- Aug 13, 2015
- 71
- 1
- Category........
- Visa Office......
- Mexico
- Job Offer........
- Pre-Assessed..
Hi everyone,
I would like to share information about my proccess with other in the same boat: July or afterwards applicants, under the paper based system through Mexico VO. My time line:
App sent to CIC: July 20th
App received CIC: July 26th
AOR: Waiting.
Good luck to everyone.
I would like to share information about my proccess with other in the same boat: July or afterwards applicants, under the paper based system through Mexico VO. My time line:
App sent to CIC: July 20th
App received CIC: July 26th
AOR: Waiting.
Good luck to everyone.