+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
None, I don't know what to do, they don't respond my email, neither my status hasn't changed. I'm still application received. I need to quit my job soon. :/
 
Axmcol18 said:
None, I don't know what to do, they don't respond my email, neither my status hasn't changed. I'm still application received. I need to quit my job soon. :/

Hey Axmcol18,

When they asked you for PCC and new schedule A, did you also courier a new original Schedule A? Or did you just fax and email a scanned copy?
I am asking this because I was asked for PCC and Schedule A too, but they put my application to IP after they got my courier containing the new original signed Schedule A, and not after the fax.
 
I just faxed it. Do you think I should mail it then?? Btw I don't have a new PCC because the original was sent already.
 
Rb2013 said:
Hey Axmcol18,

When they asked you for PCC and new schedule A, did you also courier a new original Schedule A? Or did you just fax and email a scanned copy?
I am asking this because I was asked for PCC and Schedule A too, but they put my application to IP after they got my courier containing the new original signed Schedule A, and not after the fax.

Hi Rb2013,

Did they put your application in process the next day after they have received your new original schedule A?
 
Axmcol18 said:
I just faxed it. Do you think I should mail it then?? Btw I don't have a new PCC because the original was sent already.

I would think that they require an original schedule A, as they say in the additional docs email (bearing an original signature). Even i didn't have my Original PCC as it was sent already. So I just wrote a letter explaining the same, attached the original new schedule A, and a photocopy of PCC. I am not sure if it would work, but its sure worth trying.
 
Freckle said:
Hi Rb2013,

Did they put your application in process the next day after they have received your new original schedule A?

Hey Freckle,

They received my fax on 9th and my courier on 11th at 8 Am. My application started processing July 11th.
 
Rb2013 said:
I would think that they require an original schedule A, as they say in the additional docs email (bearing an original signature). Even i didn't have my Original PCC as it was sent already. So I just wrote a letter explaining the same, attached the original new schedule A, and a photocopy of PCC. I am not sure if it would work, but its sure worth trying.

Thanks, I'm on my way to the post office lol.. Btw I even don't have a copy of my PCC, but I have the tracking number from the day I sent it. I'll write down a letter explaining everything. Thanks for your help.
 
Axmcol18 said:
Thanks, I'm on my way to the post office lol.. Btw I even don't have a copy of my PCC, but I have the tracking number from the day I sent it. I'll write down a letter explaining everything. Thanks for your help.

Yeah, that should work. Hope it gets sorted out for you, Good luck! :)
 
Rb2013 said:
Yeah, that should work. Hope it gets sorted out for you, Good luck! :)

Thank you, and thanks for the advice. I'll keep you updated, it should be delivered by Friday.
 
Snoopy09 said:
Woooot woooot!!! Got IP.. App received Dec 19.. They started processing our file July 14....

wow congrats snoopy i guess i am next lol as u were 19th mine is 20th lol praise the lord :-)