- Aug 13, 2012
- 1
- Category........
- Visa Office......
- Vegreville
- Job Offer........
- Pre-Assessed..
- App. Filed.......
- 08-08-13
- AOR Received.
- 08-09-13
- Med's Done....
- 10-05-13
Hello everyone,
I will be sponsoring my wife via the inland method shortly for PR. She currently is working in Canada on a closed work permit which expires end of 2014. She is from Indonesia, so the processing time is close to 20 months.
I understand that it's possible to receive an open work permit after the first stage of the PR process. One of my questions is, is it possible to receive an open work permit while she already has a closed work permit currently? How long is the open work permit valid for?
What happens if the PR process takes longer than her current work permit allows (which is until the end of 2014)?
Basically, we want to make sure that she can continue working as long as the PR process is taking place instead of switching her status to a visitor.
Thanks!
I will be sponsoring my wife via the inland method shortly for PR. She currently is working in Canada on a closed work permit which expires end of 2014. She is from Indonesia, so the processing time is close to 20 months.
I understand that it's possible to receive an open work permit after the first stage of the PR process. One of my questions is, is it possible to receive an open work permit while she already has a closed work permit currently? How long is the open work permit valid for?
What happens if the PR process takes longer than her current work permit allows (which is until the end of 2014)?
Basically, we want to make sure that she can continue working as long as the PR process is taking place instead of switching her status to a visitor.
Thanks!