hello
i have applied my closed work permit on the basis of pnp nomination . it was applied on 30 oct 2018 through a representative. what would be the processng time? does it genreally get processed within 67 days time frame considering i have letter of support from alberta or it takes 6 to 7 months /
i have applied my closed work permit on the basis of pnp nomination . it was applied on 30 oct 2018 through a representative. what would be the processng time? does it genreally get processed within 67 days time frame considering i have letter of support from alberta or it takes 6 to 7 months /