Now that most test spots for IELTS and CELPIP have been taken until August, what will happen to people looking forward to applying for CEC during summer? Those who don't have their tests yet will either have to travel to take them or wait until they can take them to enter the EE pool.
I assume that at least a solid 50% of the applicants for these streams don't meet the requirements for CEC, otherwise, with the current cutoff scores, they'd have already applied or should be ready to apply soon. If the current CEC draws continue taking in 5000 people, the cutoff score will end up going to the high 300's range.