+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445

<<<<<FSW Outland - April & May 2017 AOR - Lets Connect Here>>>>>

vishalphonsa

Hero Member
Apr 25, 2016
228
250
Pune, India
NOC Code......
0125
App. Filed.......
14-05-2017
AOR Received.
14-05-2017
IELTS Request
20-02-2016
Med's Request
02-05-2017
Med's Done....
28-06-2017
Passport Req..
10-08-2017
VISA ISSUED...
25-08-2017
Received this from CPC-OTTAWA .. Does that mean PPR is on it's way soon????

Dear Sir,



Please be advised that your application has been approved and is being processed as per our regulatory timeline at our office.



Please note that we do not require any information from you at the present time. You will be receiving instructions shortly. Regrettably, we are unable to provide you with a timeframe, but rest assured we are doing what we can to process your application in a timely fashion.



We appreciate your patience and ask that you keep correspondence with our office to a minimum.
Congratulations!! Yes PPR on the way but not sure on the time it'll take. I'm on the same state from a week, but let's be happy that the application has been approved :)
 
  • Like
Reactions: sam_15

wan11knu

Hero Member
Jan 27, 2017
397
156
Mumbai
Category........
FSW
Visa Office......
New Delhi
IELTS Request
Upfront
Med's Done....
Upfront
Guys, I got my GCMS notes and I got lucky that even though the notes were applied for on 1st July, they generated it only on 24th July so I got information which is just 10 days old.

My application was untouched from 10th April to June 12th when I passed medical. Those days it was taking 60 days to pass medical. At the same time, they did my R10 too which I passed. So on 13th, when I moved to NA, it is in sync with what's happening behind the scenes. I noticed that that put something called due date. My due date was 19th July. So from June 12th to 19th July, my application gathered dust.

On 19th July, they did an A11.2 eligibility test which I passed. Then on 20th July, they did a load distribution transfer to London VO and now London is my primary Vo. London has now toggled it back to eligibility not started. Looks like they want to do it again which I see is a normal practice based on what I see on the forum.

So as of now, only criminal and medical passed. Eligibility not done ( though cio did it and passed me) and security not done. The next due date is August 20th so safe to say it will be gathering dust till August 20th! So that's that! It's a slow long ride but atleast, there is nothing negative except they are taking their own sweet time!

One small cause of worry and a potential warning to folks. Both my calls to cic are recorded. My second call was tagged a Tier 2 call. I hope it's not indirectly saying, this guys impatience is irritating us! :eek:
Hi @johnsyk . Is the first eligibility check coinciding with the day your status went to "we do not need additional docs". Coz even i had this ADR change but my gcms notes were generated a day before the change.

Also my gcms notes also recorded the email i sent to Ottawa for VO:eek:
 

vishalphonsa

Hero Member
Apr 25, 2016
228
250
Pune, India
NOC Code......
0125
App. Filed.......
14-05-2017
AOR Received.
14-05-2017
IELTS Request
20-02-2016
Med's Request
02-05-2017
Med's Done....
28-06-2017
Passport Req..
10-08-2017
VISA ISSUED...
25-08-2017
Am i the onlyone waiting in ip2 now? Everyone having similar timeline got ppr already in this forum :(
Sam, don't worry so much. Be a bit hopeful at times, for a change. I'm here on IP2 with no PPR and I know a few folks have the same status. Just relax mate.
 
  • Like
Reactions: sam_15

vishalphonsa

Hero Member
Apr 25, 2016
228
250
Pune, India
NOC Code......
0125
App. Filed.......
14-05-2017
AOR Received.
14-05-2017
IELTS Request
20-02-2016
Med's Request
02-05-2017
Med's Done....
28-06-2017
Passport Req..
10-08-2017
VISA ISSUED...
25-08-2017
Guys, I got my GCMS notes and I got lucky that even though the notes were applied for on 1st July, they generated it only on 24th July so I got information which is just 10 days old.

My application was untouched from 10th April to June 12th when I passed medical. Those days it was taking 60 days to pass medical. At the same time, they did my R10 too which I passed. So on 13th, when I moved to NA, it is in sync with what's happening behind the scenes. I noticed that that put something called due date. My due date was 19th July. So from June 12th to 19th July, my application gathered dust.

On 19th July, they did an A11.2 eligibility test which I passed. Then on 20th July, they did a load distribution transfer to London VO and now London is my primary Vo. London has now toggled it back to eligibility not started. Looks like they want to do it again which I see is a normal practice based on what I see on the forum.

So as of now, only criminal and medical passed. Eligibility not done ( though cio did it and passed me) and security not done. The next due date is August 20th so safe to say it will be gathering dust till August 20th! So that's that! It's a slow long ride but atleast, there is nothing negative except they are taking their own sweet time!

One small cause of worry and a potential warning to folks. Both my calls to cic are recorded. My second call was tagged a Tier 2 call. I hope it's not indirectly saying, this guys impatience is irritating us! :eek:
Captain, thanks for the update. Atleast there's some clarity on what's happening. Looks like the guys are unpredictable.
 
  • Like
Reactions: johnsyk

johnsyk

Champion Member
Sep 24, 2016
1,190
934
NOC Code......
1121
App. Filed.......
10-4-2017
AOR Received.
10-4-2017
IELTS Request
Upfront
Med's Request
Upfront
Med's Done....
8-4-2017
Hi @johnsyk . Is the first eligibility check coinciding with the day your status went to "we do not need additional docs". Coz even i had this ADR change but my gcms notes were generated a day before the change.

