transfer...
18-06-2014
Med's Done....
10-06-2014
VISA ISSUED...
17/07/2014
tangygirl said:
share ur profile
Manipal University - Dubai Campus
CGPA - 7.0/10
Last two sem cgpa - 8.69/10
Final semester GPA -9.75/10

TOEFL ...
R - 27
L - 20
S - 28
w - 27
102
102/120

Experience -
1. Capsutec - Brazil
To analyse and design encapsulating machine parts, gears on Solid Works thus increasing the efficiency of the machine.

2. Essar Power - India {Graduation project}
Suggested ways to increase the efficiency of Gas turbine through failure analysis of gas turbine hydrodynamic journal bearing, by increasing the firing temperature and pressure ratio of combustion chamber in Gas turbine and NOX reduction.
Project aim:
A. To increase the efficiency of the Gas turbine
B. Gas turbine upgradation.

3. Schlumberger - India
Worked in the Drilling and Measurement section. Project aimed at re-designing and increasing efficiency of the vacuum station by removing all air cavities inside the Measurement While Drilling tools. Project was estimated around $ 3000 only with the new design proposed, against the estimated cost of $ 5000.
Project aim:
1. Reducing the time from 3 hours to 0.5 hours to 1 hour maximum.
2. Reducing technician involvement.
3. Improving asset utilization
4. Improving people utilization.
5. Reduce handling.
6. Improve Turn Around Time.
Analysed and designed the walk in box which carries tools and other materials to the oil field site which is used in drilling work.

4. ONGC - India
Worked on the overhauling of Gas Compressor. Gained knowledge about Co-Generation plant and Vibration analysis.
Project aim:
To ensure availability and reliability of the Propane Compressors in Dew Point Depression plant, ONGC, Hazira, Gujarat, India.
 

Prasanna_D

Star Member
Jun 20, 2014
62
0
Category........
Visa Office......
VFS Chennai
Job Offer........
Pre-Assessed..
App. Filed.......
08-07-2014
File Transfer...
09-07-2014
Med's Done....
27-06-2014
ambujnagchaudhuri said:
CGPA - 7.0/10
Last two sem cgpa - 8.69/10
Final semester GPA -9.75/10

TOEFL ...
R - 27
L - 20
S - 28
w - 27
102
102/120

Experience -
1. Capsutec - Brazil
To analyse and design encapsulating machine parts, gears on Solid Works thus increasing the efficiency of the machine.

2. Essar Power - India {Graduation project}
Suggested ways to increase the efficiency of Gas turbine through failure analysis of gas turbine hydrodynamic journal bearing, by increasing the firing temperature and pressure ratio of combustion chamber in Gas turbine and NOX reduction.
Project aim:
A. To increase the efficiency of the Gas turbine
B. Gas turbine upgradation.

3. Schlumberger - India
Worked in the Drilling and Measurement section. Project aimed at re-designing and increasing efficiency of the vacuum station by removing all air cavities inside the Measurement While Drilling tools. Project was estimated around $ 3000 only with the new design proposed, against the estimated cost of $ 5000.
Project aim:
1. Reducing the time from 3 hours to 0.5 hours to 1 hour maximum.
2. Reducing technician involvement.
3. Improving asset utilization
4. Improving people utilization.
5. Reduce handling.
6. Improve Turn Around Time.
Analysed and designed the walk in box which carries tools and other materials to the oil field site which is used in drilling work.

4. ONGC - India
Worked on the overhauling of Gas Compressor. Gained knowledge about Co-Generation plant and Vibration analysis.
Project aim:
To ensure availability and reliability of the Propane Compressors in Dew Point Depression plant, ONGC, Hazira, Gujarat, India.
you have a very good experience
 

ambujnagchaudhuri

Full Member
Jul 16, 2014
29
0
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2014
File Transfer...
18-06-2014
Med's Done....
10-06-2014
VISA ISSUED...
17/07/2014
Thank you everyone :D
 

ambujnagchaudhuri

Full Member
Jul 16, 2014
29
0
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2014
File Transfer...
18-06-2014
Med's Done....
10-06-2014
VISA ISSUED...
17/07/2014
I applied from VFS Mumbai ..
17th June 2014

Visa approved on 21 July 2014

First I got the email from CIC .. then I saw VFS and it was not updated. I called them and asked to update it. Finally by the afternoon it was updated.
 

lucifer_2510

Hero Member
May 27, 2014
805
13
123
Kolkata
Category........
Visa Office......
Kolkata
Job Offer........
Pre-Assessed..
App. Filed.......
31-07-2014
Doc's Request.
Medical Upfront
IELTS Request
7.5 Bands
File Transfer...
01-08-2014
Med's Request
11-07-2014
Med's Done....
11-07-2014
Interview........
Not required
Passport Req..
31-07-2014
VISA ISSUED...
12-08-2014
LANDED..........
21-08-2014
ambujnagchaudhuri said:
Finally received the email along with the status update on VFS website

Happy ...
congo bud
 

ambujnagchaudhuri

Full Member
Jul 16, 2014
29
0
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
17-06-2014
File Transfer...
18-06-2014
Med's Done....
10-06-2014
VISA ISSUED...
17/07/2014

Nandana93

Full Member
Jul 3, 2014
39
0
Category........
Visa Office......
New Delhi
Job Offer........
Pre-Assessed..
App. Filed.......
08-07-2014
IELTS Request
7 overall
File Transfer...
09-07-2014
Med's Done....
Upfront
Passport Req..
Submitted with documents
VISA ISSUED...
29/07/2014
LANDED..........
18/08/2014