+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
I have a doubt. If eCoPR is getting delayed like this, what would be the date on the eCoPR issued? Would it be the date we declared that we are in Canada and submitted the photo or the date we see the option to download the eCoPR?
 
I have a doubt. If eCoPR is getting delayed like this, what would be the date on the eCoPR issued? Would it be the date we declared that we are in Canada and submitted the photo or the date we see the option to download the eCoPR?
For sure it would need to be when the eCoPR is actually issued.
 
From the website Study and work permit renewal requests, and requests for processing of confirmation of permanent residence at the Peace Bridge, Queenston-Lewiston Bridgeand Rainbow Bridge.
 
Who reside in Canada
 
It shouldn't matter. They would be able to access our photo and declaration online.
 
For work permits, when they issue work permit at the border, they will end the online processing part.