+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Re: NOC 2132 - This may be good news for us.......

iam soory Guys...

Ahmed it's 2232 and not 2242.. Please correct
 
Re: NOC 2132 - This may be good news for us.......

Yea, i already made a new experience letter with the requirement of 2232, and u know what? i found out that my name was written wrong in the IELTS certificate which i sent under 2132. So anyway i have to submit another application, but this time i will go for 2232
 
Re: NOC 2132 - This may be good news for us.......

Hello

Could you please help me with my NOC Duties.(Is is matching with 2132 or 2232)
Here are my JD.
• Created 3D CAD models and detailed drawings with application of Geometric Dimensions and Tolerances (GD&T) of Machines/Equipment.
• Developed concepts, specifications, costs, and schedules based upon sound engineering principles with input from customers and technical resources.
• Created project documentation including Bills of Material, spare parts lists, operation and maintenance manuals, assembly procedures and check sheets, repair procedures, management reports, and project schedules
• Designed machining Jigs and fixtures, assembly tooling and automatic machinery/systems
• Designed and Developed manufacturing process and assembly methods
• Managed Machinery/Equipment Install and maintenance
• Responsible for the complete equipment and tooling requirements, including costs estimates, and contract documents.
• Developed new ideas to reduce design and parts costs, increase overall efficiency
• Performed engineering calculations to determine cycle time, performance, strength of Machine/Equipment
• Developed and implemented Standards, procedures, methodologies & best practice

Thanks
 
Re: NOC 2132 - This may be good news for us.......

Currently which files are under review for NOC 2132
 
Re: NOC 2132 - This may be good news for us.......

You estimation seems reasonable, good luck to all MECHANICAL ENGINEERS :D
 
Re: NOC 2132 - This may be good news for us.......

prince323 said:
Hello

Could you please help me with my NOC Duties.(Is is matching with 2132 or 2232)
Here are my JD.
• Created 3D CAD models and detailed drawings with application of Geometric Dimensions and Tolerances (GD&T) of Machines/Equipment.
• Developed concepts, specifications, costs, and schedules based upon sound engineering principles with input from customers and technical resources.
• Created project documentation including Bills of Material, spare parts lists, operation and maintenance manuals, assembly procedures and check sheets, repair procedures, management reports, and project schedules
• Designed machining Jigs and fixtures, assembly tooling and automatic machinery/systems
• Designed and Developed manufacturing process and assembly methods
• Managed Machinery/Equipment Install and maintenance
• Responsible for the complete equipment and tooling requirements, including costs estimates, and contract documents.
• Developed new ideas to reduce design and parts costs, increase overall efficiency
• Performed engineering calculations to determine cycle time, performance, strength of Machine/Equipment
• Developed and implemented Standards, procedures, methodologies & best practice

Thanks

U really perform all these duties?....amazing
 
Re: NOC 2132 - This may be good news for us.......

I'm gonna deliver my package this week.

Still got chance?
 
Re: NOC 2132 - This may be good news for us.......

funkki said:
I'm gonna deliver my package this week.

Still got chance?

NOC 2132 is close to being filled, but you won't gain much by not sending it, it's worth a try. Get original copies of everything to file under express entry just incase. Good luck.
 
Re: NOC 2132 - This may be good news for us.......

Hi!!

I got my PER last Dec.15... Sept 24 Applicant.
NOC 2132.. CC got charged last Dec.04.

To God be the glory!!

It's raining PER this week!!
 
Re: NOC 2132 - This may be good news for us.......

Based on the website the cap is now at 624. Only 376 remaining!

My application received on 20 Oct. Actually this is my second attempt after my June application got returned due to incompleteness. Fingers cross on a good outcome before year end!
 
Re: NOC 2132 - This may be good news for us.......

justg20 said:
Based on the website the cap is now at 624. Only 376 remaining!

My application received on 20 Oct. Actually this is my second attempt after my June application got returned due to incompleteness. Fingers cross on a good outcome before year end!

what is the reason of rejection
 
Re: NOC 2132 - This may be good news for us.......

FIYAZALI said:
what is the reason of rejection
I forgot to attach my degree copies to the ECA assessment. Basically it was not reviewed and the packaged sent back.
 
Re: NOC 2132 - This may be good news for us.......

Guys CIC update total received 700 and waiting for review 207. We are all in thanks god
 
Re: NOC 2132 - This may be good news for us.......

93 more available slots and NOC 2132 will be capped...
 
Re: NOC 2132 - This may be good news for us.......

CIO has new update.
I think this is good news for those whose CC/DD were already charged. Atleast they know now that there are many pending applications awaiting for PER.

On the contrary, this is bad news for others without CC/DD charges, only few seats remaining though.