Deesavids said:
Congz zainy am soo happy for you
.I applied in the same month and i pray i get to have a positive reply too
This is my timeline
App recd may 21 2015
In process june 24 2015
Sponsor apprvd july15 2015 and file sent to dar es salaam
Right now am jst prayg soo hard that all goes well
And thanks for creatg this page
Thank you, and you're very welcome.
Here is my story guys - As I mentioned, I received an email from the DSM VO requesting my passport, however, there was no mailing address or any instructions attached which I found odd. Anyway, after a couple of emails back and forth to NRB and DSM VO, I received a response from NRB giving me their mailing address. At this point, I was really confused because CIC had noted that my documents were sent to DSM despite me checking NRB on the application.
I mentioned this in the email just to clarify, and I was informed that my application is in NRB and not DSM, so to send my passport to NRB.
Here's what I'm guessing happened and I could be completely wrong. I believe the overflow from NRB is being sent to DSM just to review basic information and then sent back to NRB to finalize? Since I am a Kenyan citizen, DSM cannot stamp my passport.
Just wanted to keep you all posted in case anyone else is in the same situation.
The good news is that things are moving fast, so hang in there my friends!