Also my gcms notes also recorded the email i sent to Ottawa for VO:eek:
No, the first eligibility check matched with the date they had put as due date. The next due date at London office is put as August 20th! So if I'm really lucky, they might do eligibility on 20th August and put me on IP2 and give PPR on that day or a few days later.... I hope! Who knows!
 

johnsyk

Champion Member
Sep 24, 2016
1,190
934
NOC Code......
1121
App. Filed.......
10-4-2017
AOR Received.
10-4-2017
IELTS Request
Upfront
Med's Request
Upfront
Med's Done....
8-4-2017
Any idea if they have parameters for load distribution transfer or are these things random? e.g. those with NOC xxxx here, while yyyy there? or maybe those from country/continent xxxx here while continent/country yyyy there? Just curious.
Also curious about the multiple deadlines--- how'd they determine those?
Nope. No parameters or anything like that was given. On their due date, they checked eligibility at CIO and shipped me to London. I think it's based on country of residence since many UAE applications do go to London.
 

Pawshi

Hero Member
Apr 2, 2016
704
156
New Delhi
Category........
Visa Office......
New Delhi
NOC Code......
0111
Job Offer........
Pre-Assessed..
App. Filed.......
April 2016
It looks....IP2 to PPR correlation is just a myth. Yes, it is penultimate stage (majorly) to PPR. But, those days are over, when some used to say that IP2 to PPR is few hours to few days.

There are significant numbers who are more than 10+ days and waiting for PPR. There are many, who are 15+ and waiting for PPR. It is totally unpredictable at this moment.
 

wan11knu

Hero Member
Jan 27, 2017
397
156
Mumbai
Category........
FSW
Visa Office......
New Delhi
IELTS Request
Upfront
Med's Done....
Upfront
No, the first eligibility check matched with the date they had put as due date. The next due date at London office is put as August 20th! So if I'm really lucky, they might do eligibility on 20th August and put me on IP2 and give PPR on that day or a few days later.... I hope! Who knows!
Ok. Could you tell me under what header/sub header is this due date showing?
 

johnsyk

Champion Member
Sep 24, 2016
1,190
934
NOC Code......
1121
App. Filed.......
10-4-2017
AOR Received.
10-4-2017
IELTS Request
Upfront
Med's Request
Upfront
Med's Done....
8-4-2017
The latest due date comes on page 2 under application accessment. The previous due dates came under different headings. For example, info sharing with US had a due date of 12th July. And other due dates are peppered around the place in historical activities. I have to go back and read the old dates since the whole notes thing is around 100 pages.
 

sunilwadhwa19

Star Member
Jul 5, 2017
131
121
Received this from CPC-OTTAWA .. Does that mean PPR is on it's way soon????

Dear Sir,



Please be advised that your application has been approved and is being processed as per our regulatory timeline at our office.



Please note that we do not require any information from you at the present time. You will be receiving instructions shortly. Regrettably, we are unable to provide you with a timeframe, but rest assured we are doing what we can to process your application in a timely fashion.



We appreciate your patience and ask that you keep correspondence with our office to a minimum.
Congratulations !!! my time lines are exactly the same.. this gives me a lot of hope !! cheers !!
 
  • Like
Reactions: sam_15

vishalphonsa

Hero Member
Apr 25, 2016
228
250
Pune, India
NOC Code......
0125
App. Filed.......
14-05-2017
AOR Received.
14-05-2017
IELTS Request
20-02-2016
Med's Request
02-05-2017
Med's Done....
28-06-2017
Passport Req..
10-08-2017
VISA ISSUED...
25-08-2017
Guys, I got my GCMS notes and I got lucky that even though the notes were applied for on 1st July, they generated it only on 24th July so I got information which is just 10 days old.

My application was untouched from 10th April to June 12th when I passed medical. Those days it was taking 60 days to pass medical. At the same time, they did my R10 too which I passed. So on 13th, when I moved to NA, it is in sync with what's happening behind the scenes. I noticed that that put something called due date. My due date was 19th July. So from June 12th to 19th July, my application gathered dust.

On 19th July, they did an A11.2 eligibility test which I passed. Then on 20th July, they did a load distribution transfer to London VO and now London is my primary Vo. London has now toggled it back to eligibility not started. Looks like they want to do it again which I see is a normal practice based on what I see on the forum.

So as of now, only criminal and medical passed. Eligibility not done ( though cio did it and passed me) and security not done. The next due date is August 20th so safe to say it will be gathering dust till August 20th! So that's that! It's a slow long ride but atleast, there is nothing negative except they are taking their own sweet time!

One small cause of worry and a potential warning to folks. Both my calls to cic are recorded. My second call was tagged a Tier 2 call. I hope it's not indirectly saying, this guys impatience is irritating us! :eek:
Tier 2 may not be an issue. Normally (eg in call centres) higher Tier means that the call has been routed/handled by a higher level of expert. So if Tier 1 can't answer or handle the specific query the call is passed on to a resource with a higher level of expertise. Unless CIC isn't using the industry specific norm of call centres, this shouldn't be an issue.
 

johnsyk

Champion Member
Sep 24, 2016
1,190
934
NOC Code......
1121
App. Filed.......
10-4-2017
AOR Received.
10-4-2017
IELTS Request
Upfront
Med's Request
Upfront
Med's Done....
8-4-2017
Tier 2 may not be an issue. Normally (eg in call centres) higher Tier means that the call has been routed/handled by a higher level of expert. So if Tier 1 can't answer or handle the specific query the call is passed on to a resource with a higher level of expertise. Unless CIC isn't using the industry specific norm of call centres, this shouldn't be an issue.
Ok cool