pls. check some of the timeline below, these are actual timeline of applicant from philippines...
Applicant #1
Destination...vancouver
July `07...submitted application to Manila Canadian Embassy (MCE)
Aug.`07... AOR received
July 22`08...rcvd speaktest
Aug.8...speaktest done
Aug.19...rcvd med`l referral
Sept.6...medical done @ nationwide
Sept.15...medical result forwarded to MCE
Oct.8, 2008...VISA GRANTED!!!
Applicant#2
Mechanic-NOC-B-7312
DESTINATION- Ontario
May 05, 2008-Received E-LMO
May 12, 2008-Contract signed
May 30, 2008-Docs submitted to MCE
June 23, 2008-AOR/Med Referral
June 27, 2008-Med done
July 04, 2008-Med. forwarded to MCE
July 24, 2008-Canspeak Test
Aug. 13, 2008-VISA GRANTED!!!
plus after LMO, before sending to applicant in phils. you need to have the job contract and LMO authenticated by POLO Canada. These are requirements for POEA in Manila.
hope these helps...