I did some basic number crunching to calculate average PPR date for FSW-O, India resident applicants and below is the analysis (Based on data from Immitracker)
Average from Sep-1 till date: 150 days
From Oct-1 till date: 137 days
Average for Sep1 - October 31 : 148 days
I calculated September, October only as well, because that was the largest Dataset available.
So, Indian residents can put aside their anxiety till 150 days I guess. That is a looooong time :-(
Average from Sep-1 till date: 150 days
From Oct-1 till date: 137 days
Average for Sep1 - October 31 : 148 days
I calculated September, October only as well, because that was the largest Dataset available.
So, Indian residents can put aside their anxiety till 150 days I guess. That is a looooong time :-(