Hi
My two children coming on minor study visa with a parent who need work permit . I applied on 25 th July and today is september 24 any idea how long it take from Pakistan
My two children coming on minor study visa with a parent who need work permit . I applied on 25 th July and today is september 24 any idea how long it take from Pakistan