Hi! My first time posting here.
I wonder if anyone is in the same boat as I am. I applied on April, 6 and been waiting ever since. GSMC notes (ordered in Sep) have shown that I've been approved back in April and yet here I am, 8 months later with no response from IRCC whatsoever. I don't even know what to think by now. Multiple webforms have been raised, to which I've received either a generic reply or no reply whatsoever (It seems to me recently they've stopped replying). So I wonder if there are other people who've been waiting for their SP since forever with final approvals in GSMC.
Applied: April, 6.
Biometrics: April, 8.
BVL: April, 29.
GSMC: Sep, 20. (Show final approval, OPR - not started.)
Primary office: Manila (I applied from Japan)
AIP: None issued.
DLI: College added on Nov, 3.
I wonder if anyone is in the same boat as I am. I applied on April, 6 and been waiting ever since. GSMC notes (ordered in Sep) have shown that I've been approved back in April and yet here I am, 8 months later with no response from IRCC whatsoever. I don't even know what to think by now. Multiple webforms have been raised, to which I've received either a generic reply or no reply whatsoever (It seems to me recently they've stopped replying). So I wonder if there are other people who've been waiting for their SP since forever with final approvals in GSMC.
Applied: April, 6.
Biometrics: April, 8.
BVL: April, 29.
GSMC: Sep, 20. (Show final approval, OPR - not started.)
Primary office: Manila (I applied from Japan)
AIP: None issued.
DLI: College added on Nov, 3.