+1(514) 937-9445 or Toll-free (Canada & US) +1 (888) 947-9445
Status
Not open for further replies.
farhaantariq said:
there are like 64 applicants in spreadsheet for 8th may.........ya Allah plz give atleast that much speed to cio that they start processing these 8th may poor souls (including me)....plz plz plz let us hear good news.......this wait is getting into revenge feelings!

Very true... 7th app is taking way too long to complete... CIC, accept all 7th and move on to 8th and so on.... 8) 8)
In fact accept all quickly :-* :-*
 
katoch_sunny said:
Today is the 30th day since my WES Evaluation has been completed and sent by Standard Mail but still I haven't got my WES Report!!!!
What has happened to India post?????????????

You have to have select express courier service. And standard mail from Canadian government not from Indian post. So no need to blame indian post. Standard mail takes 15 days minimum. if anything earlier you get then you should be lucky.
 
Well dude....standard mail is the most slowest mail in the world that is sent my wes.....it took 37 days for me to arrive...with the quotas filling fast, you can order a duplicate report and take the courier option which took only 6 days for me including the ordering day...
varuen said:
You have to have select express courier service. And standard mail from Canadian government not from Indian post. So no need to blame indian post. Standard mail takes 15 days minimum. if anything earlier you get then you should be lucky.
 
Hey ANkit,

Even my package is on the same boat as yours
- 6/27/2014 - Friday
8:48 am At destination sort facility GOFFS, NS
8:14 am In transit DIEPPE, NB
4:52 am In transit MISSISSAUGA, ON

I have just called to fedex customer care, they say it will be delivered on Monday :(

ankit1987 said:
Any idea will it reach today only(on friday)? FEDEX

6/27/2014 - Friday
8:48 am
At destination sort facility: GOFFS, NS

8:14 am
In transit: DIEPPE, NB

4:52 am: In transit: MISSISSAUGA, ON
 
need opinion from those who have applied for noc 2132 (mechanical engineer ) category.Can any of you tell me if my duties are relevant for this noc.i am a mechanical engineer and working as inspection engineer in a company.i am posting both type of duties that are given as a sample and my actual duties that i perform .i know it will take your few precious minutes and i am thankful for that.

Mechanical engineers perform some or all of the following duties:
• Conduct research into the feasibility, design, operation and performance of mechanisms, components and systems
• Plan and manage projects, and prepare material, cost and timing estimates, reports and design specifications for machinery and systems
• Design power plants, machines, components, tools, fixtures and equipment
• Analyze dynamics and vibrations of mechanical systems and structures
• Supervise and inspect the installation, modification and commissioning of mechanical systems at construction sites or in industrial facilities
• Develop maintenance standards, schedules and programs and provide guidance to industrial maintenance crews
• Investigate mechanical failures or unexpected maintenance problems
• Prepare contract documents and evaluate tenders for industrial construction or maintenance
• Supervise technicians, technologists and other engineers and review and approve designs, calculations and cost estimates.

My duties are:
• Preparation of bids/proposals, tenders, contract documents and their addition on PBT (Piping & backlog tool) on regular basis for industrial activities.
• Evaluation of projects and inspection plans, monitoring inspectors, supervisors and site staff engineers for QA/QC maintenance issues.
• Preparation of project instructions for site staff and supervisors, collection of data and technical report writing for clients as per project specifications.
• Scheduling and monitoring of mechanical equipment inspection at different sites and resolving maintenance problems.
• Coordination with international offices for procurement & expediting issues, including shop fabrication inspections.
• Analysing project cost and feasibility reports for optimization of maintenance issues.
• Ensuring implementation of quality control procedure and recruiting technical staff according to job requirements.
 
Congrats farhaantariq i am also on the same boat. Feeling very nervous. 51 days completed for 8th MAy applicants.... :( :( :(.

Pray God strongly boss from next week it should start for sure as from tomorrow ramzan starts..........
 
Achiever 99 said:
Very true... 7th app is taking way too long to complete... CIC, accept all 7th and move on to 8th and so on.... 8) 8)
In fact accept all quickly :-* :-*

Sumhw I hv deja vu that CIC will finish up the 7/8 apps today and begin with the nxt ones nxt week ...

I can only wish that they finish the May month apps by this evening ... :D 8-> 8-> 8->
 
Hi,

Can anyone tell me how u know who signed r application like people mentioned mike etc.
 
migrator2014 said:
Somehoe I hv deja vu that CIC will finish up the 7/8 apps today and begin with the nxt ones net week ...

I can only wish that they finish the May month apps by this evening ... :D 8-> 8-> 8->

If it happens then it is Jamais vu bro..... :D :D :D
 
ranjit7727 said:
Hi,

Can anyone tell me how u know who signed r application like people mentioned mike etc.

from COurier Tracking details...
 
nb_84 said:
Can any one tell me If its NER, will get back money that cc charged?

I dont think they would charge for a NER...
 
nb_84 said:
Can any one tell me If its NER, will get back money that cc charged?

Nope!!!.. CIC staff parties hard on the money that is nt be used newhr ... ;D ;D ;D ... just kidding ... I think you get that back if NER happens in the very first couple of processing steps ... Perhaps somebody more experienced will hv more to say ...
 
Status
Not open for further replies.