@vhp111, Pls what is your NOC and application received date. I am Nov 06 applicant, still waiting for my PER. Thanksvhp111 said:Merry X-mas to all
Today received my PER mail from cic.
Admin pls update this-DD charged on 13-12-13
@vhp111, Pls what is your NOC and application received date. I am Nov 06 applicant, still waiting for my PER. Thanksvhp111 said:Merry X-mas to all
Today received my PER mail from cic.
Admin pls update this-DD charged on 13-12-13
Hi Vats,Vats said:Dear NOC 2132 have reached CAP in the month of Sept it self.
Do i still have chance for noc 3211,i just sent my app last december 20?thank youaami786pk said:Cap updated
1112 Financial and investment analysts 300 (Cap reached) Footnote 2
2113 Geoscientists and oceanographers 51
2131 Civil engineers 300 (Cap reached) Footnote 2
2132 Mechanical engineers 300 (Cap reached) Footnote 2
2134 Chemical engineers 154
2143 Mining engineers 8
2145 Petroleum engineers 4
2144 Geological engineers 79
2146 Aerospace engineers 22
2147 Computer engineers (except software engineers/designers) 300 (Cap reached) Footnote 2
2154 Land surveyors 20
2174 Computer programmers and interactive media developers 300 (Cap reached) Footnote 2
2243 Industrial instrument technicians and mechanics 81
2263 Inspectors in public and environmental health and occupational health and safety 205
3141 Audiologists and speech-language pathologists 15
3142 Physiotherapists 300 (Cap reached) Footnote 2
3143 Occupational Therapists 41
3211 Medical laboratory technologists 247
3212 Medical laboratory technicians and pathologists' assistants 85
3214 Respiratory therapists, clinical perfusionists and cardiopulmonary technologists 22
3215 Medical Radiation Technologists 53
3216 Medical Sonographers 36
3217 Cardiology technologists and electrophysiological diagnostic technologists
Kalaideng said:@ GJG this is a global forum mate... what you posted is not cool !! don't get carried away...
Hi,ajdelsocorro said:Do i still have chance for noc 3211,i just sent my app last december 20?thank you
GJG said:Agreed and deleted ...
With due respect and apologies!
sharmausct said:Hi.I have received MR,PCC,RPRF and passport request mail and last date of submission is 09 feb 2014 for all of these.my wife is pregnant and due date is in June.
Now i have 4 options and queries regarding each option
Option 1:
Inform online about my wife pregnancy on Case Specific Enquiry – New Delhi(https://dmp-portal.cic.gc.ca/enquiries-renseignements/case-cas-eng.aspx?mission=new%20delhi) and also send hard copy to NDVO( Immigration Section,High Commission of Canada,7/8 Shantipath, Chanakyapuri)and ask them for formal extension for medicals and submission of passport till June 2014 and send PCC and RPRF draft to NDVO now.
Query for option1:
We will be crossing the last date of submission for passport(9 Feb 2014) and completion of medicals. So i will have to ask NDVO for extension of passport submission date and medical completion date.I don't know they will reply me before 9 Feb.
Option2:
DO all Medical tests for me, my son and wife except her X-Ray(which will happen in June) and send PCC, RPRF draft,Medical receipts and passports altogether now
Query for option2:
In this case our passport will be blocked with NDVO till june as NDVO will not issue visa till the completion of medical x ray. Also as the our passport will be with NDVO so we will not be able to make the pasport of our new born child as you nedd parent passport for that.
option 3:
DO all Medical tests for me, my son and wife except her X-Ray(which will happen in June) and send PCC, RPRF draft,Medical receipts except passports now and send passport in June 2014
Query for option 3:
We will be crossing the last date of submission for passport(9 Feb 2014). So i will have to ask NDVO for extension of passport submission date.I don't know they will reply me before 9 Feb.
Option 4:
DO all Medical tests including x-ray using led shield.and send PCC,RPRF draft,medical reciepts and passports now
Query for option 4:
every thing regarding PR will be fine in this case but it will be a risk to baby
Query for option 1 and option2/3:
If i choose option2/3 medical date will be considered as Dec 2013, so PR visa will be valid till Dec 2014.My child birth will be in June 2014 and birth certificate, passport, addition to our family will take some time and we will get visa stamping in Oct/Nov 2014.so we will get only one month time to land.
If i choose option 1 then medical for all will happen in June 2014 and so PR visa validity will be till June 2015.so even if we get visa stamping in oct/nov 2014, we will get only 7 month time to land.
Please suggest which option i should take after considering queries of each option
noap its declared on that duration but during that time CIC was working of applications of late aug and early sept. so whenever it declared as filled the application which got PER only are in safe zone else are not within the CAPPrabh2132 said:Hi Vats,
As far as i remeber, NOC 2132 cap was filled in the month of november.
irfanyusuf said:Forum mates I need your suggestion. I have been blessed with a baby boy last Saturday. Should I immediately submit the updated information, the new generic form, additional Family Information along with other required particulars at this stage or should I wait for the response from LVO first on my previous application in terms of MR. Based on the information other guys who got MR, I think VO again asks for the updates at that stage as well. Just for easy ref. I have already got my PER in July 2013 and now my file would be with LVO and the processing is expected to be started in early part of 2014.
Thanks parag for sharing the link. It is very useful. Also on the link there is a line:ryt2parag said:Hi Vedh,
You will find all questions answered at http://www.lilavatihospital.com/visa_investigation.aspx.
Call them if you have any specific questions.
FYI..I am visiting them for medicals this Saturday
I got what u said.. but at the time of sending my application i cleared the same thing with my case representative and as per them the number of applications shown on CIC website is the total no. of application received towards the cap, not the applications with PER.Vats said:noap its declared on that duration but during that time CIC was working of applications of late aug and early sept. so whenever it declared as filled the application which got PER only are in safe zone else are not within the CAP
I hope you got it