- Aug 21, 2022
- 0
- Category........
- FSW
- NOC Code......
- 2241
- App. Filed.......
- 08-01-2023
- AOR Received.
- 08-01-2023
Hi guys,
I understand (if I'm not mistaken) that everything in the e-APR form must have a green "Complete" sign first, before the "continue" button shows up and the document checklist is generated.
Some sections in the form are fully filled up but they still have the orange color "In progress" sign. Please take a look at the picture at: https://drive.google.com/file/d/1d0STuC39WorRm3lU_vT18qqmRslrMrv1/view
Any advice on what to do about this? I filled up everything in "Personal history" and also "Personal details" sections in the e-APR form, but they both still have the orange color "In progress" sign and I can't get the document checklist.
I understand (if I'm not mistaken) that everything in the e-APR form must have a green "Complete" sign first, before the "continue" button shows up and the document checklist is generated.
Some sections in the form are fully filled up but they still have the orange color "In progress" sign. Please take a look at the picture at: https://drive.google.com/file/d/1d0STuC39WorRm3lU_vT18qqmRslrMrv1/view
Any advice on what to do about this? I filled up everything in "Personal history" and also "Personal details" sections in the e-APR form, but they both still have the orange color "In progress" sign and I can't get the document checklist.