+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Its going to be nearly 6 months since my test is done. Timeline in my signature. I got my notes and it shows that LPP has been alloted to RC-8090. I didnt know much about RC-8090 till I did a search and here I am... part of the slow train. No movement since my test in March!
 
  • Like
Reactions: Keyjoe23
Its going to be nearly 6 months since my test is done. Timeline in my signature. I got my notes and it shows that LPP has been alloted to RC-8090. I didnt know much about RC-8090 till I did a search and here I am... part of the slow train. No movement since my test in March!
Been almost 6 months since the test for us too, read somewhere that paper files stay with the infamous Sydney office until LPP is complete, then transfered to your local office. But even online applicants can be assigned to Sydney for LPP to complete.
Hope they all start acting fairly and get back to working on the older files this time.
 
  • Like
Reactions: johnsyk
Can someone please help me decipher this better from my notes? Mine Says the following:

PAPER FILE
Office: Hamilton IRCC
#: CXXXX (my application number)
Location: Grant Review Ready PM03

Application Assignment
Due Date:
Assigned By:
Assigned To:

However when I go to each of the LPP segments, its assigned to RC-8090 (which is the Sydney Office code).

Triage is empty.

1 - Are my next steps done at RC-8090 or Hamilton?
2 - Does the application assignment section being empty mean anything?
3 - Grand Review Ready PM03 means it will be delayed since it needs additional review?
4 - Due Date for LPP has been set for January 2024.

You can see my signature, it is stuck for 6 months after my Test. Everything else sees normal.
 
Citizenship Timeline
  • Type: Online
  • Submission date: 29 January 2022
  • Physical Presence: 11XX
  • AOR: 11 March 2022
  • In progress: 14 March 2022
  • Ghost update: 22 September 2022
  • Ghost update: 23 September 2022
  • ATIP1 Requested (IRCC, Access to Information Act): 28 September 2022
  • Test Invite: 30 September 2022 (Window 07 Oct to 27 Oct)
  • FP Request: 05 October 2022
  • Test Taken: 09 October 2022 (outside of Canada)
  • Test Completed: 12 October 2022
  • FP Submitted to RCMP: 12 October 2022 (outside of Canada)
  • FP Sent to IRCC: 20 October 2022
  • FP Received: 24 October 2022
  • BG Verification Completed: 26 October 2022
  • ATIP2 Requested (CBSA, Privacy Act): 14 December 2022
  • ATIP1 Received (IRCC, Access to Information Act): 15 December 2022
  • Ghost update: 17 December 2022
  • ATIP2 Received (CBSA, Privacy Act): 09 January 2023
  • Ghost update: 03 March 2023
-----------------------------------------------------------------------------
  • Language Skills: In progress
  • Prohibitions: In progress
  • Physical Presence: In progress
  • Citizenship Ceremony: Not started
Hey
You got any update
 
Can someone please help me decipher this better from my notes? Mine Says the following:

PAPER FILE
Office: Hamilton IRCC
#: CXXXX (my application number)
Location: Grant Review Ready PM03

Application Assignment
Due Date:
Assigned By:
Assigned To:

However when I go to each of the LPP segments, its assigned to RC-8090 (which is the Sydney Office code).

Triage is empty.

1 - Are my next steps done at RC-8090 or Hamilton?
2 - Does the application assignment section being empty mean anything?
3 - Grand Review Ready PM03 means it will be delayed since it needs additional review?
4 - Due Date for LPP has been set for January 2024.

You can see my signature, it is stuck for 6 months after my Test. Everything else sees normal.
I have the same thing Scarborough office
 
I have the same thing Scarborough office
Rc 8090 is the slowest office it will take time once some on go into rc8090 it take long time to get the application done I'm been waiting almost 2 yers office scarborough but the application send to rc8090
 
Rc 8090 is the slowest office it will take time once some on go into rc8090 it take long time to get the application done I'm been waiting almost 2 yers office scarborough but the application send to rc8090
Yes, it's the slowest office