I'm trying to fill out the IMM5709 form and I'm unsure about what to fill for "Duration of Expected Study".
My situation:

- My visa and Study Permit expire on 02/23/19
- My school will finish on 03/24/19 and graduation day is 04/24/19

What should "From" and "To" be filled with? Would "From" be 02/23/19 (the end of my current study permit) and end be the final graduation day? 04/24/19?

Looking online I saw a couple of places where they're saying to put "From" as today's date and "To" the final date of studies + 3 months.
https://students.ubc.ca/international-student-guide/immigration/study-permits/extend-study-permit/tutorial-extend-study-permit-within-canada-application-form
https://international.humber.ca/assets/files/pdf/Study permit_December 2015.pdf
So in this case would be: "From" today "To" 06/24/19 (starting from end of study) or 07/24/19 (starting from graduation day)?
 

bongoman

VIP Member
Dec 3, 2014
4,174
812
From is the day you are applying, To should be day you finish studies + 90 days, which should be enough time to apply for any further permits after receiving graduation notice.
 

nazgul86

Hero Member
Jul 31, 2018
257
116
Thanks for confirming, so do you think in this case "To" should be 06/24/19 (3 months after end of study) or 07/24/19 (3 months after graduation day)?
 

Anchitsethi18

Member
Oct 26, 2019
11
3
Hey guys, I am having similar trouble filling in the date of duration of expected study. I have completed 2 years in my current university and I am transferring to Canada for my half of year 3 and full 4th year, so I will be technically done with my studies by April 2021, but my acceptance letter says Winter 2020-2024. What year do I put? The one on the document, 2024 or my actual graduation date + 90 days which will be July 2021?
 

vamish14

Star Member
Dec 30, 2020
61
29
The passport of my son is getting expired on 18th May 2021 and i need to apply for the bridging open work permit, what should be the "Duration of Expected Study" I enter, any suggestion please. should I get his passport renew and then apply for my bridging open work permit and his study permit along with my application.
 

bongoman

VIP Member
Dec 3, 2014
4,174
812
Duration of expected study is just simply when studies are expected to end according to the program you are attending, its normal to add 90 days or IRCC even adds 90 days sometimes but this 90 days thing is not always a given, nothing to do with your passport.

Any permit you get from Canada will not be valid longer than your passport validity and if so you will have to extend it later before it expires to continue studying.
 

arvind92

Star Member
Jan 3, 2021
158
54
Duration of expected study is just simply when studies are expected to end according to the program you are attending, its normal to add 90 days or IRCC even adds 90 days sometimes but this 90 days thing is not always a given, nothing to do with your passport.

Any permit you get from Canada will not be valid longer than your passport validity and if so you will have to extend it later before it expires to continue studying.
Thanks for the reply.

My program is going to end in September 2024. I dont have a month.
What should i select as the end date of my 'Duration of expected Study'

Can I write it as 30th September 2024?Or should i write it as December 2024.