hi i have just received a mail for the request of schedule a pcc .. which is dated march 9 nd i received today .. i linked my application on march 10 and since then no email or no update to that mycic account .. i submitted the ircc webform ..but now in this letter it says if um submitting the document through ircc i need to sign it by hand and then upload but i uploaded it by typing it in the sign sec.. so should i go ahead and mail them the documents or .. upload through webform again .. can anyone give me the proper way to upload the form through ircc web form .. or if we choose to mail which address should we mail that .. i need to submit by april 16th .. um really upsaet over their system .. please advise me ..